CurbScoop
CurbScoopBuildings360 CLINTON AVENUE

360 CLINTON AVENUE

Brooklyn· built 1928class D4BBL 3019430006

360 CLINTON AVENUE is a 96-unit building in Brooklyn, built in 1928.

3 units are on the market here right now.

City records show 30 DOB permits and 72 open violations on file.

Units (res)
96
Floors
6.0
Lot ft²
22,680 ft²
Bldg ft²
95,960 ft²
Assessed
$6.85M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
360 CLINTON AVENUE #2L
Brooklyn · built 1928
-$1.19M$1,1851,000 ft²2 bd · 1 ba-77
2 HPD-C1 DOBbedbug
10.6Source
360 CLINTON AVENUE #3T
Brooklyn · built 1928
-$1.50M$1,3641,100 ft²2 bd · 2 ba-25
2 HPD-C1 DOBbedbug
10.6Source
360 CLINTON AVENUE #3S
Brooklyn · built 1928
-$1.25M-0 ft²2 bd · 1 ba-20
2 HPD-C1 DOBbedbug
10.6Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 20, 2026 · #1C · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST AND EAST WALL. IN THE 1st ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 20, 2026 · #1C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 16, 2026 · #1C · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND WEST WALL. IN THE 1st ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 16, 2026 · #1C · CIV14 MAILED
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DRAWER AT THE BASE CABINET AT WEST IN THE KITCHEN LOCATED AT APT 5N, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 17, 2024 · #5N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE (INOPERATIVE) ELECTRICAL LIGHT FIXTURE ON THE SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5N, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 17, 2024 · #5N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE (INOPERATIVE) ELECTRICAL LIGHT FIXTURE AT THE CEILING. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5N, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 17, 2024 · #5N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE SINK IN THE KITCHEN LOCATED AT APT 5N, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 17, 2024 · #5N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'', 1st FROM EAST AT SOUTH
    Apr 26, 2022 · #3G · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 23, 2022 · #3G · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 23, 2022 · #3G · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE KEY OPERATED LOCK INSTALLED AT DOOR LEADING TO FIRE ESCAPE WINDOW IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 4, 2020 · #3L · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 29, 2019 · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 12 SQUARE FEET ON NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 8 SQUARE AT NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQUARE FEET ON NORTH WALL AT CLOSET IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REFIT CLOSET DOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR LOCK IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REFIT CLOSET DOOR IN THE FOYER LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE INTERIOR GLASS PANE AT LOWER SASH WINDOW 2ND FROM SOUTH AT WEST IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • A
    § 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO MISSING CHAIN GUARD IN THE ENTRANCE LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Feb 26, 2019 · #3L · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Feb 26, 2019 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Feb 26, 2019 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Feb 26, 2019 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY CAPS ON ELECTRICAL OUTLETS AT ALL WALLS AT PUBLIC HALL, 1st STORY
    Feb 26, 2019 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELECTRICAL OUTLET ON NORTH WALL AT PUBLIC HALL, 1st STORY
    Feb 26, 2019 · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 8 SQUARE AT NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH ORIGINAL VIOLATION 12932570 ISSUED 26-FEB-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Feb 26, 2019 · #3L · DEFECT LETTER ISSUED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQUARE FEET ON NORTH WALL AT CLOSET IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH ORIGINAL VIOLATION 12932573 ISSUED 26-FEB-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Feb 26, 2019 · #3L · DEFECT LETTER ISSUED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCKSET AT DOOR IN THE ENTRANCE LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT WEST
    Oct 29, 2018 · #5N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOWER SASH WINDOW GLASS IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
    May 3, 2017 · #5N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
    May 3, 2017 · #5N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
    May 3, 2017 · #5N · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 8, 2015 · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST
    Jun 23, 2014 · #3L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE METAL BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST
    Jun 23, 2014 · #3L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE CABINET IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST
    Jun 23, 2014 · #3L · NOV SENT OUT
DOB permits (last 30)
  • FSApr 22, 2004
    STAR INDUSTRIAL SVC CO INC
  • OTMay 16, 1997
    ODYSSIA GENERAL CONSTRUCTION INC
  • PL-
    FRANK TROMBETTA & SONS CO
  • OT-
    DJM NYC, LLC
  • OT-
    C & J CARPENTRY NEW YORK
  • OT-
    RODON HOME IMPROVEMENT IN
  • OT-
    ODYSSIA GLOBAL COMM. CORP
  • MH-
    ART OF CONSTRUCTION
  • PL-
    CAM ENERGY HEATING AND ME
  • FB-
    STAR INDUSTRIAL SVC CO INC
  • FS-
    STAR INDUSTRIAL SVC CO INC
  • OT-
    GAUDIOSO CONTRACTING INC
  • PL-
    PETER MICELI PLUMBING
  • OT-
    RADEK SZCZESNY
  • OT-
    UPGRADE CONTR. CO. INC
  • OT-
    D Z IMAGE INC
  • MH-
    D Z IMAGE INC
  • PL-
    SO PLUMBING & HEATING INC
  • FB-
    STAR INDUSTRIAL SVC CO INC
  • FS-
    STAR INDUSTRIAL SVC CO INC
  • PL-
    JOSEPH FERRIGNO PLBG & HTG
  • PL-
    TOP PLUMBING GROUP,INC
  • OT-
    BERLINER COMMUNICATIONS
  • MH-
    BERLINER COMMUNICATIONS
  • OT-
    C & J CARPENTRY NEW YORK
  • OT-
    SCHNELLBACHER
  • MH-
    ODYSSIA GENERAL CONSTRUCTION INC
  • OT-
    ODYSSIA GENERAL CONSTRUCTION INC
  • PL-
    TRUE NORTH MECHANICAL LLC
  • OT-
    GAUDIOSO CONTRACTING INC
DOB violations
  • Jul 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jun 9, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 9, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 23, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 25, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 25, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 11, 2009E-ELEVATOR ELEVATORREQUIRED
  • Mar 11, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2006E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2003LANDMK-LANDMARK NONE
  • Mar 14, 2001E-ELEVATOR ELEVATORREQUIRED
  • Mar 14, 2001E-ELEVATOR ELEVATORREQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 7, 2000LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jul 25, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 22, 1989E-ELEVATOR ELEVATORREQUIRED
  • Feb 22, 1989E-ELEVATOR ELEVATORREQUIRED

More buildings in Brooklyn

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3019430006

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jul 30, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
52 permits in the current corpus · latest record Apr 22, 2004

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
58 violations in the current corpus · latest record Apr 24, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
32 violations in the current corpus · latest record Dec 2, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.