CurbScoop
CurbScoopBuildingsGreenpoint1125 LORIMER STREET

1125 LORIMER STREET

Brooklyn· Greenpoint· built 1949class D4BBL 3025690035
Open listing source

1125 LORIMER STREET is a 60-unit building in Greenpoint, Brooklyn, built in 1949.

1 unit is on the market here right now.

City records show 16 DOB permits and 42 open violations on file.

Units (res)
60
Floors
6.0
Lot ft²
14,123 ft²
Bldg ft²
42,900 ft²
Assessed
$3.31M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1125 LORIMER STREET #5H
Brooklyn · built 1949
Greenpoint$999K-0 ft²2 bd · 1 ba-161
10 DOBbedbug
11.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 7, 2007 · #1H · NOV SENT OUT
  • A
    SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, APARTMENT AT WEST
    Jun 7, 2007 · #1H · NOV SENT OUT
  • A
    SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2007 · #1H · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 23, 2007 · #1H · NOV SENT OUT
  • A
    SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 19, 2007 · #1H · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE KITCHENETTE LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 19, 2007 · #1H · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING & WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT MORTAR EAST WALL IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 17, 2003 · #1F · NOV SENT OUT
  • B
    SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 200 WATTS MINIMUM REQUIRED
    May 17, 1999 · NOV SENT OUT
  • B
    SECTION 27-2045, 2046 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING 5 STY SOUTHEAST APT 5F , SECTION '' ''
    Dec 10, 1998 · #5F · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING SOUTHEAST ROOM 6 STY EAST CENTER APT 6E. , SECTION '' ''
    Jul 24, 1998 · #6E · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THRU OUT 6 STY EAST CENTER APT 6E. , SECTION '' ''
    Jul 24, 1998 · #6E · NOV SENT OUT
DOB permits (last 30)
  • EQJan 5, 2001
    CLARK WILKINS INDUSTRIES
  • OT-
    POLER CONTRACTING INC
  • PL-
    JOHN FARR P & H CORP
  • PL-
    JOSEPH FERRIGNO P&H CO
  • FS-
    STAR INDUSTRIAL SERV CO
  • OT-
    N/A
  • PL-
    PAL-MAR PLBG & HTG INC
  • OT-
    AB PLUMBING INC
  • EQ-
    CLARK WILKINS INDUSTRIES
  • OT-
    POLER CONTRACTING INC
  • PL-
    TAK PLUMBING & HEATING CO
  • EQ-
    CLARK WILKINS INDUSTRIES
  • OT-
    GEORGE TINSMITH COMPANY
  • OT-
    ROBERT LIPPERT
  • OT-
  • PL-
    S & J INDUSTRIAL CORP
DOB violations
  • Apr 29, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Apr 8, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Mar 14, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 19, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Feb 17, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Feb 6, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 18, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • May 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 4, 2009LANDMK-LANDMARK NONE
  • Oct 30, 2009LANDMK-LANDMARK NONE
  • Mar 26, 2009E-ELEVATOR ELEVATORREQUIRED
  • Mar 26, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 12, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Nov 20, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jul 14, 2005E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 16, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Greenpoint

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:3025690035

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 28, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
16 permits in the current corpus · latest record Jan 5, 2001

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
15 violations in the current corpus · latest record Oct 1, 2009

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
27 violations in the current corpus · latest record Sep 9, 2021

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Greenpoint market page.