CurbScoop
CurbScoop›Buildings›East Village›256 EAST 4 STREET

256 EAST 4 STREET

Manhattan· East Village· built 1900class M1BBL 1003860014

Your first look at this property

A free brief from the records below. Start here, then check the evidence.

Building overview

256 EAST 4 STREET is a building in East Village, Manhattan, built in 1900.

6 units are on the market here right now.

City records show 18 DOB permits and 6 violation records on file.

Units (res)
0
Floors
3.0
Lot ft²
2,382 ft²
Bldg ft²
6,575 ft²
Assessed
$356K
DOF FY2027 final roll
Deeds on this lot · 5 years
Unavailable
Excludes nearby comparable buildings

Official taxes & valuations

$790,000.00 · DOF market valueWhole tax lot · BBL 1003860014

FY2026–27 final assessment roll · Extract 2026-05-15

+2.5% change in DOF market value from the prior year.

Land value
$246,000.00
Building/improvement value
$544,000.00
Actual assessed value
$355,500.00
Assessed land
$110,700.00
Transitional assessed value
$339,120.00
Actual assessed-value exemptions
$0.00
Billable assessment before exemptions
$339,120.00
Billable assessed-value exemptions
$0.00
Taxable assessment after exemptions
$339,120.00
FY2025–26 DOF market value
$771,000.00
Prior-year actual assessed value
$346,950.00
Prior-year taxable assessment
$325,980.00

DOF values are used for property taxation. Condo and co-op tax valuations can differ substantially from sale prices. This is a tax-purpose estimate; comparable sales remain a separate valuation source. Roll exemptions can include STAR under DOF’s published layout.

These values cover the whole tax lot and do not value individual co-op shares.

Official DOF final assessment roll (ZIP) ↗
$36,787.76/yr · $3,065.65/mo equivalentWhole tax lot · BBL 1003860014

FY2026–27 · DOF statement 2026-08-15 · 256 E. 4TH ST.

Billable assessment on this statement
$339,120.00
Tax rate on this statement
10.8480%

DOF tax-purpose market value on this statement: $790,000.00.

This covers the whole tax lot. Co-op building taxes cannot be added to an apartment’s maintenance or divided among its units.

Read official DOF tax bill ↗
How we calculate your annual taxes:
Billable assessed value: $339,120.00
times the current tax rate: x 10.8480%
Annual property tax: $36,787.76

HOA, common charges and maintenance require documented building or unit evidence. Sales and DOB records do not establish these amounts. A zero property-tax bill does not establish zero PILOT or other ownership charges. Bills may change with tax rates or benefits; monthly figures are annual equivalents.

Look up this tax lot at DOF ↗

Public building financial filings

NY Attorney General offering plans and amendments can document budgets, financial statements, reserves and sponsor obligations. These records cover the development, including properties without active listings.

No exact offering-plan match has been collected here yet. Eligible condo and co-op properties are queued when viewed. Missing filings do not establish zero fees, assessments or debt.

Search the official NYAG offering-plan database ↗

Tax-benefit schedules, statement balances, penalties and declared capital work cover the identified tax lot. Condo billing-lot evidence is shown separately from apartment evidence.

DOB ECB penalties & reported balancesTax lot 1003860014

Penalties, energy & capital work

Reported itemValuePeriod & scope
ECB reported balance due · 39554446M
Evidence

{"ecb_violation_number": "39554446M", "issue_date": "20260520", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "AT TIME OF MY INSPECTION DURING WEATHER ADVISORY SWEEP SITE MECHANICAL OPERATING EQUIPMENT ( BOOM LIFT ) WASN'T FULLY ENCLOSED AWAY FROM THE PUBLIC AND WAS NOT SEPARATED FROM THE PUBLIC WALKWAY 3307.4.7 WORK OR", "penality_imposed": "5000", "amount_paid": "0", "balance_due": "5000"}

Separate dated balance; do not add to annual costs

Open official source ↗
$5,000.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39554446M
Evidence

{"ecb_violation_number": "39554446M", "issue_date": "20260520", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "AT TIME OF MY INSPECTION DURING WEATHER ADVISORY SWEEP SITE MECHANICAL OPERATING EQUIPMENT ( BOOM LIFT ) WASN'T FULLY ENCLOSED AWAY FROM THE PUBLIC AND WAS NOT SEPARATED FROM THE PUBLIC WALKWAY 3307.4.7 WORK OR", "penality_imposed": "5000", "amount_paid": "0", "balance_due": "5000"}

Separate dated balance; do not add to annual costs

Open official source ↗
$5,000.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39554446M
Evidence

