CurbScoop
CurbScoopBuildingsTwo Bridges225 CHERRY STREET

225 CHERRY STREET

Manhattan· Two Bridges· built 2015class RMBBL 1002487501

225 CHERRY STREET is a 1,021-unit building in Two Bridges, Manhattan, built in 2015.

47 units are on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
1,021
Floors
72.0
Lot ft²
94,619 ft²
Bldg ft²
1,099,034 ft²
Assessed
$244.3M
DOF total
Comps L5y
0

Active sale listings (47)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
252 South Street #45F
Manhattan · built 2015
Two Bridges$1.39M$1,925722 ft²1 bd · 1 ba-294
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #72F
Manhattan · built 2015
Two Bridges$2.63M$2,2571,163 ft²2 bd · 2 ba-45
137 HPD-C27 DOBbedbug
255.8Source
1 MANHATTAN SQUARE #36C
Manhattan · built 2015
Two Bridges$3.00M$2,0141,487 ft²3 bd · 3 ba-243
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #23C
Manhattan · built 2015
Two Bridges$1.29M$1,863695 ft²1 bd · 1 ba-194
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #35E
Manhattan · built 2015
Two Bridges$1.35M$1,945694 ft²1 bd · 1 ba-40
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #49C
Manhattan · built 2015
Two Bridges$3.63M$2,4451,487 ft²3 bd · 3 ba-41
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #17J
Manhattan · built 2015
Two Bridges$1.22M$1,746696 ft²1 bd · 1 ba-3
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #22H
Manhattan · built 2015
Two Bridges$2.23M$1,9331,156 ft²2 bd · 2 ba-60
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #20J
Manhattan · built 2015
Two Bridges$1.31M$1,889696 ft²1 bd · 1 ba-3
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #68K
Manhattan · built 2015
Two Bridges$1.59M$2,286695 ft²1 bd · 1 ba-371
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #59L
Manhattan · built 2015
Two Bridges$1.59M$2,243709 ft²1 bd · 1 ba-85
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #76E
Manhattan · built 2015
Two Bridges$2.85M$2,0391,400 ft²3 bd · 2 ba-748
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #39F
Manhattan · built 2015
Two Bridges$1.44M$1,994722 ft²1 bd · 1 ba-15
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #41G
Manhattan · built 2015
Two Bridges$2.24M$1,9371,156 ft²2 bd · 2 ba-12
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #58J
Manhattan · built 2015
Two Bridges$5.70M$2,4312,345 ft²3 bd · 3 ba-303
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #27L
Manhattan · built 2015
Two Bridges$2.27M$2,0261,123 ft²2 bd · 2 ba-451
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #8J
Manhattan · built 2015
Two Bridges$1.18M$1,695696 ft²1 bd · 1 ba-1182
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #77J
Manhattan · built 2015
Two Bridges$6.45M$2,7482,347 ft²3 bd · 3 ba-319
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #11F
Manhattan · built 2015
Two Bridges$1.20M$1,727695 ft²1 bd · 1 ba-10
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #64G
Manhattan · built 2015
Two Bridges$1.48M$2,144688 ft²1 bd · 1 ba-198
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #71A
Manhattan · built 2015
Two Bridges$3.78M$2,2681,667 ft²3 bd · 3 ba-104
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #22J
Manhattan · built 2015
Two Bridges$1.30M$1,875696 ft²1 bd · 1 ba-458
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #51L
Manhattan · built 2015
Two Bridges$2.50M$2,1191,180 ft²2 bd · 2 ba-91
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #19A
Manhattan · built 2015
Two Bridges$2.08M$1,7861,162 ft²2 bd · 2 ba-205
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #8L
Manhattan · built 2015
Two Bridges$1.90M$1,6871,123 ft²2 bd · 2 ba-180
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #52N
Manhattan · built 2015
Two Bridges$1.53M$2,116723 ft²1 bd · 1 ba-129
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #33N
Manhattan · built 2015
Two Bridges$1.30M$1,795723 ft²1 bd · 1 ba-134
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #20A
Manhattan · built 2015
Two Bridges$2.19M$1,8891,162 ft²2 bd · 2 ba-1
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #22C
Manhattan · built 2015
Two Bridges$1.29M$1,863695 ft²1 bd · 1 ba-104
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #42G
Manhattan · built 2015
Two Bridges$2.23M$1,9291,156 ft²2 bd · 2 ba-75
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #20F
Manhattan · built 2015
Two Bridges$1.34M$1,935695 ft²1 bd · 1 ba-3
