CurbScoop
DealsManhattan54 EAST 4 STREET

54 EAST 4 STREET

Manhattan· East Village· built 1878class C7BBL 1004590012
Units (res)
22
Floors
5.0
Lot ft²
2,880 ft²
Bldg ft²
12,045 ft²
Assessed
$2.46M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
52 EAST 4 STREET #4N
Manhattan · built 1878
East Village$1.20M-0 ft²1 bd · 1 ba-117
2 HPD-Cbedbug
9.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT DOOR LEADING TO BASEMENT. AT PUBLIC HALL, 1st STORY
    Dec 22, 2023 · VIOLATION CLOSED
  • C
    SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTRIC MAGNETIC LOCK SET AT BLDG. DOOR FORM STREET TO VESTIBULE
    Nov 28, 2011 · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROVIDE MECHANICAL LOCK SET AT BLDG. DOOR FROM STREET TO VESTIBULE FOR SECURITY THE EVENT OF POWER OUTAGE AT MAGNETIC LOCK
    Nov 28, 2011 · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ELECTICAL EXPOSE WIRES AT WEST WALL AT PUBLIC HALL, 3rd STORY
    Mar 31, 2007 · NOV CERTIFIED LATE
  • B
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE AIR VENT VALVE AT RADIATOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 19, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 11, 2007 · #19 · NOV CERTIFIED LATE
  • A
    SECTION 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT FRONT FIRE ESCAPE ALL STYS.
    Jun 1, 1999 · NOT COMPLIED WITH
  • A
    SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DOOR REMOVED AND OPENING SEALED WITH MASONRY 3 STY PUBLIC HALL EAST CENTER.
    Jun 13, 1997 · NOT COMPLIED WITH
DOB permits (last 30)
  • FSOct 6, 1994
    NUWAY FUEL OIL CO.
  • SP-
    CHIEF FIRE SPRINKLER
  • OT-
    J&E CONSTRUCTION NY CORP.
  • MH-
    J&E CONSTRUCTION NY CORP.
  • PL-
    MAINLAND PLG.&HTG.,INC.
  • PL-
    MANLAND PLG.& HTG.,INC.
  • EQ-
    M.B.R. CONTRACTING INC
  • OT-
    EXCEL CONSTRUCTION & MAGT CORP
  • OT-
    J&E CONSTRUCTION NY CORP.
  • FB-
    NUWAY FUEL OIL CO.
  • FS-
    NUWAY FUEL OIL CO.
  • BL-
    CALRAY GAS HEAT CORP.
  • FB-
    CALRAY GAS HEAT CORP.
  • FS-
    CALRAY GAS HEAT CORP.
  • OT-
    HENG TAI CONSTRUCTION INC
  • OT-
    EXCEL CONSTRUCTION & MAGT CORP
  • BL-
    NUWAY FUEL OIL CO.