{"ecb_violation_number": "39554446M", "issue_date": "20260520", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "AT TIME OF MY INSPECTION DURING WEATHER ADVISORY SWEEP SITE MECHANICAL OPERATING EQUIPMENT ( BOOM LIFT ) WASN'T FULLY ENCLOSED AWAY FROM THE PUBLIC AND WAS NOT SEPARATED FROM THE PUBLIC WALKWAY 3307.4.7 WORK OR", "penality_imposed": "5000", "amount_paid": "0", "balance_due": "5000"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39554448X
Evidence

{"ecb_violation_number": "39554448X", "issue_date": "20260520", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "AT THE TIME OF MY INSPECTION DURING WEATHER ADVISORY SWEEP OBSERVED MACHINE OPERATING EQUIPMENT ( BOOM LIFT ) WITHOUT ANY ACTIVE DOT PERMITS. BC 3307.2.1 UPON REVIEW NO PERMITS WAS ACTIVE OR POSTED. FOR PLACEME", "penality_imposed": "625", "amount_paid": "0", "balance_due": "625"}

Separate dated balance; do not add to annual costs

Open official source ↗
$625.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39554448X
Evidence

{"ecb_violation_number": "39554448X", "issue_date": "20260520", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "AT THE TIME OF MY INSPECTION DURING WEATHER ADVISORY SWEEP OBSERVED MACHINE OPERATING EQUIPMENT ( BOOM LIFT ) WITHOUT ANY ACTIVE DOT PERMITS. BC 3307.2.1 UPON REVIEW NO PERMITS WAS ACTIVE OR POSTED. FOR PLACEME", "penality_imposed": "625", "amount_paid": "0", "balance_due": "625"}

Separate dated balance; do not add to annual costs

Open official source ↗
$625.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39554448X
Evidence

{"ecb_violation_number": "39554448X", "issue_date": "20260520", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "AT THE TIME OF MY INSPECTION DURING WEATHER ADVISORY SWEEP OBSERVED MACHINE OPERATING EQUIPMENT ( BOOM LIFT ) WITHOUT ANY ACTIVE DOT PERMITS. BC 3307.2.1 UPON REVIEW NO PERMITS WAS ACTIVE OR POSTED. FOR PLACEME", "penality_imposed": "625", "amount_paid": "0", "balance_due": "625"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39550438Y
Evidence

{"ecb_violation_number": "39550438Y", "issue_date": "20260217", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. AT THE TIME OF INSPECTION OF A 5-STORY NEW BUILDING, A CONSTRUCTION FENCE WAS OBSERVED IN PLACE. REVIEW OF DEPARTMENT RECORDS REVEALED THE CONSTRUCTION F", "penality_imposed": "1280", "amount_paid": "0", "balance_due": "1280"}

Separate dated balance; do not add to annual costs

Open official source ↗
$1,280.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39550438Y
Evidence

{"ecb_violation_number": "39550438Y", "issue_date": "20260217", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. AT THE TIME OF INSPECTION OF A 5-STORY NEW BUILDING, A CONSTRUCTION FENCE WAS OBSERVED IN PLACE. REVIEW OF DEPARTMENT RECORDS REVEALED THE CONSTRUCTION F", "penality_imposed": "1280", "amount_paid": "0", "balance_due": "1280"}

Separate dated balance; do not add to annual costs

Open official source ↗
$1,280.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39550438Y
Evidence

{"ecb_violation_number": "39550438Y", "issue_date": "20260217", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. AT THE TIME OF INSPECTION OF A 5-STORY NEW BUILDING, A CONSTRUCTION FENCE WAS OBSERVED IN PLACE. REVIEW OF DEPARTMENT RECORDS REVEALED THE CONSTRUCTION F", "penality_imposed": "1280", "amount_paid": "0", "balance_due": "1280"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39549302R
Evidence

{"ecb_violation_number": "39549302R", "issue_date": "20260119", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "OBSERVED SUPPORTED SCAFFOLD ERECTED WITH MISSING SECTIONS, INCOMPLETE DECKING, AND ALTERED CONFIGURATION NOT IN ACCORDANCE WITH APPROVED PLANS. AN UNAPPROVED PULLEY/HOISTING SYSTEM WAS INSTALLED ON THE SCAFFOLD", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39549302R
Evidence

{"ecb_violation_number": "39549302R", "issue_date": "20260119", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "OBSERVED SUPPORTED SCAFFOLD ERECTED WITH MISSING SECTIONS, INCOMPLETE DECKING, AND ALTERED CONFIGURATION NOT IN ACCORDANCE WITH APPROVED PLANS. AN UNAPPROVED PULLEY/HOISTING SYSTEM WAS INSTALLED ON THE SCAFFOLD", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39549302R
Evidence

