CurbScoop
CurbScoopBuildingsCrown Heights1935 BERGEN STREET

1935 BERGEN STREET

Brooklyn· Crown Heights· built 1910class C1BBL 3014460046
Open listing source

1935 BERGEN STREET is a 16-unit building in Crown Heights, Brooklyn, built in 1910.

1 unit is on the market here right now.

City records show 19 DOB permits and 66 open violations on file.

Units (res)
16
Floors
4.0
Lot ft²
4,823 ft²
Bldg ft²
16,020 ft²
Assessed
$484K
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1935 BERGEN STREET #16
Brooklyn · built 1910
Crown Heights$4.58M$28616,020 ft²52 bd · 16 ba-170
253 HPD-C11 DOBbedbug
394.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASEBOARD AND DOOR TRIM AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR TRIM AT WEST WALL IN THE BATHROOM LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND SHOWER PAN IN THE BATHROOM LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING TO EAST COURT AT PUBLIC HALL, 1st STORY
    Jun 10, 2026 · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 10, 2026 · #4 · VIOLATION OPEN
  • B
    § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS, BICYLES AND STROLLERS AT PUBLIC HALL, 1st STORY
    Jun 10, 2026 · VIOLATION OPEN
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    May 1, 2026 · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE 1ST TREAD FROM BOTTOM AT PUBLIC HALL STAIRS, 1st STORY
    Apr 30, 2026 · NOV CERTIFIED ON TIME
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING METAL PAN UNDER 1ST TREAD AT PUBLIC HALL STAIRS, 1st STORY
    Apr 30, 2026 · NOV CERTIFIED ON TIME
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR , 1st STORY
    Apr 30, 2026 · NOV CERTIFIED ON TIME
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · VIOLATION WILL BE REINSPECTED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING, EAST WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 1st STORY
    Apr 10, 2026 · NOV CERTIFIED ON TIME
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER SASH WINDOW IN THE BATHROOM LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · VIOLATION WILL BE REINSPECTED
  • A
    §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE
    Apr 10, 2026 · NOV CERTIFIED ON TIME
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · CIV14 MAILED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING, EAST WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 3rd STORY
    Apr 10, 2026 · NOV CERTIFIED ON TIME
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE ON DOOR AT PUBLIC HALL BULKHEAD TO ROOF
    Apr 10, 2026 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 3rd STORY
    Apr 10, 2026 · NOV CERTIFIED ON TIME
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE ON EXIT DOOR TO FIRE PASSAGEWAY AT PUBLIC HALL, 1st STORY
    Apr 10, 2026 · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW, 2ND FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 1st STORY
    Apr 10, 2026 · NOV CERTIFIED ON TIME
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW IN THE KITCHEN LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · VIOLATION WILL BE REINSPECTED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR BELL BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE TO BOX AT EAST WALL IN THE FOYER LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
  • C
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, EAST WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 1st STORY
    Apr 10, 2026 · NOV CERTIFIED ON TIME
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE METAL STRIKE PLATE ON DOOR FRAME AT BUILDING ENTRANCE
    Apr 10, 2026 · NOV CERTIFIED ON TIME
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING MAXIMUM ALLOWABLE 130 DEGREES AT SINK, WASHBASIN IN THE ENTIRE APARTMENT LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · VIOLATION WILL BE REINSPECTED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCKING DEVICE ON DOOR IN THE ENTRANCE LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW, 1ST FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
  • C
    § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · VIOLATION WILL BE REINSPECTED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE KITCHEN LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
  • C
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, EAST WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 3rd STORY
    Apr 10, 2026 · INVALID CERTIFICATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 15, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 10, 2026 · #15 · NOV SENT OUT
DOB permits (last 30)
  • PLMar 20, 2018
    PRECISION PLBG SVCS., INC
  • BLSep 17, 1992
    ATLANTIC & PACIFIC OIL CO INC.
  • MH-
    PRECISION PLUMBING SERVIC
  • PL-
    PRECISION PLBG SVCS., INC
  • OT-
    PRECISION PLUMBING SERVIC
  • PL-
    PRECISION PLBG SVCS., INC
  • PL-
    PRECISION PLBG SVCS., INC
  • OT-
    PRECISION PLUMBING SERVIC
  • PL-
    PRECISION PLBG SVCS., INC
  • OT-
    STEFAN INC
  • FB-
    ATLANTIC & PACIFIC OIL CO INC.
  • BL-
    ATLANTIC & PACIFIC OIL CO INC.
  • OT-
    NYC CONSTRUCTION INC
  • OT-
    SNBD ENTERPRISES LLC
  • OT-
    NYC CONSTRUCTION INC
  • MH-
    NYC CONSTRUCTION INC
  • PL-
    PRECISION PLBG SVCS., INC
  • OT-
    NYC CONSTRUCTION INC
  • OT-
    STEFAN INC
DOB violations
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 9, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Sep 9, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 15, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 15, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 20, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 20, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 20, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 9, 2017C-CONSTRUCTION OTHER OPTIONAL
  • Oct 1, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 20, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 28, 2013AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 2, 2013AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 29, 2006C-CONSTRUCTION OTHER OPTIONAL
  • Aug 16, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Crown Heights

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:3014460046

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jan 8, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
19 permits in the current corpus · latest record Mar 20, 2018

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
861 violations in the current corpus · latest record Jun 10, 2026

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
26 violations in the current corpus · latest record Jun 30, 2023

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Crown Heights market page.