CurbScoop
DealsBrooklyn1125 LORIMER STREET

1125 LORIMER STREET

Brooklyn· Greenpoint· built 1949class D4BBL 3025690035
Open listing source
Units (res)
60
Floors
6.0
Lot ft²
14,123 ft²
Bldg ft²
42,900 ft²
Assessed
$3.31M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1125 LORIMER STREET #5H
Brooklyn · built 1949
Greenpoint$999K-0 ft²2 bd · 1 ba-161
bedbug
6.0Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 7, 2007 · #1H · NOV SENT OUT
  • A
    SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, APARTMENT AT WEST
    Jun 7, 2007 · #1H · NOV SENT OUT
  • A
    SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2007 · #1H · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2007 · #1H · NOV SENT OUT
  • A
    SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 19, 2007 · #1H · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE KITCHENETTE LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 19, 2007 · #1H · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING & WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT MORTAR EAST WALL IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 200 WATTS MINIMUM REQUIRED
    May 17, 1999 · NOV SENT OUT
  • B
    SECTION 27-2045, 2046 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING 5 STY SOUTHEAST APT 5F , SECTION '' ''
    Dec 10, 1998 · #5F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING SOUTHEAST ROOM 6 STY EAST CENTER APT 6E. , SECTION '' ''
    Jul 24, 1998 · #6E · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THRU OUT 6 STY EAST CENTER APT 6E. , SECTION '' ''
    Jul 24, 1998 · #6E · NOV SENT OUT
DOB permits (last 30)
  • EQJan 5, 2001
    CLARK WILKINS INDUSTRIES
  • OT-
    POLER CONTRACTING INC
  • PL-
    JOHN FARR P & H CORP
  • PL-
    JOSEPH FERRIGNO P&H CO
  • FS-
    STAR INDUSTRIAL SERV CO
  • OT-
    N/A
  • PL-
    PAL-MAR PLBG & HTG INC
  • OT-
    AB PLUMBING INC
  • EQ-
    CLARK WILKINS INDUSTRIES
  • OT-
    POLER CONTRACTING INC
  • PL-
    TAK PLUMBING & HEATING CO
  • EQ-
    CLARK WILKINS INDUSTRIES
  • OT-
    GEORGE TINSMITH COMPANY
  • OT-
    ROBERT LIPPERT
  • OT-
  • PL-
    S & J INDUSTRIAL CORP