CurbScoop

125 OCEAN AVENUE

Brooklyn· Prospect Lefferts Gardens· built 1939class D4BBL 3050260034
Open listing source

125 OCEAN AVENUE is a 65-unit building in Prospect Lefferts Gardens, Brooklyn, built in 1939.

1 unit is on the market here right now.

City records show 8 DOB permits and 61 open violations on file.

Units (res)
65
Floors
6.0
Lot ft²
15,000 ft²
Bldg ft²
64,069 ft²
Assessed
$2.61M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
125 OCEAN AVENUE #1F
Brooklyn · built 1939
Prospect Lefferts Gardens$790K$7181,100 ft²1 bd · 1 ba-28
20 HPD-C5 DOBbedbug
40.4Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 15, 2026 · #2B · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 15, 2026 · #2B · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT NORTH AND EAST WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 19, 2026 · #2B · NOTICE OF ISSUANCE SENT TO TENANT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 19, 2026 · #2B · NOTICE OF ISSUANCE SENT TO TENANT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 19, 2026 · #2B · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOTWATER ABOVE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST
    Dec 17, 2025 · #6H · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Dec 17, 2025 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM THAT IS MISSING AT PUBLIC HALL, 1st STORY
    Dec 12, 2025 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Dec 12, 2025 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Dec 12, 2025 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Dec 12, 2025 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER TOP AND BOTTOM SHELF OF THE BASE CABINET AT THE SINK IN THE KITCHEN LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 2, 2025 · #6K · NOV SENT OUT
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 2, 2025 · #6K · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL OF THE CLOSET AT NORTH IN THE 1st ROOM FROM EAST LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 2, 2025 · #6K · NOV SENT OUT
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 2, 2025 · #6K · NOV SENT OUT
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER, EXCEEDING THE ALLOWED MAX IMUM TEMPERATURE OF 130 DEGREES F, IN THE HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 2, 2025 · #6K · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY
    Nov 5, 2024 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Nov 5, 2024 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Nov 5, 2024 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Nov 5, 2024 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 29, 2024 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Oct 29, 2024 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Oct 29, 2024 · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 16, 2021 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Apr 16, 2021 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 4, 2020 · #2B · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 4, 2020 · #2B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 4, 2020 · #2B · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT .. AT PUBLIC HALL, 1st STORY
    Nov 1, 2017 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Nov 1, 2017 · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Sep 12, 2014 · #1H · NOV SENT OUT
  • C
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... EAST WALL-8 SQ.FT. NORTH WALL-8 SQ.FT. WEST WALL-8 SQ.FT. SOUTH WALL -8 SQ.FT. CEILING -16 SQ.FT. IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Aug 18, 2014 · #1H · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WAALS AND CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Aug 18, 2014 · #1H · NOV SENT OUT
  • B
    SECTION 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE ... IN THE 1st ROOM FROM EAST LOCATED AT APT 1H, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Aug 18, 2014 · #1H · NOV SENT OUT
  • B
    SECTION 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1H, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Aug 18, 2014 · #1H · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1H, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Aug 18, 2014 · #1H · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASHBASIN IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Aug 18, 2014 · #1H · NOV SENT OUT
  • B
    SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 12, 2013 · #2B · NOV SENT OUT
  • C
    SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK ON THE DOOR TO THE ROOM LEADING TO THE FIRE ESCAPE IN THE 1st ROOM FROM EAST LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
    Feb 17, 2013 · #2H · NOV SENT OUT
  • B
    SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
    Feb 17, 2013 · #2H · VIOLATION DISMISSED
DOB permits (last 30)
  • OT-
    ALLSTATE RESTORATION CORP
  • EQ-
    SPRING SCAFFOLDING
  • OT-
    ALLSTATE RESTORATION CORP
  • EQ-
    ADVANCED CONSTRUCTION EQU
  • BL-
    CHAMP PLUMBING & HTG CORP
  • PL-
    CHAMP PLUMBING & HTG CORP
  • OT-
    CHAMPION COMBUSTION CORP
  • EQ-
    ADVANCED CONSTRUCTION EQU
DOB violations
  • May 3, 2023BENCH-FAILURE TO BENCHMARK NONE
  • Apr 4, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 10, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 24, 2017E-ELEVATOR ELEVATORREQUIRED
  • Apr 6, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 20, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 15, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 30, 2003CMQ-MARQUEE OTHER REQUIRED
  • Apr 3, 2002E-ELEVATOR ELEVATORREQUIRED
  • Mar 14, 2001E-ELEVATOR ELEVATORREQUIRED
  • Feb 7, 2000LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 27, 2000E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 1999LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Apr 28, 1998CMQ-MARQUEE OTHER REQUIRED
  • Jun 1, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 16, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 1, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Apr 1, 1987E-ELEVATOR ELEVATORREQUIRED

More buildings in Prospect Lefferts Gardens

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:3050260034

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 14, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
8 permits in the current corpus

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
120 violations in the current corpus · latest record Feb 17, 2026

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
21 violations in the current corpus · latest record Aug 14, 2023

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Prospect Lefferts Gardens market page.