CurbScoop
CurbScoopBuildings100 WEST 141 STREET

100 WEST 141 STREET

Manhattan· built 1920class D4BBL 1020090033

100 WEST 141 STREET is a 53-unit building in Manhattan, built in 1920.

2 units are on the market here right now.

City records show 30 DOB permits and 73 open violations on file.

Units (res)
53
Floors
7.0
Lot ft²
11,990 ft²
Bldg ft²
65,036 ft²
Assessed
$2.65M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
100 WEST 141 STREET #26
Manhattan · built 1920
-$425K-0 ft²2 bd · 1 ba-18
33 HPD-C6 DOBbedbug
61.8Source
100 WEST 141 STREET #23
Manhattan · built 1920
-$350K$354990 ft²4 bd · 1 ba-243
33 HPD-C6 DOBbedbug
61.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 61, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 4, 2025 · #61 · VIOLATION CLOSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Nov 4, 2025 · #43 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
    Nov 4, 2025 · NOV SENT OUT
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 58, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 15, 2025 · #58 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 58, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 15, 2025 · #58 · VIOLATION CLOSED
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 58, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Aug 15, 2025 · #58 · VIOLATION CLOSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 57, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 13, 2025 · #57 · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PADLOCK AT DOOR LEADING TO FIRE ESCAPE IN THE 1st ROOM FROM NORTH LOCATED AT APT 57, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 13, 2025 · #57 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCK DOOR AT CELLAR
    Dec 12, 2024 · NOV SENT OUT
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 37, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 12, 2024 · #37 · NOV SENT OUT
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 27, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 12, 2024 · #27 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FRAME AT BUILDING ENTRANCE
    Oct 23, 2024 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILNG AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 57, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 23, 2024 · #57 · NOT COMPLIED WITH
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILNG IN THE BATHROOM LOCATED AT APT 57, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 23, 2024 · #57 · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILNG AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 57, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 23, 2024 · #57 · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 43, 4th STORY
    Sep 27, 2024 · #43 · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 46, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
    Sep 9, 2024 · #46 · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ FT AT CEILING AND 4 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 61, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 1, 2023 · #61 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 61, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 1, 2023 · #61 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
    Oct 1, 2023 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 61, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 1, 2023 · #61 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 61, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 1, 2023 · #61 · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ FT AT CEILING AND 4 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 61, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16275713 ISSUED 01-OCT-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Oct 1, 2023 · #61 · NOT COMPLIED WITH
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 61, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 1, 2023 · #61 · NOV SENT OUT
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 61, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 1, 2023 · #61 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 26, 2022 · #43 · NOT COMPLIED WITH
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
    Oct 26, 2022 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING AT PUBLIC HALL, 1st STORY
    Oct 26, 2022 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY
    Oct 26, 2022 · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 14068007 ISSUED 10-MAR-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Mar 10, 2021 · #43 · DEFECT LETTER ISSUED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 10, 2021 · #43 · NOT COMPLIED WITH
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS IN THE ENTRANCE LOCATED AT APT 55, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 10, 2021 · #55 · VIOLATION CLOSED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 10, 2021 · #43 · NOT COMPLIED WITH
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS IN THE ENTRANCE LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 10, 2021 · #43 · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY
    Mar 10, 2021 · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 10, 2021 · #43 · VIOLATION CLOSED
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 55, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 8, 2018 · #55 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SADDLE, IN THE KITCHEN LOCATED AT APT 46, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 8, 2018 · #46 · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING TREADS AND METAL PANS 1 THRU 16 AT PUBLIC HALL STAIRS, 4th STORY
    Mar 2, 2016 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING TREADS AND METAL PANS 1 THRU 16 AT PUBLIC HALL STAIRS, 6th STORY
    Mar 2, 2016 · VIOLATION CLOSED
DOB permits (last 30)
  • OT-
    MARK CONTRACTING NY INC
  • OT-
    MULTI-PAK CORP.
  • PL-
    D/L PLUMBING/HEATING
  • SP-
    D/L PLUMBING/HEATING
  • PL-
    AAA TOTAL PLUMBING, INC
  • PL-
    AAA TOTAL PLUMBING, INC
  • PL-
    VSP MECHANICAL INC
  • OT-
    MARK CONTRACTING NY INC
  • EQ-
    M.S.S. CONSTRUCTION CORP
  • OT-
    MARK CONTRACTING NY 1 INC
  • EQ-
    JSEO STUDIO INC
  • OT-
    JSEO STUDIO INC
  • MH-
    JSEO STUDIO INC
  • EQ-
    L B CONST NY INC
  • PL-
    EMR MECHANICAL CORP
  • FS-
    A&C HEATING SERVICES INC
  • FB-
    A&C HEATING SERVICES INC
  • BL-
    A&C HEATING SERVICES INC
  • OT-
    E.G.&E.NEW YORK CONTRACTI
  • OT-
    MARK CONTRACTING NY INC
  • PL-
    EDWARD ESBIN AND SONS ,INC.
  • OT-
    DARRINGTON DALY
  • OT-
    MARK CONTRACTING NY INC
  • OT-
    DARRINGTON DALY
  • OT-
    MARK CONTRACTING NY INC
  • OT-
    EXPO DEVELOPMENT CORP
  • OT-
    E.G.&E.NEW YORK CONTRACTI
  • OT-
    ZIBI CONSTRUCTION INC
  • MH-
    ZIBI CONSTRUCTION INC
  • PL-
    TAK PLUMBING & HEATING CO
DOB violations
  • Feb 22, 2022FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jun 29, 2020EARCX-FAILURE TO SUBMIT EER NONE
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Dec 21, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jan 2, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 1, 2014BENCH-FAILURE TO BENCHMARK NONE
  • Oct 28, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Dec 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Jan 25, 2011E-ELEVATOR ELEVATORREQUIRED
  • Apr 15, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2007L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Oct 12, 2006E-ELEVATOR ELEVATORREQUIRED
  • Mar 24, 2005E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2004LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 9, 2001C-CONSTRUCTION OTHER OPTIONAL
  • Feb 9, 2001C-CONSTRUCTION OTHER OPTIONAL
  • Oct 26, 2000LL10/80-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL
  • Oct 26, 2000LL10/80-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL
  • Feb 7, 2000LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 13, 1997LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 13, 1997LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jul 28, 1995ES-ELECTRIC SIGNS NONE
  • Jul 28, 1995ES-ELECTRIC SIGNS NONE
  • Sep 1, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jul 1, 1992LL1080-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL
  • Feb 1, 1990E-ELEVATOR ELEVATORREQUIRED
  • Oct 17, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Manhattan

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:1020090033

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 8, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
51 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
92 violations in the current corpus · latest record May 1, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
33 violations in the current corpus · latest record Feb 22, 2022

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.