{"ecb_violation_number": "39549302R", "issue_date": "20260119", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "OBSERVED SUPPORTED SCAFFOLD ERECTED WITH MISSING SECTIONS, INCOMPLETE DECKING, AND ALTERED CONFIGURATION NOT IN ACCORDANCE WITH APPROVED PLANS. AN UNAPPROVED PULLEY/HOISTING SYSTEM WAS INSTALLED ON THE SCAFFOLD", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39549303Z
Evidence

{"ecb_violation_number": "39549303Z", "issue_date": "20260119", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "ICY CONDITIONS OBSERVED ACTIVE SCAFFOLD PLATFORMS& ACCESS AREAS COVERED WITH SNOW& ICE.&ROOF LEVEL DUE TO INADEQUATE HOUSEKEEPING &FAILURE TO REMOVE HAZARDOUS ACCUMULATIONS. CONDITIONS CREATE SLIP HAZARDS & UNS", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39549303Z
Evidence

{"ecb_violation_number": "39549303Z", "issue_date": "20260119", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "ICY CONDITIONS OBSERVED ACTIVE SCAFFOLD PLATFORMS& ACCESS AREAS COVERED WITH SNOW& ICE.&ROOF LEVEL DUE TO INADEQUATE HOUSEKEEPING &FAILURE TO REMOVE HAZARDOUS ACCUMULATIONS. CONDITIONS CREATE SLIP HAZARDS & UNS", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39549303Z
Evidence

{"ecb_violation_number": "39549303Z", "issue_date": "20260119", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "ICY CONDITIONS OBSERVED ACTIVE SCAFFOLD PLATFORMS& ACCESS AREAS COVERED WITH SNOW& ICE.&ROOF LEVEL DUE TO INADEQUATE HOUSEKEEPING &FAILURE TO REMOVE HAZARDOUS ACCUMULATIONS. CONDITIONS CREATE SLIP HAZARDS & UNS", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 35718008P
Evidence

{"ecb_violation_number": "35718008P", "issue_date": "20251201", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE, 6 STORY ALTERATION BUILDING STRUCTURAL COMPLETED TO BULKHEAD. OBSERVED AT", "penality_imposed": "3125", "amount_paid": "0", "balance_due": "3125"}

Separate dated balance; do not add to annual costs

Open official source ↗
$3,125.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 35718008P
Evidence

{"ecb_violation_number": "35718008P", "issue_date": "20251201", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE, 6 STORY ALTERATION BUILDING STRUCTURAL COMPLETED TO BULKHEAD. OBSERVED AT", "penality_imposed": "3125", "amount_paid": "0", "balance_due": "3125"}

Separate dated balance; do not add to annual costs

Open official source ↗
$3,125.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 35718008P
Evidence

{"ecb_violation_number": "35718008P", "issue_date": "20251201", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE, 6 STORY ALTERATION BUILDING STRUCTURAL COMPLETED TO BULKHEAD. OBSERVED AT", "penality_imposed": "3125", "amount_paid": "0", "balance_due": "3125"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39543539H
Evidence

{"ecb_violation_number": "39543539H", "issue_date": "20250811", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "ALTERATION OF A 6 STORY BUILDING. OBSERVED ACTIVE CONSTRUCTION SITE WITH SUPPORTED SCAFFOLD @ EXP#1&2 WITH MAKESHIFT WALKING PLATFORM CONNECTION @ THE CORNER OF EXP#1&2 ON MULTIPLE LEVELS. UPON REVIEWING THE AP", "penality_imposed": "3125", "amount_paid": "0", "balance_due": "3125"}

Separate dated balance; do not add to annual costs

Open official source ↗
$3,125.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39543539H
Evidence

{"ecb_violation_number": "39543539H", "issue_date": "20250811", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "ALTERATION OF A 6 STORY BUILDING. OBSERVED ACTIVE CONSTRUCTION SITE WITH SUPPORTED SCAFFOLD @ EXP#1&2 WITH MAKESHIFT WALKING PLATFORM CONNECTION @ THE CORNER OF EXP#1&2 ON MULTIPLE LEVELS. UPON REVIEWING THE AP", "penality_imposed": "3125", "amount_paid": "0", "balance_due": "3125"}

Separate dated balance; do not add to annual costs

Open official source ↗
$3,125.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39543539H
Evidence

