CurbScoop

75 WALL STREET

Manhattan· Financial District· built 1987class RMBBL 1000317501
Open listing source

75 WALL STREET is a 346-unit building in Financial District, Manhattan, built in 1987.

3 units are on the market here right now.

City records show 30 DOB permits and 73 open violations on file.

Units (res)
346
Floors
36.0
Lot ft²
30,794 ft²
Bldg ft²
542,494 ft²
Assessed
$86.0M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
75 WALL STREET #36F
Manhattan · built 1987
Financial District$2.00M$1,1891,682 ft²2 bd · 3 ba-424
3 HPD-C20 DOBbedbug
24.8Source
75 WALL STREET #27J
Manhattan · built 1987
Financial District$625K-0 ft²studio · 1 ba-405
3 HPD-C20 DOBbedbug
24.8Source
75 WALL STREET #36F
Manhattan · built 1987
Financial District$2.00M$1,1891,682 ft²2 bd · 3 ba-403
3 HPD-C20 DOBbedbug
24.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
    Apr 30, 2024 · #34C · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
    Apr 30, 2024 · #34C · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
    Apr 30, 2024 · #34C · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
    Apr 30, 2024 · #34C · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST''
    Apr 30, 2024 · #34C · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AND THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 20, 2023 · #34C · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING IN THE KITCHEN LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 20, 2023 · #34C · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ FT AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 38N, 38th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 12, 2022 · #38N · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ FT AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 38N, 38th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 15113251 ISSUED 12-APR-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Apr 12, 2022 · #38N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 38N, 38th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 12, 2022 · #38N · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 38N, 38th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 12, 2022 · #38N · NOV SENT OUT
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 38N, 38th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 12, 2022 · #38N · NOV SENT OUT
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, NORTH AND WEST WALLS IN THE FOYER LOCATED AT APT 38N, 38th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 18, 2021 · #38N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH AND WEST WALLS IN THE FOYER LOCATED AT APT 38N, 38th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 18, 2021 · #38N · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Jun 18, 2021 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Jun 18, 2021 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Jun 18, 2021 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 24, 2019 · #34C · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Feb 24, 2019 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Feb 24, 2019 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Feb 24, 2019 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Feb 24, 2019 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOWFRAME AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 24, 2019 · #34C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 24, 2019 · #34C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 34C, 34th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 24, 2019 · #34C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEIING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 35N, 35th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 20, 2018 · #35N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 35N, 35th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 20, 2018 · #35N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 35N, 35th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 20, 2018 · #35N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 35N, 35th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 20, 2018 · #35N · NOV SENT OUT
  • C
    SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 35A, 35th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Nov 8, 2012 · #35A · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 35A, 35th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Nov 8, 2012 · #35A · NOV CERTIFIED LATE
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 35A, 35th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Nov 8, 2012 · #35A · NOV CERTIFIED LATE
  • C
    SECTION 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 35A, 35th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Nov 8, 2012 · #35A · VIOLATION DISMISSED
DOB permits (last 30)
  • SP-
    BORIS MECHANICAL, INC
  • OT-
    HIGH QUALITY CONSTRUCTION
  • PL-
    PLUMBING & HTG DOCTOR INC
  • SP-
    FORWARD MECHANICAL CORP
  • BL-
    NEW AMSTERDAM PLBG & HTG
  • AL-
    WORLD CLASS CONSTRUCTION
  • OT-
    YATES REST GROUP LTD
  • PL-
    NEW AMSTERDAM PLBG & HTG
  • PL-
    FORWARD HEATING CORP
  • PL-
    NEW AMSTERDAM PLBG & HTG
  • OT-
    E S M CONSTRUCTION CORP
  • EQ-
    ES CONTRUCTION CORP.
  • AL-
    ES CONTRUCTION CORP.
  • OT-
    SAMIRO SERVICES INC
  • FP-
    ALLIED FIRE CONTROL SVCS
  • OT-
    E S M CONSTRUCTION CORP
  • MH-
    E S M CONSTRUCTION CORP
  • OT-
    E S M CONSTRUCTION CORP
  • EQ-
    SPRING SCAFFOLDING LLC
  • EQ-
    SPRING SCAFFOLDING LLC
  • PL-
    FORWARD MECHANICAL CORP
  • EQ-
    SPRING SCAFFOLDING LLC
  • EQ-
    SPRING SCAFFOLDING LLC
  • EQ-
    ES CONTRUCTION CORP.
  • AL-
    ES CONTRUCTION CORP.
  • FP-
    ALLIED FIRE CONTROL SVCS
  • EQ-
    ESM CONSTRUCTION CORP
  • AL-
    ESM CONSTRUCTION CORP
  • AL-
    WORLD CLASS CONSTRUCTION
  • PL-
    MJM PLUMBING INC
DOB violations
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 21, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 19, 2024C-CONSTRUCTION OTHER OPTIONAL
  • Feb 19, 2024C-CONSTRUCTION OTHER OPTIONAL
  • Dec 21, 2023C-CONSTRUCTION OTHER OPTIONAL
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2019E-ELEVATOR ELEVATORREQUIRED

More buildings in Financial District

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1000317501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record May 27, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
65 permits in the current corpus

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
33 violations in the current corpus · latest record Oct 3, 2025

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
106 violations in the current corpus · latest record Nov 14, 2025

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Financial District market page.