137 HPD-C27 DOBbedbug
255.8Source
1 MANHATTAN SQUARE #49L
Manhattan · built 2015
Two Bridges$2.75M$2,3441,173 ft²2 bd · 2 ba-348
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #17P
Manhattan · built 2015
Two Bridges$1.33M$1,840723 ft²1 bd · 1 ba-70
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #68F
Manhattan · built 2015
Two Bridges$2.58M$2,2181,163 ft²2 bd · 2 ba-2
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #21F
Manhattan · built 2015
Two Bridges$1.20M$1,725695 ft²1 bd · 1 ba-65
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #51D
Manhattan · built 2015
Two Bridges$2.46M$2,1181,164 ft²2 bd · 2 ba-493
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #47B
Manhattan · built 2015
Two Bridges$2.00M$1,9341,034 ft²2 bd · 2 ba-132
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #26N
Manhattan · built 2015
Two Bridges$1.28M$1,849695 ft²1 bd · 1 ba-116
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #28A
Manhattan · built 2015
Two Bridges$2.76M$2,3731,162 ft²2 bd · 2 ba-5
137 HPD-C27 DOBbedbug
255.8Source
1 MANHATTAN SQUARE #36C
Manhattan · built 2015
Two Bridges$3.25M$2,1861,487 ft²3 bd · 3 ba-184
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #71K
Manhattan · built 2015
Two Bridges$1.66M$2,406688 ft²1 bd · 1 ba-1
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #66H
Manhattan · built 2015
Two Bridges$1.55M$2,283679 ft²1 bd · 1 ba-95
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #40G
Manhattan · built 2015
Two Bridges$2.43M$2,1021,156 ft²2 bd · 2 ba-48
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #40C
Manhattan · built 2015
Two Bridges$3.38M$2,2701,487 ft²3 bd · 3 ba-180
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #68K
Manhattan · built 2015
Two Bridges$1.64M$2,353695 ft²1 bd · 1 ba-304
137 HPD-C27 DOBbedbug
255.8Source
252 SOUTH STREET #41G
Manhattan · built 2015
Two Bridges$2.43M$2,1021,156 ft²2 bd · 2 ba-118
137 HPD-C27 DOBbedbug
255.8Source
252 South Street #77B
Manhattan · built 2015
Two Bridges$2.46M$2,3791,034 ft²2 bd · 2 ba-340
137 HPD-C27 DOBbedbug
255.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 6th APARTMENT FROM EAST AT SOUTH
    Sep 3, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 6th APARTMENT FROM EAST AT SOUTH
    Sep 3, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 6th APARTMENT FROM EAST AT SOUTH
    Sep 3, 2026 · #4F · VIOLATION OPEN
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 5th APARTMENT FROM WEST AT NORTH
    Aug 24, 2026 · #4R · VIOLATION OPEN
  • B
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE DRAIN LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST
    Aug 23, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST
    Aug 23, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST
    Aug 23, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
    Aug 23, 2026 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING TO JANITOR CLOSET AT SOUTH AT PUBLIC HALL, 3rd STORY
    Aug 3, 2026 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASEBOARD AT WEST AND NORTH WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 4F, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST
    Aug 3, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER BASE CABINET AT WEST WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST
    Aug 3, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE STRIKER PLATE AT ENTRANCE DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 4F, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST
    Aug 3, 2026 · #4F · VIOLATION OPEN
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS AT LAUNDRY ROOM, 3rd STORY
    Aug 3, 2026 · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST
    Aug 3, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 4F, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST
    Aug 3, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST
    Aug 3, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST
    Aug 3, 2026 · #4F · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING REFUSE ROOM AT NORTH AT PUBLIC HALL, 4th STORY
    Aug 3, 2026 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET IN THE ENTRANCE LOCATED AT APT 4F, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST
    Aug 3, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT DOOR IN THE ENTRANCE LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM WEST AT NORTH
