CurbScoop
CurbScoopBuildingsTurtle Bay305 EAST 45 STREET

305 EAST 45 STREET

Manhattan· Turtle Bay· built 1929class D4BBL 1013380005
Open listing source

305 EAST 45 STREET is a 338-unit building in Turtle Bay, Manhattan, built in 1929.

3 units are on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
338
Floors
24.0
Lot ft²
22,600 ft²
Bldg ft²
387,094 ft²
Assessed
$48.4M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
310 EAST 46 STREET #8L
Manhattan · built 1929
Turtle Bay$750K-0 ft²1 bd · 1 ba-231
21 HPD-C12 DOBbedbug
72.5Source
310 EAST 46 STREET #9S
Manhattan · built 1929
Turtle Bay$799K-0 ft²1 bd · 1 ba-93
21 HPD-C12 DOBbedbug
72.5Source
310 EAST 46 STREET #8U
Manhattan · built 1929
Turtle Bay$775K-0 ft²1 bd · 1 ba-41
21 HPD-C12 DOBbedbug
72.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 16G, 15th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 10, 2026 · #16G · NOV SENT OUT
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER TEMPERATURE EXCEEDING 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 16, 2026 · #11R · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SPOUT AT BATHTUB IN THE BATHROOM LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''310east46'', AT SOUTHEAST
    Nov 10, 2025 · #11R · NOT COMPLIED WITH
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET IN THE ENTRANCE LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jan 17, 2025 · #10B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION AT CEILING IN THE BATHROOM LOCATED AT APT 12C, 12th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 17, 2025 · #12C · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH-EAST''
    Oct 15, 2024 · #11R · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE BATHROOM LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH-EAST''
    Oct 15, 2024 · #11R · VIOLATION CLOSED
  • B
    § 27-2005 HMC: REFIT TERRACE DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 12C, 12th STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 26, 2024 · #12C · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 26, 2024 · #11R · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 12C, 12th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 25, 2024 · #12C · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WEST AND SOUTH WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 13, 2024 · #11R · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 7Q, 7th STORY, 4th APARTMENT FROM NORTH AT EAST
    Oct 19, 2023 · #7Q · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    May 21, 2023 · #6R · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
    May 21, 2023 · #6R · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 15A, 15th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    May 13, 2023 · #15A · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 9M, 9th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
    Mar 26, 2023 · #9M · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE 1ST DOOR FROM EAST AT NORTH AT PUBLIC HALL, 1st STORY
    Feb 6, 2023 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 12S, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 18, 2022 · #12S · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 12S, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 18, 2022 · #12S · VIOLATION CLOSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Oct 17, 2021 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''south''
    Aug 31, 2021 · #11R · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''south''
    Aug 3, 2021 · #11R · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT SINK IN THE KITCHEN LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WASH BASIN CABINET IN THE BATHROOM LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 14410706 ISSUED 14-JUL-21 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE §27-2017.3a(5)(a) or (b).
    Jul 14, 2021 · #10B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... SOUTH WALL IN THE BATHROOM LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... SOUTH WALL IN THE BATHROOM LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 14410712 ISSUED 14-JUL-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Jul 14, 2021 · #10B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Jul 14, 2021 · #10B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 1, 2021 · #11R · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 11R, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 1, 2021 · #11R · VIOLATION CLOSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    May 9, 2021 · VIOLATION CLOSED
DOB permits (last 30)
  • FBSep 9, 2009
    LEONARD R SIBRIZZI
  • OTNov 19, 2004
    ALTERED STRUCTURE INC
  • OTApr 14, 2004
    PANNICCIA CONTRACTING
  • OTDec 5, 2002
    105 HARBOR ROAD
  • OTApr 23, 1999
    SHELTER DESIGN & CONSTRUCTION
  • FB-
    AGGRESSIVE HEATING INC
  • BL-
    AGGRESSIVE HEATING INC
  • OT-
    SATO CONSTRUCTION CO.INC
  • OT-
    AURORA BUILDERS LLC
  • EQ-
    NEW CENTURY CONSTRUCTION CORP
  • OT-
    SASA RENOVATIONS INC
  • PL-
    WAGNER ZIV PLUMBING
  • AL-
    COW BAY CONTR.
  • PL-
    CATMAN PLUMBING INC
  • OT-
    ELITE INNOVATIVE & DESIGN
  • PL-
    H. BRONNER & SON PLUMBING
  • OT-
    MY HOME LLC
  • PL-
    WARD MECHANICAL CORP
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • OT-
    NEW FORCE CONSTRUCTION CO
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • OT-
    NEW FORCE CONSTRUCTION CO
  • EQ-
    ROCKLEDGE SCAFFOLD
  • EQ-
    ROCKLEDGE SCAFFOLD CORP
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • PL-
    ADVANCED PLUMB ENT
DOB violations
  • Feb 17, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • May 14, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Apr 18, 2017E-ELEVATOR ELEVATORREQUIRED
  • Apr 18, 2017E-ELEVATOR ELEVATORREQUIRED
  • Apr 18, 2017E-ELEVATOR ELEVATORREQUIRED
  • Dec 12, 2016C-CONSTRUCTION OTHER OPTIONAL
  • Apr 4, 2016E-ELEVATOR ELEVATORREQUIRED
  • Apr 4, 2016E-ELEVATOR ELEVATORREQUIRED
  • Apr 4, 2016E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2014E-ELEVATOR ELEVATORREQUIRED
  • Mar 30, 2013C-CONSTRUCTION OTHER OPTIONAL
  • Feb 25, 2013E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jul 21, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jul 26, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 1, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2009E-ELEVATOR ELEVATORREQUIRED
  • Dec 11, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 11, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 11, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2007LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jul 10, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jul 10, 2006E-ELEVATOR ELEVATORREQUIRED

More buildings in Turtle Bay

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1013380005

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record May 5, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
197 permits in the current corpus · latest record Sep 9, 2009

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
136 violations in the current corpus · latest record May 11, 2026

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
91 violations in the current corpus · latest record Feb 17, 2023

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Turtle Bay market page.