CurbScoop
CurbScoopBuildingsFlatiron18 EAST 18 STREET

18 EAST 18 STREET

Manhattan· Flatiron· built 1878class D0BBL 1008460064
Open listing source

18 EAST 18 STREET is a 10-unit building in Flatiron, Manhattan, built in 1878.

1 unit is on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
10
Floors
6.0
Lot ft²
6,057 ft²
Bldg ft²
36,400 ft²
Assessed
$4.40M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
22 EAST 18 STREET #4E
Manhattan · built 1878
Flatiron$3.85M-0 ft²2 bd · 2 ba-106
11 HPD-C19 DOBbedbug
29.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 29, 2026 · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 17, 2025 · INFO NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 4, 2025 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2024 · VIOLATION DISMISSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''22 EAST'', 1st FROM EAST AT SOUTH
    Dec 15, 2023 · #2 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE SECONDARY EGRESS DOOR LEADING TO FIRE STAIRS IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 4th STORY, SECTION ''22 EAST'', 1st FROM EAST AT SOUTH
    Dec 15, 2023 · #4 · NOV SENT OUT
  • A
    § 27-2005 HMC: REFIT SECONDARY EGRESS DOOR LEADING TO FIRE STAIRS IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 4th STORY, SECTION ''22 EAST'', 1st FROM EAST AT SOUTH
    Dec 15, 2023 · #4 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE SECONDARY EGRESS DOOR LEADING TO FIRE STAIRS IN THE 1st ROOM FROM NORTH LOCATED AT APT BLDG, 5th STORY
    Dec 15, 2023 · #BLDG · NOV SENT OUT
  • A
    § 27-2005 HMC: REFIT SECONDARY EGRESS DOOR LEADING TO FIRE STAIRS IN THE 1st ROOM FROM NORTH LOCATED AT APT BLDG, 5th STORY
    Dec 15, 2023 · #BLDG · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''18 EAST'', 3rd FROM EAST AT SOUTH
    Dec 15, 2023 · #4 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 5, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''22 EAST'', 1st FROM EAST AT SOUTH
    Dec 15, 2023 · #5 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''22 EAST'', 1st FROM EAST AT SOUTH
    Dec 15, 2023 · #4 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''18 EAST '', 3rd FROM EAST AT SOUTH
    Nov 27, 2023 · #6A · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR IN THE PUBLIC HALL LOCATED AT PUBLIC PARTS, 1st STORY, SECTION ''22 EAST'', 1st FROM EAST AT SOUTH
    Nov 27, 2023 · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 15, 2023 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 2, 2022 · VIOLATION DISMISSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 13, 2022 · #5W · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR THROUGH-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 13, 2022 · #5W · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 13, 2022 · #5W · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILINGS THROUGH-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 13, 2022 · #5W · NOV SENT OUT
  • C
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILINGS,OUTLETS AND WALL SWITCHES THROUGH-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 13, 2022 · #5W · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 13, 2022 · #5W · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 13, 2022 · #5W · NOV SENT OUT
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 13, 2022 · #5W · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH AND EAST WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ELEVATED WOOD PLATFORM ERECTED IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICEL LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Mar 12, 2021 · NOV CERTIFIED LATE
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER ESCUTCHEON PLATE AT RISER PIPES AT NORTH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER SASH SPRING BALANCE AT 2ND WINDOW FROM EAST AT SOUTH IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 12, 2021 · #5E · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Mar 12, 2021 · NOV CERTIFIED LATE
DOB permits (last 30)
  • OT-
    LIVING SPACE DESIGN LLC
  • PL-
    EMPIRE PLBG INC
  • OT-
    J THOMAS CONSTRUCTION LLC
  • OT-
    J THOMAS CONSTRUCTION LLC
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    C & N CONTRACTING INC
  • PL-
    THE PLBG COMPANY INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    GROUP EIGHT CONSTR INC
  • AL-
    PRO CONCRETE CONTRACTORS CORP
  • OT-
    OOR DESIGN LLC
  • OT-
    OOR DESIGN LLC
  • OT-
    C & N CONTRACTING INC
  • PL-
    LOTUS MECHANICAL
  • OT-
    NONE
  • OT-
    N/A
  • EQ-
    ROCKLEDGE SCAFFOLD
  • OT-
    DK HATCROW REMODELING & RENOVAT.
  • OT-
    J MENDOZA GARDENS INC
  • OT-
    HASHMI GENERAL CONSTR CO
  • PL-
    HYDRO MECH. INC
  • PL-
    AMD & ASSOC. INC.
  • OT-
    H.I. INTERIOR CORP
  • MH-
    H.I. INTERIOR CORP
  • PL-
    Z.W PLBG & HTG CORP
  • PL-
    AMD & ASSOCIATES INC
  • OT-
    PHILRU ENTERTAINMENT CORP
DOB violations
  • Mar 2, 2026C-CONSTRUCTION OTHER OPTIONAL
  • Aug 2, 2024BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2024BENCH-FAILURE TO BENCHMARK NONE
  • Feb 7, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 1, 2023EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 3, 2023BENCH-FAILURE TO BENCHMARK NONE
  • Dec 1, 2022EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Dec 17, 2021EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED
  • Aug 4, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 4, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Aug 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Sep 18, 2018E-ELEVATOR ELEVATORREQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jul 6, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2016E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 10, 2015EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jul 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 24, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jun 15, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 15, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 18, 2009E-ELEVATOR ELEVATORREQUIRED
  • Aug 18, 2009E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2008E-ELEVATOR ELEVATORREQUIRED
  • May 29, 2008E-ELEVATOR ELEVATORREQUIRED
  • Feb 20, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2007E-ELEVATOR ELEVATORREQUIRED

More buildings in Flatiron

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:1008460064

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 18, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
50 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
45 violations in the current corpus · latest record Apr 29, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
64 violations in the current corpus · latest record Mar 20, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Flatiron market page.