    Jul 2, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DRAW AT WOOD BASE CABINET IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM WEST AT NORTH
    Jul 2, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM WEST AT NORTH
    Jul 2, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM WEST AT NORTH
    Jul 2, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE TILES AT THE WEST WALL AT PUBLIC HALL, 1st STORY
    Jun 28, 2026 · VIOLATION OPEN
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE, THE FIRST LOWER PANE FROM SOUTH AT EAST OF THE WEST EXTERIOR WALL OF THE RESIDENTIAL BUILDING FRONT 227 CHERRY STREET , 1st STORY
    Jun 28, 2026 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE TILES AT THE SOUTH WALL AT PUBLIC HALL, 1st STORY
    Jun 28, 2026 · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 8F, 7th STORY, 5th APARTMENT FROM SOUTH AT WEST
    Jun 24, 2026 · #8F · VIOLATION OPEN
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 8F, 7th STORY, 5th APARTMENT FROM SOUTH AT WEST
    Jun 24, 2026 · #8F · VIOLATION OPEN
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 8F, 7th STORY, 5th APARTMENT FROM SOUTH AT WEST
    Jun 24, 2026 · #8F · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS WINDOW PANE AT SOUTH WALL AT PUBLIC HALL, 1st STORY
    Jun 24, 2026 · VIOLATION OPEN
  • B
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT BATHTUB WASTELINE IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 19, 2026 · #4F · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL. IN THE 1st ROOM FROM EAST LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 19, 2026 · #4F · VIOLATION OPEN
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE OUTTER GLASS PANEL, AT BUILDING FRONT ,NEXT TO BUILDING ENTRANCE DOOR
    Jun 19, 2026 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DRAWER AT BASE CABINET AT NORTH WALL. IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 19, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 19, 2026 · #4F · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCHSET IN THE ENTRANCE LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 19, 2026 · #4F · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 10N, 8th STORY, 8th APARTMENT FROM NORTH AT EAST
    May 24, 2026 · #10N · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 8F, 7th STORY, 5th APARTMENT FROM SOUTH AT WEST
    May 19, 2026 · #8F · NOV SENT OUT
  • C
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRING AT WEST WALL AT PUBLIC HALL, 1st STORY
    May 19, 2026 · NOV SENT OUT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8F, 7th STORY, 5th APARTMENT FROM SOUTH AT WEST
    May 19, 2026 · #8F · NOV SENT OUT
DOB permits (last 30)
  • PL-
    MEDCO PLUMBING INC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • NB-
    MONADNOCK CONSTRUCTION IN
  • NB-
    LENDLEASE(US)CONSTRUCTION
  • EQ-
    SAFWAY ATLANTIC, LLC
  • NB-
    LENDLEASE(US)CONSTRUCTION
  • FO-
    LEND LEASE (US) CONSTRUCT
  • NB-
    LEND LEASE (US) CONSTRUCT
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • MH-
    RB HEATING CONSULTING GRP
  • FS-
    RB HTG CONSULTING GROUP
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • SP-
    RAEL AUTOMATIC SPR. CO.IN
  • SP-
    RAEL AUTOMATIC SPR. CO.IN
  • OT-
    MONADNOCK CONSTRUCTION IN
  • NB-
    LENDLEASE(US)CONSTRUCTION
  • EQ-
    SAFWAY ATLANTIC, LLC
DOB violations
  • Oct 16, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 21, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 3, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Mar 6, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 3, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 29, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 7, 2020E-ELEVATOR ELEVATORREQUIRED

More buildings in Two Bridges

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1002487501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
47 active sale listings in the current corpus · latest record Aug 21, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
132 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
421 violations in the current corpus · latest record Sep 3, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
47 violations in the current corpus · latest record Mar 14, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Two Bridges market page.