45 SUTTON PLACE SOUTH
Units (res)
278
Floors
20.0
Lot ft²
30,463 ft²
Bldg ft²
510,547 ft²
Assessed
$66.1M
DOF total
Comps L5y
0
Active sale listings (4)
| Address | Neighborhood | Price | $/ft² | Sqft | Beds/Baths | vs comp | DOM | Risk | Score | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 45 SUTTON PLACE #11K Manhattan · built 1958 | Sutton Place | $1.59M | - | 0 ft² | 2 bd · 2 ba | - | 141 | bedbug | 7.0 | Source | |
| 45 SUTTON PLACE SOUTH #12I Manhattan · built 1958 | Sutton Place | $1.63M | - | 0 ft² | 2 bd · 2 ba | - | 22 | bedbug | 7.0 | Source | |
| 45 SUTTON PLACE #PHI Manhattan · built 1958 | Sutton Place | $2.20M | - | 0 ft² | 2 bd · 2 ba | - | 75 | bedbug | 7.0 | Source | |
| 45 SUTTON PLACE SOUTH #5A Manhattan · built 1958 | Sutton Place | $950K | $1,022 | 930 ft² | 1 bd · 1 ba | - | 98 | bedbug | 7.0 | Source |
Transaction history (0)
Every recorded deed for this tax lot.
No recorded transactions for this BBL yet.
Building risk + activity
HPD violations (last 40)
- B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 11K, 11th STORY, 1st APARTMENT FROM NORTH AT EASTJun 21, 2024 · #11K · NOV SENT OUT
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Apr 1, 2024 · VIOLATION DISMISSED
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Mar 15, 2023 · VIOLATION DISMISSED
- B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ....THE NORTH WALL IN THE CLOSET IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''north''Apr 30, 2021 · #3A · NOV SENT OUT
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Apr 1, 2021 · VIOLATION DISMISSED
DOB permits (last 30)
- OTMar 6, 2006TADDEO CONSTRUCTION INC
- SPJan 10, 2005RAEL AUTOMATIC SPRINKLER CO INC
- OTJun 2, 1993L & M LARJO CO INC
- OT-MAJESTIC HOME IMPROVERMEN
- PL-BASS MECHANICAL CORP
- MH-B & H RESTORATION INC
- SP-RAEL AUTOMATIC SPRINKLER CO INC
- OT-LEEWAY CONST MGMT CORP
- PL-EXPRESS PLBG HTG&GAS LEAK
- OT-RIVERBEND MILL, LLC
- PL-BASS MECH. CORP
- PL-M C M PLBG & HTG, INC
- OT-HITE CONSTRUCTION INC
- MH-HITE CONSTRUCTION INC
- MH-RIVERBEND MILL, LLC
- OT-MINCH CONSTRUCTION CORP
- OT-KING ROSE OF NY, INC
- MH-KING ROSE OF NY, INC
- PL-ABSOLUTE PLBG & HTG CORP
- OT-ZALE CONTRACTING INC
- MH-ZALE CONTRACTING INC
- PL-L.L.G. PLBG & HTG INC
- OT-SKILLMAN PLMB & HTG
- PL-ORBIT PLBG & HTG INC
- OT-AZCC BUILDERS INC
- OT-SLATTERY SKANSKA, INC.
- OT-ACCURA REST.& WATERPROOF
- OT-CAYLEY BARRETT ASSOCIATES
- OT-GREEN CONVERSIONS INC
- OT-GATEWAY DEMOL CORP