{"ecb_violation_number": "39543539H", "issue_date": "20250811", "ecb_violation_status": "RESOLVE", "hearing_status": null, "violation_description": "ALTERATION OF A 6 STORY BUILDING. OBSERVED ACTIVE CONSTRUCTION SITE WITH SUPPORTED SCAFFOLD @ EXP#1&2 WITH MAKESHIFT WALKING PLATFORM CONNECTION @ THE CORNER OF EXP#1&2 ON MULTIPLE LEVELS. UPON REVIEWING THE AP", "penality_imposed": "3125", "amount_paid": "0", "balance_due": "3125"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39541602M
Evidence

{"ecb_violation_number": "39541602M", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED A DEBRIS CHUTE IN PLACE ATTACHED TO THE SUPPORTED PIPE SCAFFOLD UPON REQUEST FOR DESIGN DRAWING AND PERMIT NONE WAS PRO", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39541602M
Evidence

{"ecb_violation_number": "39541602M", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED A DEBRIS CHUTE IN PLACE ATTACHED TO THE SUPPORTED PIPE SCAFFOLD UPON REQUEST FOR DESIGN DRAWING AND PERMIT NONE WAS PRO", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39541602M
Evidence

{"ecb_violation_number": "39541602M", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED A DEBRIS CHUTE IN PLACE ATTACHED TO THE SUPPORTED PIPE SCAFFOLD UPON REQUEST FOR DESIGN DRAWING AND PERMIT NONE WAS PRO", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39541617P
Evidence

{"ecb_violation_number": "39541617P", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED CONSTRUCTION MATERIALS AND DEBRIS STORED 10 FEET WITHIN AN UNENCLOSED PERIMETERS CONTRARY TO CODE 3303.4.4.2. THIS COND", "penality_imposed": "5000", "amount_paid": "0", "balance_due": "5000"}

Separate dated balance; do not add to annual costs

Open official source ↗
$5,000.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39541617P
Evidence

{"ecb_violation_number": "39541617P", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED CONSTRUCTION MATERIALS AND DEBRIS STORED 10 FEET WITHIN AN UNENCLOSED PERIMETERS CONTRARY TO CODE 3303.4.4.2. THIS COND", "penality_imposed": "5000", "amount_paid": "0", "balance_due": "5000"}

Separate dated balance; do not add to annual costs

Open official source ↗
$5,000.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39541617P
Evidence

{"ecb_violation_number": "39541617P", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED CONSTRUCTION MATERIALS AND DEBRIS STORED 10 FEET WITHIN AN UNENCLOSED PERIMETERS CONTRARY TO CODE 3303.4.4.2. THIS COND", "penality_imposed": "5000", "amount_paid": "0", "balance_due": "5000"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39541618R
Evidence

{"ecb_violation_number": "39541618R", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED CONSTRUCTION MATERIALS AND DEBRIS SCATTERED THROUGHOUT 3RD, 4TH FLOOR, AND ROOF LEVEL. THE CONDITION POSES A POTENTIAL", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39541618R
Evidence

{"ecb_violation_number": "39541618R", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED CONSTRUCTION MATERIALS AND DEBRIS SCATTERED THROUGHOUT 3RD, 4TH FLOOR, AND ROOF LEVEL. THE CONDITION POSES A POTENTIAL", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39541618R
Evidence

{"ecb_violation_number": "39541618R", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED CONSTRUCTION MATERIALS AND DEBRIS SCATTERED THROUGHOUT 3RD, 4TH FLOOR, AND ROOF LEVEL. THE CONDITION POSES A POTENTIAL", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39541619Z
Evidence

{"ecb_violation_number": "39541619Z", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED A GAS CAN INADEQUATELY BEING STORED CREATING A POTENTIAL FIRE HAZARD. PROVIDE AND MAINTAIN ADEQUATE STORAGE.", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39541619Z
Evidence

{"ecb_violation_number": "39541619Z", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED A GAS CAN INADEQUATELY BEING STORED CREATING A POTENTIAL FIRE HAZARD. PROVIDE AND MAINTAIN ADEQUATE STORAGE.", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$2,500.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39541619Z
Evidence

{"ecb_violation_number": "39541619Z", "issue_date": "20250620", "ecb_violation_status": "RESOLVE", "hearing_status": "IN VIOLATION", "violation_description": "NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED A GAS CAN INADEQUATELY BEING STORED CREATING A POTENTIAL FIRE HAZARD. PROVIDE AND MAINTAIN ADEQUATE STORAGE.", "penality_imposed": "2500", "amount_paid": "0", "balance_due": "2500"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot
ECB reported balance due · 39138007H
Evidence

{"ecb_violation_number": "39138007H", "issue_date": "20250210", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "FSWO ISSUED FOR WORK WITH OUT PERMIT. ATOI OBSERVED MAJOR DEMOLITION OF ALL 3 FLOORS. THE REMOVAL OF FIRE RATING DRYWALL PARTITION WALLS AND ELECTRICAL WIRING .NO DEMOLITION PERMIT ON FILE WITH THE DEPARTMENT.,", "penality_imposed": "5030", "amount_paid": "0", "balance_due": "5030"}

