CurbScoop
CurbScoopBuildingsHell's Kitchen322 WEST 57 STREET

322 WEST 57 STREET

Manhattan· Hell's Kitchen· built 1978class RMBBL 1010477503
Open listing source

322 WEST 57 STREET is a 583-unit building in Hell's Kitchen, Manhattan, built in 1978.

4 units are on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
583
Floors
50.0
Lot ft²
52,868 ft²
Bldg ft²
813,798 ft²
Assessed
$148.4M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
322 WEST 57 STREET #42H3
Manhattan · built 1978
Hell's Kitchen$4.60M$2,1062,184 ft²3 bd · 3 ba-56
6 HPD-C2 DOBbedbug
19.6Source
322 WEST 57 STREET #37HK
Manhattan · built 1978
Hell's Kitchen$4.80M$2,4581,953 ft²3 bd · 3 ba-128
6 HPD-C2 DOBbedbug
19.6Source
322 WEST 57 STREET #30B
Manhattan · built 1978
Hell's Kitchen$2.40M$1,7841,345 ft²2 bd · 2 ba-58
6 HPD-C2 DOBbedbug
19.6Source
322 West 57th Street #24C
Manhattan · built 1978
Hell's Kitchen$1.29M$1,704760 ft²1 bd · 1 ba-99
6 HPD-C2 DOBbedbug
19.6Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WALLPAPER AT NORTH WALL AT PUBLIC HALL, 57th STORY
    Aug 28, 2026 · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL AT PUBLIC HALL, 57th STORY
    Aug 28, 2026 · VIOLATION OPEN
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CARPET AT PUBLIC HALL, 57th STORY
    Aug 28, 2026 · VIOLATION OPEN
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 57th STORY
    Aug 28, 2026 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 57th STORY
    Aug 28, 2026 · VIOLATION OPEN
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE STOPPER AT BATHTUB IN THE 3rd BATHROOM FROM NORTH LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT CLOSET FROM SOUTH AT WEST IN THE PRIVATE HALLWAY LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AT CLOSET FROM SOUTH AT WEST IN THE PRIVATE HALLWAY LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''F-K''
    Aug 28, 2026 · #57K · VIOLATION OPEN
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE ENTRANCE LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILNG AND WEST WALL IN THE ENTRANCE LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE ENTRANCE LOCATED AT APT 57K, 48th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 25, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
    Jun 13, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
    Jun 13, 2026 · #57K · VIOLATION OPEN
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
    Apr 29, 2026 · #57K · NOV SENT OUT
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
    Apr 29, 2026 · #57K · NOV SENT OUT
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE TUB STOPPER AT BATHTUB IN THE BATHROOM LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
    Apr 29, 2026 · #57K · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
    Apr 29, 2026 · #57K · NOV SENT OUT
  • I
    § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS 19Q, VACATE #260595 IN THE ENTIRE APARTMENT LOCATED AT APT, 19th STORY, 4th APARTMENT FROM NORTH AT EAST
    Apr 6, 2026 · INFO NOV SENT OUT
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT 19Q, 19th STORY, 4th APARTMENT FROM NORTH AT EAST
    Apr 1, 2026 · #19Q · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW LIMITER AT CASEMENT WINDOW AT EAST IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 24, 2026 · #57K · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW LIMITER AT CASEMENT WINDOW AT EAST IN THE 4th ROOM FROM NORTH LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 24, 2026 · #57K · NOV SENT OUT
  • C
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 57K, 57th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 24, 2026 · #57K · NOV SENT OUT
DOB permits (last 30)
  • OTApr 19, 2017
    CROSS CONSULTING INC
  • PLMar 2, 2016
    SO PLUMBING & HEATING INC
  • FS-
    C C CONTROLLED COMBUSTION
  • OT-
    TURNER CONSTRUCTION COM
  • MH-
    TURNER CONSTRUCTION COM
  • SP-
    PREFERRED SPRKLR & MECH C
  • OT-
    MAC GLOBAL DESIGN & RENOV
  • OT-
    CROSS CONSULTING INC
  • OT-
    KAY WATERPROOFING CORP
  • OT-
    QUALITY REN CONTRACT INC
  • OT-
    MAC GLOBAL DESIGN & RENOV
  • PL-
    ORBIT PLBG & HTG INC
  • PL-
    P.S.I. MECHANICAL
  • SP-
    DEMAR PLUMBING CORP
  • MH-
    CROSS CONSULTING INC
  • PL-
    DEMAR PLUMBING CORP
  • OT-
    CROSS CONSULTING INC
  • OT-
    IGX CONSTRUCTION LLC
  • MH-
    IGX CONSTRUCTION LLC
  • PL-
    MASTER 2 PLBG & HTG INC
  • OT-
    BLU CONTRACTING INC
  • PL-
    CITYWIDE FIRE SYS PLBG EN
  • PL-
    CITYWIDE FIRE SYS PLBG EN
  • OT-
    TURNER CONSTRUCTION COM
  • MH-
    TURNER CONSTRUCTION COM
  • PL-
    GAB PLBG SVC CONTR, INC
  • OT-
    IMPACT BUILDERS CORP
  • PL-
    COD MECHANICAL CORP
  • OT-
    RENOVATION BY MY HOME INC
  • SP-
    PREFERRED SPKLR AND MECH
DOB violations
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Apr 1, 2021E-ELEVATOR ELEVATORREQUIRED
  • Apr 1, 2021E-ELEVATOR ELEVATORREQUIRED
  • Dec 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Dec 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 8, 2018FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Oct 4, 2015C-CONSTRUCTION OTHER OPTIONAL
  • Aug 12, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 11, 2015P-PLUMBING NONE
  • Jun 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Aug 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2013E-ELEVATOR ELEVATORREQUIRED

More buildings in Hell's Kitchen

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1010477503

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record May 7, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
253 permits in the current corpus · latest record Apr 19, 2017

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
78 violations in the current corpus · latest record Aug 28, 2026

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
64 violations in the current corpus · latest record Jan 4, 2024

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Hell's Kitchen market page.