CurbScoop
CurbScoopBuildingsSutton Place250 EAST 57 STREET

250 EAST 57 STREET

Manhattan· Sutton Place· built 2012class W1BBL 1013300013
Open listing source

250 EAST 57 STREET is a building in Sutton Place, Manhattan, built in 2012.

2 units are on the market here right now.

City records show 30 DOB permits and 40 open violations on file.

Units (res)
0
Floors
11.0
Lot ft²
40,216 ft²
Bldg ft²
281,051 ft²
Assessed
$65.4M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
252 EAST 57 STREET #59A
Manhattan · built 2012
Sutton Place$4.00M$1,7812,246 ft²2 bd · 3 ba-420
24 DOB
12.8Source
252 East 57th St #60A
Manhattan · built 2012
Sutton Place$9.80M$2,1164,631 ft²4 bd · 4 ba-426
24 DOB
12.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
None.
DOB permits (last 30)
  • EQJan 7, 1993
    COLGATE SCAFFOLDING
  • EQ-
    BEYS SPLTY. CONTNG. INC
  • BL-
    AMD &.ASSOCIATES INC
  • OT-
    SEASONS INDUSTRIAL CONTR*
  • MH-
    SEASONS INDUSTRIAL CONTR*
  • SP-
    H.J. FLOOD INC.
  • EQ-
    COLGATE SCAFFOLDING
  • MH-
    GREENPOINT ASSOCIATES CORP.
  • EQ-
    ALL-SAFE LLC
  • EQ-
    BREEZE NATIONAL INC
  • DM-
    BREEZE NATIONAL INC
  • SP-
  • MH-
    CONSTRUCTION MANAGEMENT&*
  • OT-
    CONSTRUCTION MANAGEMENT&*
  • EQ-
    BEYS SPLTY. CONTNG. INC
  • SP-
    FIRST WOMEN'S FIRE SYS CR
  • OT-
    CONSTRUCTION MANAGEMENT&*
  • SD-
    INTERSTATE FIRE PROT. INC
  • SP-
    FIRST WOMEN'S FIRE SYS CR
  • SP-
    INTERSTATE FIRE PROT. INC
  • EQ-
    ATLANTIC HOISTING & SCAFF
  • EQ-
    ATLANTIC HOISTING & SCAFF
  • EQ-
    ATLANTIC HOISTING & SCAFF
  • EQ-
    ATLANTIC HOISTING & SCAFF
  • PL-
    B.G NATIONAL P & H INC
  • PL-
    G.J.K. MECHANICAL INC
  • EQ-
    ALL-SAFE LLC
  • EQ-
    ALL-SAFE LLC
  • FS-
    EDWARD LEVINSON
  • OT-
    BEYS SPLTY. CONTNG. INC
DOB violations
  • Jan 20, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 6, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Apr 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Apr 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Apr 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED

More buildings in Sutton Place

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1013300013

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Apr 17, 2025

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
166 permits in the current corpus · latest record Jan 7, 1993

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
179 violations in the current corpus · latest record Dec 13, 2023

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Sutton Place market page.