Separate dated balance; do not add to annual costs

Open official source ↗
$5,030.00As of 2026-10-12
Source reported · exact tax lot
ECB penalty imposed · 39138007H
Evidence

{"ecb_violation_number": "39138007H", "issue_date": "20250210", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "FSWO ISSUED FOR WORK WITH OUT PERMIT. ATOI OBSERVED MAJOR DEMOLITION OF ALL 3 FLOORS. THE REMOVAL OF FIRE RATING DRYWALL PARTITION WALLS AND ELECTRICAL WIRING .NO DEMOLITION PERMIT ON FILE WITH THE DEPARTMENT.,", "penality_imposed": "5030", "amount_paid": "0", "balance_due": "5030"}

Separate dated balance; do not add to annual costs

Open official source ↗
$5,030.00As of 2026-10-12
Source reported · exact tax lot
ECB amount paid · 39138007H
Evidence

{"ecb_violation_number": "39138007H", "issue_date": "20250210", "ecb_violation_status": "RESOLVE", "hearing_status": "DEFAULT", "violation_description": "FSWO ISSUED FOR WORK WITH OUT PERMIT. ATOI OBSERVED MAJOR DEMOLITION OF ALL 3 FLOORS. THE REMOVAL OF FIRE RATING DRYWALL PARTITION WALLS AND ELECTRICAL WIRING .NO DEMOLITION PERMIT ON FILE WITH THE DEPARTMENT.,", "penality_imposed": "5030", "amount_paid": "0", "balance_due": "5030"}

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-10-12
Source reported · exact tax lot

Balances retain the source’s reported status and observation date. An imposed penalty is not an additional amount to add to its balance due.

Source updated 2026-10-11 · collected 2026-10-12.

Open official source ↗
DOF benefit schedulesTax lot 1003860014

No supported financial amounts were returned in this source snapshot. This does not establish zero costs, no benefit, no debt or no penalties.

Published benefit amounts and dates do not guarantee eligibility after a purchase. An end date alone does not establish the future tax bill; assessment, tax rate and other benefits may change.

Source publication date not provided · collected 2026-10-12.

Open official source ↗
DOF final assessed-value exemptionsTax lot 1003860014

Tax benefits & expiration

Reported itemValuePeriod & scope
EMMANUEL SPNSH BAPT C · Final actual exempt assessed value
Evidence

{"benftstart": "+1984", "bldg_class": "M1", "block": "386", "boro": "1", "exmp_code": "1021", "exmp_code_suffix": "10211", "exmp_seq": "5", "exname": "EMMANUEL SPNSH BAPT C", "extractdt": "20260515", "finexmptot": "0", "finexmptrn": "0", "finexmptxbl": "0", "fintaxclass": "4", "lot": "14", "no_years": "43", "nys_exmp_code": "25116", "parid": "1003860014", "period": "3", "rectype": "1", "year": "2027"}

Tax benefit; do not add as a cost

Open official source ↗
$0.00As of 2026-05-15
FY2027 final roll
Source reported · exact tax lot
EMMANUEL SPNSH BAPT C · Final exempt assessed value used for billing
Evidence

{"benftstart": "+1984", "bldg_class": "M1", "block": "386", "boro": "1", "exmp_code": "1021", "exmp_code_suffix": "10211", "exmp_seq": "5", "exname": "EMMANUEL SPNSH BAPT C", "extractdt": "20260515", "finexmptot": "0", "finexmptrn": "0", "finexmptxbl": "0", "fintaxclass": "4", "lot": "14", "no_years": "43", "nys_exmp_code": "25116", "parid": "1003860014", "period": "3", "rectype": "1", "year": "2027"}

Tax benefit; do not add as a cost

Open official source ↗
$0.00As of 2026-05-15
FY2027 final roll
Source reported · exact tax lot

Final exemption values reduce assessed value; they are not cash savings or annual taxes. No expiration date inferred from a start year or duration.

Published benefit amounts and dates do not guarantee eligibility after a purchase. An end date alone does not establish the future tax bill; assessment, tax rate and other benefits may change.

Source updated 2026-09-15 · collected 2026-10-09.

