CurbScoop
CurbScoopBuildingsEast Village111 4 AVENUE

111 4 AVENUE

Manhattan· East Village· built 1921class D4BBL 1005560044
Open listing source

111 4 AVENUE is a 172-unit building in East Village, Manhattan, built in 1921.

2 units are on the market here right now.

City records show 30 DOB permits and 41 open violations on file.

Units (res)
172
Floors
13.0
Lot ft²
17,567 ft²
Bldg ft²
156,650 ft²
Assessed
$20.8M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
111 4 AVENUE #3I
Manhattan · built 1921
East Village$1.45M-0 ft²2 bd · 1 ba-170
19 DOBbedbug
16.2Source
111 4 AVENUE #8M
Manhattan · built 1921
East Village$2.19M-0 ft²2 bd · 2 ba-35
19 DOBbedbug
16.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2021 · VIOLATION DISMISSED
DOB permits (last 30)
  • PLSep 28, 2017
    NEW YORK PLUMBING WORKS I
  • OTApr 14, 2006
    VENEZIA INTERIORS CORP
  • OTFeb 7, 2006
    RICH DESIGN & CONSTRUCTION
  • PLSep 15, 2000
    FRED SMITH PLUMBING
  • EQOct 4, 1993
    ROCKLEDGE SCAFFOLFDING CORP.
  • OT-
    N.E. GENERAL CONSTRUCTION
  • PL-
    AVON PLBG & HTG INC
  • MH-
    UNIVERSAL CRAFTS INC
  • PL-
    GALICJA PLBG AND HTG.CORP
  • MH-
    DURR MECHNICAL CONSTRUCTION
  • MH-
    REIDMAN ASSOCIATES INC
  • OT-
    REIDMAN ASSOCIATES INC
  • PL-
    DOLE PLUMBING AND HEATING CO.
  • OT-
    VENEZIA INTERIORS CORP
  • MH-
    UNIVERSAL CRAFTS INC
  • OT-
    PAWEL TRASKOWSKI
  • EQ-
    EVEREST SCAFFOLDING INC.
  • OT-
    DURR MECHNICAL CONSTRUCTION
  • MH-
    PAWEL TRASKOWSKI
  • OT-
    RMS HOME IMPROVEMENT INC
  • PL-
    TESTERMAN MECHANICAL INC
  • OT-
    2K-CONSTRUCTION CORP
  • OT-
    2K-CONSTRUCTION CORP
  • OT-
    ARDUINI CONTRACTING CORP
  • MH-
    ARDUINI CONTRACTING CORP
  • OT-
    HIS NY2 INC
  • MH-
    HIS NY2 INC
  • OT-
    ODIN CONSTRUCTION MANAGEM
  • PL-
    WF PLUMBING AND HEATING L
  • PL-
    KAPNAG HTG & PLG CORP
DOB violations
  • Mar 6, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Mar 6, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Jul 21, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2021C-CONSTRUCTION OTHER OPTIONAL
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 10, 2021C-CONSTRUCTION OTHER OPTIONAL
  • Oct 28, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 28, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 17, 2020FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Aug 4, 2020C-CONSTRUCTION OTHER OPTIONAL
  • Aug 4, 2020C-CONSTRUCTION OTHER OPTIONAL
  • Jun 29, 2020EARCX-FAILURE TO SUBMIT EER NONE
  • May 28, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 28, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jan 8, 2018P-PLUMBING NONE
  • Jun 14, 2017E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 10, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 10, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 10, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 13, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 13, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 13, 2012E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Nov 5, 2008E-ELEVATOR ELEVATORREQUIRED
  • Nov 5, 2008E-ELEVATOR ELEVATORREQUIRED
  • Nov 5, 2008E-ELEVATOR ELEVATORREQUIRED
  • Nov 13, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 13, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 13, 2007E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2006E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2006E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2005E-ELEVATOR ELEVATORREQUIRED

More buildings in East Village

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1005560044

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record May 1, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
243 permits in the current corpus · latest record Sep 28, 2017

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
1 violation in the current corpus · latest record Dec 6, 2021

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
53 violations in the current corpus · latest record Mar 6, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the East Village market page.