CurbScoop
CurbScoopBuildingsSutton Place430 EAST 56 STREET

430 EAST 56 STREET

Manhattan· Sutton Place· built 1955class D4BBL 1013670035
Open listing source

430 EAST 56 STREET is an 82-unit building in Sutton Place, Manhattan, built in 1955.

1 unit is on the market here right now.

City records show 30 DOB permits and 72 open violations on file.

Units (res)
82
Floors
13.0
Lot ft²
12,560 ft²
Bldg ft²
90,000 ft²
Assessed
$9.99M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
430 EAST 56 STREET #9B
Manhattan · built 1955
Sutton Place$1.20M-0 ft²2 bd · 2 ba-48
5 HPD-C3 DOBbedbug
15.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 HMC: REFIT DOOR AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • C
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES PROVIDE ELECTRICT TO ALL ELECTRICAL FIXTURES IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING SHEETROCK AT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SHEETROCK AT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE FLOOR IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SHEETROCK AT ALL WALLS AND CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SHEETROCK AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH GLASS PANE AT WEST IN THE 1st ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING AND EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE SINK IN KITCHEN ATNORTH WALL IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • A
    § 27-2005 HMC: REFIT DOOR AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT DOOR TO TERRACE AT UPPER LEVEL IN THE 3rd ROOM FROM EAST LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 3, 2025 · #PHB · NOV SENT OUT
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE LOWER SASH AT 1ST WINDOW AT WEST AT UPPER LEVEL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND 1ST WINDOW AT WEST AT UPPER LEVEL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 3, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT DOOR TO TERRACE AT UPPER LEVEL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 3, 2025 · #PHB · NOV SENT OUT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE FLOOR IN THE 1st ROOM FROM EAST LOCATED AT PENTHOUSE PHB, 13th STORY, 1st PENTHOUSE FROM SOUTH AT WEST
    Jul 31, 2025 · #PHB · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT PENTHOUSE PHB, 13th STORY, 1st PENTHOUSE FROM SOUTH AT WEST
    Jul 31, 2025 · #PHB · NOV SENT OUT
  • C
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES LIGHT FIXTURES AND ELECTRICAL OUTLETS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT PENTHOUSE PHB, 13th STORY, 1st PENTHOUSE FROM SOUTH AT WEST
    Jul 31, 2025 · #PHB · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 15, 2023 · VIOLATION DISMISSED
  • B
    § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 12, 2010 · #6A · NOV CERTIFIED LATE
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 12, 2010 · #6A · NOV CERTIFIED LATE
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 12, 2010 · #6A · INVALID CERTIFICATION
  • B
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jul 22, 2008 · #6A · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REFIT KITCHEN SINK CABINET DOORS IN THE KITCHEN LOCATED AT APT PHB, 7th STORY
    Mar 31, 2000 · #PHB · INVALID CERTIFICATION
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT PHB, 7th STORY
    Mar 31, 2000 · #PHB · INVALID CERTIFICATION
  • A
    § 27-2005 ADM CODE REFIT KITCHEN CABBINET DOORS IN THE KITCHEN LOCATED AT APT PHB, 7th STORY
    Mar 31, 2000 · #PHB · INVALID CERTIFICATION
  • A
    § 27-2005 ADM CODE REFIT OVEN DOORS IN THE KITCHEN LOCATED AT APT PHB, 7th STORY
    Mar 31, 2000 · #PHB · INVALID CERTIFICATION
DOB permits (last 30)
  • EQJan 25, 1993
    PORTCHESTER SCAFFOLDING
  • ALSep 6, 1991
    L& M LARJO CO INCORPORATED
  • PL-
    DERNARDD JABLON PLBG CO
  • OT-
    L& M LARJO CO INCORPORATED
  • OT-
    YACOT MANAGEMENT INC
  • PL-
    MASTER PLUMBING & HEATING CO.
  • PL-
    TOMKAT PLUMBING HEATING L
  • PL-
    PF PLUMB&HEATING, INC.
  • EQ-
    SILVERCUP SCAFFOLDING 1 L
  • OT-
    GUSTO INTERIORS INC
  • OT-
    BAYSIDE CONTRACTING INC
  • EQ-
    PORTCHESTER SCAFFOLDING
  • OT-
    GUSTO INTERIORS INC
  • MH-
    PAT GORDON CONTRACTING
  • OT-
    PAT GORDON CONTRACTING
  • SP-
    NATIONAL PLG & HTG CORP
  • PL-
    BERNARD JABLON PLUMBNG CO.
  • OT-
    CASA CARERI LLC
  • OT-
    REMY DESIGN GROUP INC
  • OT-
    RDM RENOVATION CORP
  • PL-
    MAGNUM PLUMBING & HEATING CORP.
  • OT-
    VERTICOM CONSTRUCTION
  • PL-
    Z.W PLBG & HTG CORP
  • OT-
    RDM RENOVATION CORP
  • OT-
    NEWORK GENERAL CONTRACTORS INC
  • OT-
    RONALD SCHEFF
  • MH-
    RONALD SCHEFF
  • FP-
    ALLIED FIRE CONTROL
  • MH-
    HAMILTON AIR COMPANY, INC.
  • EQ-
    PORTCHESTER SCAFFOLDING
DOB violations
  • Feb 22, 2024BENCH-FAILURE TO BENCHMARK NONE
  • Nov 2, 2023BENCH-FAILURE TO BENCHMARK NONE
  • Oct 4, 2023AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 2, 2023BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2023BENCH-FAILURE TO BENCHMARK NONE
  • Aug 10, 2021E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2018E-ELEVATOR ELEVATORREQUIRED
  • Apr 15, 2015E-ELEVATOR ELEVATORREQUIRED
  • Apr 7, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 7, 2014E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 11, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jun 11, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Jul 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 30, 2009E-ELEVATOR ELEVATORREQUIRED
  • Sep 30, 2009E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2008E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jul 19, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jul 19, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jul 24, 2003E-ELEVATOR ELEVATORREQUIRED
  • Jul 24, 2003E-ELEVATOR ELEVATORREQUIRED
  • Aug 17, 1992C-CONSTRUCTION OTHER OPTIONAL
  • Aug 17, 1992C-CONSTRUCTION OTHER OPTIONAL
  • May 31, 1989E-ELEVATOR ELEVATORREQUIRED

More buildings in Sutton Place

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 5, 2026

Stable property ID: nyc:bbl:1013670035

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Aug 30, 2026

Pipeline completed Aug 30, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 12, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 4, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
80 permits in the current corpus · latest record Jan 25, 1993

Pipeline completed Sep 4, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
39 violations in the current corpus · latest record Oct 6, 2025

Pipeline completed Sep 4, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
33 violations in the current corpus · latest record Oct 17, 2024

Pipeline completed Sep 4, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Sutton Place market page.