Open official source ↗
DOF statement balancesTax lot 1003860014

Public balances & charges

Reported itemValuePeriod & scope
Outstanding charges
Evidence

Outstanding charges $19,051.30

Separate dated balance; do not add to annual costs

Open official source ↗
$19,051.30As of 2026-08-15
Source reported · exact tax lot
New charges this billing period
Evidence

New charges $0.00

Separate dated balance; do not add to annual costs

Open official source ↗
$0.00As of 2026-08-15
Source reported · exact tax lot
Statement amount due
Evidence

Amount Due 10/01/26: $19,051.30

Separate dated balance; do not add to annual costs

Due date: 2026-10-01

Open official source ↗
$19,051.30As of 2026-08-15
Source reported · exact tax lot

Source updated 2026-08-15 · collected 2026-10-12.

Open official source ↗
DOB energy disclosureTax lot 1003860014

No supported financial amounts were returned in this source snapshot. This does not establish zero costs, no benefit, no debt or no penalties.

Reported energy figures may cover several buildings or lots. They are not verified LL97 emissions, a penalty calculation, or this apartment’s utility bill.

Source updated 2025-11-25 · collected 2026-10-12.

Open official source ↗
DOB declared construction workTax lot 1003860014

Penalties, energy & capital work

Reported itemValuePeriod & scope
Declared construction estimate · M01197411-I1-SH#1
Evidence

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

Estimate; not an apartment assessment

Open official source ↗
$9,000.00As of 2025-03-27
Declared estimate · exact tax lot
Declared construction estimate · M01197428-I1-SF#1
Evidence

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

Estimate; not an apartment assessment

Open official source ↗
$5,000.00As of 2025-03-27
Declared estimate · exact tax lot
Declared construction estimate · M01191370-I1-ST#1
Evidence

PARTIAL DEMOLITION OF 3 STORY BRICK AND FRAME BUILDING WITH CELLAR AS PER PLAN, FOR NEW CONSTRUCTION FILING UNDER ALT-CO # M01011084.

Estimate; not an apartment assessment

Open official source ↗
$80,000.00As of 2025-03-20
Declared estimate · exact tax lot
Declared construction estimate · M01169706-I1-FN#1
Evidence

PROPOSED INSTALLATION OF A TEMPORARY CONSTRUCTION WOOD FENCE AS PER PLAN IN CONJUNCTION WITH NB # M01011084-I1.

Estimate; not an apartment assessment

Open official source ↗
$1,000.00As of 2025-01-31
Declared estimate · exact tax lot
Declared construction estimate · M01011084-S1-FO#1
Evidence

Foundation work to be conducted to install reinforced concrete foundation wall, footing, and slab on grade as per plan, filed in conjunction with Alt-CO GC # M01011084-I1.

Estimate; not an apartment assessment

Open official source ↗
$100,000.00As of 2025-01-13
Declared estimate · exact tax lot
Declared construction estimate · M01011084-S3-SE#1
Evidence

SOE work to be conducted to perform sloped excavation, filed in conjunction with GC # M01011084.

Estimate; not an apartment assessment

Open official source ↗
$100,000.00As of 2025-01-09
Declared estimate · exact tax lot
Declared construction estimate · M01011084-S5-MS#1
Evidence

PROPOSED MECHCHANICAL (HVAC, BATHROOM AND KITCHEN EXHAUST AND FAI) WORK AS PER PLAN, FILED IN CONJUNCTION WITH ALT-CO GC # M01011084-I1.

Estimate; not an apartment assessment

Open official source ↗
$180,000.00As of 2025-01-09
Declared estimate · exact tax lot
Declared construction estimate · M01011084-S4-ST#1
Evidence

Structural work to be conducted to install cfs joist, cfs stud walls, steel beams, steel posts, concrete slab on metal deck, concrete slab on grade and masonry walls, filed in conjunction with GC # M01011084.

Estimate; not an apartment assessment

Open official source ↗
$300,000.00As of 2025-01-07
Declared estimate · exact tax lot
Declared construction estimate · M01011084-S6-PL#1
Evidence

Proposed installation of storm drainage, water service and plumbing fixtures as per plan, filed in conjunction with Alt-CO GC# M01011084-I1.

Estimate; not an apartment assessment

Open official source ↗
$300,000.00As of 2025-01-07
Declared estimate · exact tax lot
Declared construction estimate · M01011084-S7-EW-SP#1
Evidence

NEW INSTALLATION OF SPRINKLER SYSTEM AS PER PLAN FILED IN CONJUNCTION WITH GC # M01011084-I1.

Estimate; not an apartment assessment

Open official source ↗
$133,500.00As of 2025-01-07
Declared estimate · exact tax lot
Declared construction estimate · M01011084-I1-GC#1
Evidence

Proposed to convert the existing house of worship (UG 4) to residential apartment building (UG 2). The works include general construction with new vertical enlargement for a total of 6-story building under 2022 NYC Code . Obtain a new C of O.

