CurbScoop
CurbScoopBuildingsBrighton Beach2727 OCEAN PARKWAY

2727 OCEAN PARKWAY

Brooklyn· Brighton Beach· built 1956class D4BBL 3072600028
Open listing source

2727 OCEAN PARKWAY is a 174-unit building in Brighton Beach, Brooklyn, built in 1956.

4 units are on the market here right now.

City records show 22 DOB permits and 80 open violations on file.

Units (res)
174
Floors
6.0
Lot ft²
62,900 ft²
Bldg ft²
150,000 ft²
Assessed
$7.15M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
2727 OCEAN PARKWAY #C27
Brooklyn · built 1956
Brighton Beach$349K$3491,000 ft²2 bd · 1 ba-103
26 HPD-C29 DOBbedbug
58.0Source
2727 OCEAN PARKWAY #B30
Brooklyn · built 1956
Brighton Beach$180K$360500 ft²studio · 1 ba-6
26 HPD-C29 DOBbedbug
58.0Source
2727 OCEAN PARKWAY #D2
Brooklyn · built 1956
Brighton Beach$195K$390500 ft²studio · 1 ba-34
26 HPD-C29 DOBbedbug
58.0Source
2727 OCEAN PARKWAY #F5
Brooklyn · built 1956
Brighton Beach$285K$380750 ft²1 bd · 1 ba-111
26 HPD-C29 DOBbedbug
58.0Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    May 7, 2026 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT 1ST DOOR LEADING TO PUBLIC HALL STAIRS AT SOUTH SECTION BASEMENT AT PUBLIC HALL
    Mar 9, 2026 · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT 1ST DOOR LEADING TO PUBLIC HALL STAIRS AT SOUTH SECTION BASEMENT AT PUBLIC HALL
    Mar 9, 2026 · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF A KICKSTAND AT ENTRANCE DOOR AT LAUNDRY ROOM, SECTION ''NORTH''
    Mar 9, 2026 · NOV SENT OUT
  • A
    §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE
    Feb 23, 2026 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR AT EAST AT PUBLIC HALL AT BASEMENT, SECTION AT SOUTH
    Feb 23, 2026 · VIOLATION CLOSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 20, 2025 · INFO NOV SENT OUT
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT F27, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 14, 2025 · #F27 · NOV SENT OUT
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT F27, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 14, 2025 · #F27 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT F27, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 14, 2025 · #F27 · VIOLATION CLOSED
  • A
    § 27-2042 ADM CODE PROVIDE A MIRROR IN SELF-SERVICE ELEVATOR ARRANGED SO AS TO ENABLE A PERSON ENTERING, TO VIEW INSIDE OF ELEVATOR NUMBER .. , 1st STORY
    May 21, 2025 · NOV SENT OUT
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT WINDOW LOWER SASH IN THE BATHROOM LOCATED AT APT B9, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    Oct 22, 2024 · #B9 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT B9, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    Oct 22, 2024 · #B9 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE UPPER CABINETS AT WEST WALL IN THE KITCHEN LOCATED AT APT B9, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    Oct 22, 2024 · #B9 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON DOOR IN THE ENTRANCE LOCATED AT APT B9, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    Oct 22, 2024 · #B9 · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT B9, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    Oct 22, 2024 · #B9 · NOV SENT OUT
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER SASH AT SOUTH WINDOW IN THE 4th ROOM FROM EAST LOCATED AT APT B9, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    Oct 22, 2024 · #B9 · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT B9, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    Oct 22, 2024 · #B9 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT B9, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    Oct 22, 2024 · #B9 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F25, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Sep 13, 2022 · #F25 · NOV CERTIFIED LATE
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F24, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Sep 13, 2022 · #F24 · NOV CERTIFIED LATE
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B22, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Sep 13, 2022 · #B22 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B30, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 13, 2022 · #B30 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A20, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
    Aug 31, 2022 · #A20 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C23, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH
    Aug 31, 2022 · #C23 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A2, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTH
    Aug 31, 2022 · #A2 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D21, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
    Aug 31, 2022 · #D21 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D9, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTH
    Aug 31, 2022 · #D9 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F28, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
    Aug 31, 2022 · #F28 · NOV CERTIFIED LATE
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D29, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , 1st SECTION FROM EAST AT SOUTH
    Aug 31, 2022 · #D29 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E17, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTHWEST
    Aug 31, 2022 · #E17 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E2, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTH
    Aug 31, 2022 · #E2 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C6, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''N 1-9'', 1st FROM WEST AT NORTH
    Jul 29, 2022 · #C6 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F19, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 29, 2022 · #F19 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D12, 4th STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''N 10-19'', 1st FROM WEST AT NORTH
    Jul 29, 2022 · #D12 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A11, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''N 10-19'', 1st FROM WEST AT NORTH
    Jul 29, 2022 · #A11 · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C5, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jul 29, 2022 · #C5 · NOV CERTIFIED LATE
  • C
    § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
    Jun 3, 2022 · #D2 · NOV SENT OUT
  • C
    § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
    Jun 3, 2022 · #D2 · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). - MISSING LOCATED AT APT D2, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    May 23, 2022 · #D2 · VIOLATION DISMISSED
DOB permits (last 30)
  • OT-
    J.K.CO9MPANY
  • PL-
    ALJER PLBG AND HTG CORP
  • MH-
    SUCCESS CONTACT INC
  • PL-
    APEX MECHANICAL CORP
  • MH-
    STRUCTURAL PRESERV SYSTEM
  • OT-
    STRUCTURAL PRESERV SYSTEM
  • MH-
    STRUCTURAL PRESERV SYSTEM
  • OT-
    STRUCTURAL PRESERV SYSTEM
  • MH-
    CARDONE CONCRETE, INC
  • OT-
    CARDONE CONCRETE INCORP
  • EQ-
    COLGATE SCAFOLDING
  • OT-
    WALEED CONSTRUCTION CORP
  • MH-
    ELA AIR CONDITIONING
  • OT-
    EMG INDUSTRIAL CHIMNEY IN
  • OT-
    CONCORDE RENOVATION OF NY INC
  • OT-
    WALEED CONSTRUCTION CORP
  • OT-
    FINIX U.S.A. CONSTRUCTION
  • PL-
    NICE PLUMBING CORP
  • BL-
    AGGRESSIVE HEATING INC
  • FB-
    AGGRESSIVE HEATING INC
  • FS-
    AGGRESSIVE HEATING INC
  • PL-
    WARD PLUMBING CORP
DOB violations
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 23, 2024LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 14, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 14, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 6, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 6, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 6, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2018E-ELEVATOR ELEVATORREQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 11, 2014E-ELEVATOR ELEVATORREQUIRED
  • Nov 11, 2014E-ELEVATOR ELEVATORREQUIRED
  • Nov 11, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 26, 2012E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2012E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 29, 2011E-ELEVATOR ELEVATORREQUIRED

More buildings in Brighton Beach

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:3072600028

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Aug 25, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
22 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
209 violations in the current corpus · latest record May 7, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
76 violations in the current corpus · latest record Nov 14, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Brighton Beach market page.