CurbScoop
DealsManhattanFulton/Seaport

333 PEARL STREET · #5L

Fulton/Seaport· built 1971openSales listingBBL 1000940001
$825,000
- / ft² · 2 bd · 1 ba · 0 ft²
score 110.0 · rich
Price
$825K
$/ft²
-
Days on market
236
Monthly taxes
-
Common charges
-
Maintenance
$1,042

Description

One of the best true two-bedroom values in all of Downtown! This bright and spacious home offers a wealth of desirable features: a large living area, oversized private balcony, sizable ventilated kitchen (with the option to open it completely to the living room), open and sunny North/Southeast exposures, abundant closet space, and generous bedroom sizes — the primary easily accommodates a king-sized bedroom set. Enjoy an unbeatable price per square foot with extraordinarily low maintenance including electricity. A parking garage is also available, with discounted spots reserved for shareholders (only $375/month). Southbridge Towers is one of Downtown’s most sought-after co-ops, celebrated for its spacious layouts, very competitive pricing, and remarkably low maintenance (all utilities included). The building also offers auxiliary storage spaces. Located in the heart of FiDi, Southbridge is steps from the lively nightlife and restaurants of the Seaport and Tribeca, and close to nearly every major subway line: A, C, E, 4, 5, 6, 1, 2, 3, R, W, J, and Z. All lobbies, elevators, and hallways are currently being renovated, further enhancing the appeal and long-term value of this exceptional cooperative.

Price history

Every list / cut / contract / sold event we've recorded.

  1. price decreaseNov 24, 2025
    $825K-2.9%
    Price decreased 3%
  2. listedOct 8, 2025
    $850K
    Listed by Brown Harris Stevens

In-building transactions

Every recorded deed (incl. private + sponsor) for this BBL - actual prices paid.

full building →
No transactions recorded for this BBL yet.

Open violations + recent permits

DOB / HPD signals for this BBL.

Open HPD violations (15)
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH AND SOURH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 10, 2026 · apt 6L
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 10, 2026 · apt 6L
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 10, 2026 · apt 6L
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 10, 2026 · apt 6L
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Jun 30, 2026 · apt 22J
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 22J, 22nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Jun 30, 2026 · apt 22J
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 27K, 27th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Mar 18, 2026 · apt 27K
  • B
    § 27-2005 HMC: REFIT APARTMENT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 22J, 22nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 10, 2026 · apt 22J
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 10, 2026 · apt 22J
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 22J, 22nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 10, 2026 · apt 22J
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT DOOR IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 10, 2026 · apt 22J
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 22J, 22nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 10, 2026 · apt 22J
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE KITCHEN LOCATED AT APT 22J, 22nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 10, 2026 · apt 22J
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 22J, 22nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 10, 2026 · apt 22J
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RADIATOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 14, 2025 · apt 11C
Recent DOB permits (12)
  • OTDec 28, 2018
    GOLIATH WOODWORKING LLC
  • PLNov 18, 2016
    MEJ PLUMBING LLC
  • MHAug 5, 2014
    TRIMOND CONSTRUCTION INC
  • FPAug 9, 2005
    CHIEF FIRE PREV. MECH. CORP
  • OTJul 6, 2005
    DME CONSTRUCTION ASSOC.
  • EQOct 18, 2004
    PROTO CONSTR.
  • MHNov 18, 2002
    CONTI COMMUNICATION INC
  • EQNov 17, 1997
    COLGATE SCAFFOLDING