CurbScoop
CurbScoopBuildingsFlatiron222 PARK AVENUE SOUTH

222 PARK AVENUE SOUTH

Manhattan· Flatiron· built 1910class D0BBL 1008470038
Open listing source

222 PARK AVENUE SOUTH is a 53-unit building in Flatiron, Manhattan, built in 1910.

2 units are on the market here right now.

City records show 30 DOB permits and 47 open violations on file.

Units (res)
53
Floors
12.0
Lot ft²
8,960 ft²
Bldg ft²
106,841 ft²
Assessed
$15.9M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
222 PARK AVENUE SOUTH #8D
Manhattan · built 1910
Flatiron$2.65M-0 ft²2 bd · 2 ba-144
3 HPD-C15 DOBbedbug
19.1Source
222 PARK AVENUE SOUTH #PH12C
Manhattan · built 1910
Flatiron$2.69M-0 ft²2 bd · 2 ba-76
3 HPD-C15 DOBbedbug
19.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 9, 2018 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 6, 2017 · VIOLATION DISMISSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Oct 9, 2016 · #5D · VIOLATION CLOSED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Feb 2, 2015 · VIOLATION DISMISSED
  • C
    SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING & EAST WALL KITCHEN 7 STY WEST APT 7E ER1. , SECTION '' ''
    Sep 24, 1991 · #7E · NOV SENT OUT
  • C
    SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WALL OVER WINDOW 2 ROOM FROM KITCHEN AT SOTUHEAST 7 STY WEST APT 7E 228 6145 C#109132 KIRCHEN ER1. , SECTION '' ''
    Sep 24, 1991 · #7E · NOV SENT OUT
  • B
    D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE AT ALL STYS REAR FIRE ESCAPE WINDOWS.
    Dec 18, 1986 · NOV SENT OUT
DOB permits (last 30)
  • ALJul 13, 1992
    WEST N.Y RESTORATION INC
  • EQ-
    TRIPLE R INC
  • MH-
    PERFORMANCE MECHANICAL CO
  • PL-
    ALEX FIGLIOLIA CONTRACTING
  • OT-
    TEAMWORK CONTR. RES. CORP
  • MH-
    VANGUARD CONSTRUCTION AND
  • OT-
    VANGUARD CONSTRUCTION AND
  • MH-
    COTTAM HEATING & A/C INC
  • OT-
    COTTAM HEATING & A/C INC
  • PL-
    BEDROCK PLBG. & HTG., INC
  • OT-
    HNL CONSTRUCTION COMPANY
  • PL-
    VILLAGE P & H INC
  • SP-
    VILLAGE P & H INC
  • SD-
    VILLAGE P & H INC
  • OT-
    TEAMWORK CONTRACTING INC
  • OT-
    KANE CONTRACTING
  • PL-
    FLEET PLBG AND HTG INC
  • OT-
    DAVRIAL ENTERPRISES, INC.
  • MH-
    DAVRIAL ENTERPRISES, INC.
  • OT-
    DAVRIAL ENTERPRISES, INC.
  • OT-
    VITELLO PLMB,
  • OT-
    BOLSTER.US,INC
  • SP-
    NEPTUNE MECHANICAL INC
  • OT-
    PHOENIX BLDG RESTORER
  • OT-
    PROFILE CONTRACTING INC
  • OT-
    JAMES KANE CONTRACTING
  • MH-
    JAMES KANE CONTRACTING
  • SP-
    UNIVERSAL FIRE SPRINKLER LLC
  • PL-
    PAUL QUINN PLUMBING/HEATING
  • MH-
    MJV MECHANICAL LTD
DOB violations
  • Dec 1, 2024EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • May 3, 2024BENCH-FAILURE TO BENCHMARK NONE
  • Dec 1, 2023EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 15, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Feb 15, 2023FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Aug 20, 2021E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Oct 14, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 4, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 4, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 16, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 27, 2018EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jul 11, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2016E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 1, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 1, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 30, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Oct 1, 2012EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 3, 2011C-CONSTRUCTION OTHER OPTIONAL
  • Jun 22, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 14, 2009E-ELEVATOR ELEVATORREQUIRED
  • Aug 14, 2009E-ELEVATOR ELEVATORREQUIRED
  • Feb 27, 2009LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL

More buildings in Flatiron

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1008470038

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Apr 17, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 13, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
170 permits in the current corpus · latest record Jul 13, 1992

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
7 violations in the current corpus · latest record Nov 9, 2018

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
79 violations in the current corpus · latest record Jun 16, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Flatiron market page.