CurbScoop
CurbScoopBuildingsBrighton Beach3100 BRIGHTON 3 STREET

3100 BRIGHTON 3 STREET

Brooklyn· Brighton Beach· built 1920class D4BBL 3086850010

3100 BRIGHTON 3 STREET is a 65-unit building in Brighton Beach, Brooklyn, built in 1920.

4 units are on the market here right now.

City records show 22 DOB permits and 56 open violations on file.

Units (res)
65
Floors
6.0
Lot ft²
14,000 ft²
Bldg ft²
59,640 ft²
Assessed
$3.23M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
3100 BRIGHTON 3 STREET #6D
Brooklyn · built 1920
Brighton Beach$549K$4581,200 ft²2 bd · 1 ba-4
54 HPD-C1 DOBbedbug
88.5Source
3100 BRIGHTON 3 STREET #2K
Brooklyn · built 1920
Brighton Beach$329K$387850 ft²1 bd · 1 ba-307
54 HPD-C1 DOBbedbug
88.5Source
3100 BRIGHTON 3 STREET #4F
Brooklyn · built 1920
Brighton Beach$329K$3291,000 ft²1 bd · 1 ba-79
54 HPD-C1 DOBbedbug
88.5Source
3100 BRIGHTON 3 STREET #6F
Brooklyn · built 1920
Brighton Beach$219K$274800 ft²1 bd · 1 ba-104
54 HPD-C1 DOBbedbug
88.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS AT BUILDING ENTRANCE DOOR , 1st STORY
    Jun 15, 2026 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS AT BUILDING ENTRANCE DOOR , 1st STORY
    Jun 15, 2026 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 4th STORY
    Jul 10, 2024 · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 4th STORY
    Jul 10, 2024 · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT DOOR LEADING TO FIRE ESCAPE IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4E, 4th STORY, 4th APARTMENT FROM NORTH AT EAST
    Jun 4, 2024 · #4E · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING, NORTH AND EAST WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4E, 4th STORY, 4th APARTMENT FROM NORTH AT EAST
    Jun 4, 2024 · #4E · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4E, 4th STORY, 4th APARTMENT FROM NORTH AT EAST
    Jun 4, 2024 · #4E · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, NORTH AND EAST WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4E, 4th STORY, 4th APARTMENT FROM NORTH AT EAST
    Jun 4, 2024 · #4E · VIOLATION DISMISSED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4E, 4th STORY, 4th APARTMENT FROM NORTH AT EAST
    Jun 4, 2024 · #4E · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR AT PUBLIC HALL, 6th STORY
    Mar 26, 2024 · VIOLATION CLOSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, WEST WALL IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st PRIVATE HALLWAY FROM NORTH, THE 4th ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 26, 2024 · #6G · VIOLATION DISMISSED
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE APPROX. 1 SQ FT OF MOLD AT THE CERAMIC TILES AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE KITCHEN , THE 4th ROOM FROM NORTH, THE FOYER LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE LOWER SASH WINDOW IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ FT AT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Mar 21, 2024 · #6G · VIOLATION DISMISSED
DOB permits (last 30)
  • OT-
    JA LEE ELE
  • MH-
    EMPIRE TELECOM USA,LLC
  • PL-
    BAUER MECHANICAL LLC
  • FB-
    G. BAUER INC
  • EQ-
    XINOS CONSTRUCTION CORP
  • OT-
    XINOS CONSTRUCTION CORP
  • EQ-
    XINOS CONSTRUCTION CORP
  • OT-
    WIRELESS NETWORK GROUP IN
  • OT-
    CELLULAR TELEPHONE CO
  • MH-
    CELLULAR TELEPHONE CO
  • OT-
    CHARLES M DWYER INC
  • OT-
    CHARLES M DWYER INC
  • PL-
    BAUER MECHANCIAL LLC
  • OT-
    PREFERRED BUILDERS INC
  • EQ-
    SKYWORX CONTRACTING INC
  • MH-
    EMPIRE TELECOM USA,LLC
  • EQ-
    J & G GENERAL CONTRACTING
  • EQ-
    XINOS CONSTRUCTION CORP
  • EQ-
    XINOS CONSTRUCTION CORP
  • OT-
    XINOS CONSTRUCTION CORP
  • EQ-
    J & G GNRL CONTRACT CORP
  • OT-
    CHARLES M DWYER INC
DOB violations
  • Oct 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 11, 2014E-ELEVATOR ELEVATORREQUIRED
  • Feb 2, 2012C-CONSTRUCTION OTHER OPTIONAL
  • Jan 10, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jun 18, 2010E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 28, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 30, 2003E-ELEVATOR ELEVATORREQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 9, 1989E-ELEVATOR ELEVATORREQUIRED

More buildings in Brighton Beach

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3086850010

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Aug 27, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
22 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
275 violations in the current corpus · latest record Jun 15, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
16 violations in the current corpus · latest record Apr 1, 2021

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Brighton Beach market page.