Estimate; not an apartment assessment

Open official source ↗
$3,026,123.00As of 2025-01-06
Declared estimate · exact tax lot

Up to 30 most recent distinct filings from the past five years; this is not a complete capital-work inventory.

Declared job estimates are not actual spending or approved assessments. Repeated permit rows for the same filing are counted once; separate job filings may still describe related work.

Source publication date not provided.

Open official source ↗
Model annual LL97 emissions exposure

Enter verified LL97 emissions and the applicable annual limit. LL84 location-based emissions above are a different reported metric and are not automatically used here.

Enter both assumptions to calculate exposure.

Before exemptions, adjustments, offsets or penalty mitigation. This scenario does not establish an issued fine or an apartment charge.

Official DOB penalty guidance ↗

Active sale listings (6)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
256 EAST 4 STREET #5
Manhattan · built 1900
East Village$2.80M$1,9141,463 ft²3 bd · 2 ba-4
2 DOB
1.2Source
256 EAST 4 STREET #PENTHOUSE
Manhattan · built 1900
East Village$5.50M$2,1112,605 ft²3 bd · 2 ba-10
2 DOB
1.2Source
256 EAST 4 STREET #2
Manhattan · built 1900
East Village$1.20M$1,776673 ft²1 bd · 1 ba-30
2 DOB
1.2Source
256 EAST 4 STREET #4
Manhattan · built 1900
East Village$1.23M$1,820673 ft²1 bd · 1 ba-4
2 DOB
1.2Source
256 EAST 4 STREET #GARDEN
Manhattan · built 1900
East Village$3.35M$1,8481,813 ft²3 bd · 3 ba-82
2 DOB
1.2Source
256 EAST 4 STREET #3
Manhattan · built 1900
East Village$1.29M$1,781727 ft²1 bd · 1 ba-55
2 DOB
1.2Source

Building activity

Open a record to read the full agency text.

Housing violations (HPD) 0

No records returned.

Work permits (DOB) 18

Sidewalk ShedMar 27, 2025Signed-off

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

NEW AMERICAN CONSTRUCTION

Issued Apr 1, 2025

DOB filing M01197411-I1-SH#1
Supported ScaffoldMar 27, 2025Signed-off

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

NEW AMERICAN CONSTRUCTION

Issued Apr 15, 2025

DOB filing M01197428-I1-SF#1
StructuralMar 20, 2025Signed-off

PARTIAL DEMOLITION OF 3 STORY BRICK AND FRAME BUILDING WITH CELLAR AS PER PLAN, FOR NEW CONSTRUCTION FILING UNDER ALT-CO # M01011084.

H BUILDING MANAGEMENT INC

Issued Jul 22, 2026

DOB filing M01191370-I1-ST#1
Show 15 more records
Construction FenceJan 31, 2025Permit issued

PROPOSED INSTALLATION OF A TEMPORARY CONSTRUCTION WOOD FENCE AS PER PLAN IN CONJUNCTION WITH NB # M01011084-I1.

H BUILDING MANAGEMENT INC

Issued Mar 9, 2026

DOB filing M01169706-I1-FN#2
Construction FenceJan 31, 2025Permit issued

PROPOSED INSTALLATION OF A TEMPORARY CONSTRUCTION WOOD FENCE AS PER PLAN IN CONJUNCTION WITH NB # M01011084-I1.

H BUILDING MANAGEMENT INC

Issued Feb 3, 2025

DOB filing M01169706-I1-FN#1
FoundationJan 13, 2025Signed-off

Foundation work to be conducted to install reinforced concrete foundation wall, footing, and slab on grade as per plan, filed in conjunction with Alt-CO GC # M01011084-I1.

H BUILDING MANAGEMENT INC

Issued Mar 3, 2025

DOB filing M01011084-S1-FO#1
FoundationJan 13, 2025Signed-off

Foundation work to be conducted to install reinforced concrete foundation wall, footing, and slab on grade as per plan, filed in conjunction with Alt-CO GC # M01011084-I1.

H BUILDING MANAGEMENT INC

Issued Feb 17, 2026

DOB filing M01011084-S1-FO#2
Support of ExcavationJan 9, 2025Signed-off

SOE work to be conducted to perform sloped excavation, filed in conjunction with GC # M01011084.

H BUILDING MANAGEMENT INC

Issued Mar 3, 2025

DOB filing M01011084-S3-SE#1
Support of ExcavationJan 9, 2025Signed-off

SOE work to be conducted to perform sloped excavation, filed in conjunction with GC # M01011084.

