CurbScoop
CurbScoopBuildingsTurtle Bay253 EAST 49 STREET

253 EAST 49 STREET

Manhattan· Turtle Bay· built 1920class C7BBL 1013230122

253 EAST 49 STREET is an 8-unit building in Turtle Bay, Manhattan, built in 1920.

1 unit is on the market here right now.

City records show 6 DOB permits and 21 open violations on file.

Units (res)
8
Floors
4.0
Lot ft²
954 ft²
Bldg ft²
4,295 ft²
Assessed
$1.17M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
255 EAST 49 STREET #19D
Manhattan · built 1920
Turtle Bay$1.65M$1,2811,288 ft²2 bd · 2 ba-298
2 HPD-C2 DOBbedbug
7.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY
    May 23, 2025 · VIOLATION DISMISSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 4, 2024 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 4th STORY
    May 4, 2024 · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 4, 2024 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 4, 2024 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 3rd STORY
    May 4, 2024 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 4th STORY
    May 4, 2024 · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE SOUTH WALL PANEL IN THE FOYER LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 4, 2024 · #4N · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 3rd STORY
    May 4, 2024 · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 4, 2024 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 4, 2024 · #4N · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 14, 2023 · #2N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE APARTMENT WALL PANEL. IN THE FOYER LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 14, 2023 · #2N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 14, 2023 · #2N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE REFIT THE DOOR AT BUILDING ENTRANCE , 1st STORY
    Dec 23, 2020 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR LOCK, AT ENTRANCE TO BUILDING. , 3rd STORY
    Dec 5, 2017 · VIOLATION CLOSED
DOB permits (last 30)
  • OT-
    KIMKO BUILDERS INC
  • MH-
    KIMKO BUILDERS INC
  • PL-
    NOVA PLUMB HEAT_INC.
  • EQ-
    ATLANTIC HEYDT SCAFFOLD CORP.
  • OT-
    MILLS & WALLS CO,INC
  • BL-
    B.H. PLBG & HTG
DOB violations
  • Jun 26, 2026IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 9, 2011AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED

More buildings in Turtle Bay

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 10, 2026

Stable property ID: nyc:bbl:1013230122

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Aug 11, 2025

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 10, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
6 permits in the current corpus

Pipeline completed Sep 10, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
16 violations in the current corpus · latest record Nov 21, 2025

Pipeline completed Sep 10, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
5 violations in the current corpus · latest record Jun 26, 2026

Pipeline completed Sep 10, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Turtle Bay market page.