H BUILDING MANAGEMENT INC

Issued Feb 17, 2026

DOB filing M01011084-S3-SE#2
Mechanical SystemsJan 9, 2025Signed-off

PROPOSED MECHCHANICAL (HVAC, BATHROOM AND KITCHEN EXHAUST AND FAI) WORK AS PER PLAN, FILED IN CONJUNCTION WITH ALT-CO GC # M01011084-I1.

H BUILDING MANAGEMENT INC

Issued Sep 8, 2025

DOB filing M01011084-S5-MS#1
SprinklersJan 7, 2025Permit issued

NEW INSTALLATION OF SPRINKLER SYSTEM AS PER PLAN FILED IN CONJUNCTION WITH GC # M01011084-I1.

RRP PLUMBING CORP

Issued Mar 4, 2025

DOB filing M01011084-S7-EW-SP#1
PlumbingJan 7, 2025Signed-off

Proposed installation of storm drainage, water service and plumbing fixtures as per plan, filed in conjunction with Alt-CO GC# M01011084-I1.

RRP PLUMBING CORP

Issued Mar 4, 2025

DOB filing M01011084-S6-PL#1
PlumbingJan 7, 2025Signed-off

Proposed installation of storm drainage, water service and plumbing fixtures as per plan, filed in conjunction with Alt-CO GC# M01011084-I1.

RRP PLUMBING CORP

Issued Apr 8, 2026

DOB filing M01011084-S6-PL#2
SprinklersJan 7, 2025Permit issued

NEW INSTALLATION OF SPRINKLER SYSTEM AS PER PLAN FILED IN CONJUNCTION WITH GC # M01011084-I1.

RRP PLUMBING CORP

Issued May 26, 2026

DOB filing M01011084-S7-EW-SP#2
StructuralJan 7, 2025Signed-off

Structural work to be conducted to install cfs joist, cfs stud walls, steel beams, steel posts, concrete slab on metal deck, concrete slab on grade and masonry walls, filed in conjunction with GC # M01011084.

H BUILDING MANAGEMENT INC

Issued Feb 17, 2026

DOB filing M01011084-S4-ST#2
StructuralJan 7, 2025Signed-off

Structural work to be conducted to install cfs joist, cfs stud walls, steel beams, steel posts, concrete slab on metal deck, concrete slab on grade and masonry walls, filed in conjunction with GC # M01011084.

H BUILDING MANAGEMENT INC

Issued Jan 31, 2025

DOB filing M01011084-S4-ST#1
General ConstructionJan 6, 2025Permit issued

Proposed to convert the existing house of worship (UG 4) to residential apartment building (UG 2). The works include general construction with new vertical enlargement for a total of 6-story building under 2022 NYC Code . Obtain a new C of O.

H BUILDING MANAGEMENT INC

Issued Aug 26, 2025

DOB filing M01011084-I1-GC#2
General ConstructionJan 6, 2025Permit issued

Proposed to convert the existing house of worship (UG 4) to residential apartment building (UG 2). The works include general construction with new vertical enlargement for a total of 6-story building under 2022 NYC Code . Obtain a new C of O.

H BUILDING MANAGEMENT INC

Issued Mar 3, 2025

DOB filing M01011084-I1-GC#1

Building violations (DOB) 6

LBLVIO-LOW PRESSURE BOILER BOILER REQUIREDMar 1, 2013Disposition recorded Nov 26, 2024

VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT

DOB record 1736465
LBLVIO-LOW PRESSURE BOILER BOILER REQUIREDDec 31, 2009No disposition date supplied

Agency description not supplied.

DOB record 1466383
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIREDJan 1, 2009No disposition date supplied

Agency description not supplied.

DOB record 1388664
Show 3 more records
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIREDJan 3, 2008Disposition recorded Nov 26, 2024

Agency description not supplied.

DOB record 1287352
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIREDJan 19, 2007Disposition recorded Nov 26, 2024

Agency description not supplied.

DOB record 1185764
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIREDFeb 13, 2004Disposition recorded Nov 26, 2024

Agency description not supplied.

DOB record 955295
Transaction history · 0 deeds

Recorded consideration. A $0 deed is not a sale price.

No recorded transactions for this BBL yet.

More buildings in East Village

Sources, coverage & freshness

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 24, 2026

Stable property ID: nyc:bbl:1003860014

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 18, 2026

Pipeline completed Oct 18, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
6 active sale listings in the current corpus · latest record Jul 23, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
18 permits in the current corpus · latest record Jul 22, 2026

Pipeline completed Oct 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Oct 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
6 violations in the current corpus · latest record Nov 26, 2024

Pipeline completed Oct 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

How to read these records

Deed amounts are recorded consideration, not asking prices or a unit valuation. A blank record is not proof that an issue does not exist.