CurbScoop
CurbScoopBuildingsCrown Heights960 STERLING PLACE

960 STERLING PLACE

Brooklyn· Crown Heights· built 1938class D4BBL 3012490007

960 STERLING PLACE is a 79-unit building in Crown Heights, Brooklyn, built in 1938.

3 units are on the market here right now.

City records show 27 DOB permits and 79 open violations on file.

Units (res)
79
Floors
6.0
Lot ft²
21,276 ft²
Bldg ft²
92,688 ft²
Assessed
$2.23M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
960 STERLING PLACE #6B
Brooklyn · built 1938
Crown Heights$599K-0 ft²1 bd · 1 ba-12
48 HPD-C8 DOBbedbug
87.2Source
960 STERLING PLACE #3K
Brooklyn · built 1938
Crown Heights$425K$708600 ft²studio · 1 ba-44
48 HPD-C8 DOBbedbug
87.2Source
960 STERLING PLACE #4N
Brooklyn · built 1938
Crown Heights$635K-0 ft²1 bd · 1 ba-50
48 HPD-C8 DOBbedbug
87.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 21, 2026 · #4L · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB IN THE ENTRANCE LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 21, 2026 · #4L · VIOLATION OPEN
  • B
    § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT BALCONY AT 1ST FIRE ESCAPE FROM NORTH AT WEST EXTERIOR WALL AT FIRE ESCAPE, 2nd STORY
    Aug 23, 2026 · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 6th STORY, SECTION AT EAST
    Jun 16, 2026 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT DOOR AT COMPACTOR CLOSET, 6th STORY, SECTION AT EAST
    Jun 16, 2026 · VIOLATION OPEN
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 7, 2026 · #5D · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 7, 2026 · #3D · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST
    Apr 7, 2026 · #5J · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 7, 2026 · #6D · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 7, 2026 · #1G · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #2N · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #1C · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 7, 2026 · #6A · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 7, 2026 · #2E · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 7, 2026 · #4D · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 7, 2026 · #5A · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #5C · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 7, 2026 · #3E · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 7, 2026 · #2L · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5L, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 7, 2026 · #5L · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6N, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #6N · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #6C · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 7, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST
    Apr 7, 2026 · #3J · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 7, 2026 · #3L · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #6B · NOV SENT OUT
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #3C · NOV SENT OUT
  • C
    § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
    Feb 5, 2026 · #6J · NOV SENT OUT
  • C
    § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
    Feb 5, 2026 · #6J · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL, EAST WALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST, THE FOYER LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT PIPE WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
  • C
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WATERCLOSET IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2025 · #3F · NOV SENT OUT
DOB permits (last 30)
  • OT-
    VERTEX RESTORATION CORP
  • OT-
    MSR CONSTRUCTION CORP
  • OT-
    VERTEX RESTORATION CORP
  • PL-
    DELTA-SIGMA MECH CORP
  • PL-
    TRIAD PLBG & MECH CORP
  • OT-
    EASTERN EMPIRE CONTRACT I
  • OT-
    ALPHA CARE SUPPLY, LLC
  • OT-
    VERTEX RESTORATION CORP
  • OT-
    ARCADIA CONSTRUCTION CO
  • PL-
    D & L PLUMBING AND HEATING
  • PL-
    DELTA-SIGMA MECH CORP
  • EQ-
    OUTDOOR INSTALLATIONS LLC
  • OT-
    CHAMPION COMBUSTION CORP
  • BL-
    CHAMP PLUMBING & HTG CORP
  • PL-
    CHAMP PLUMBING & HTG CORP
  • OT-
    VERTEX RESTORATION CORP
  • OT-
    EASTERN EMPIRE CONTRACT I
  • OT-
    NEW YORK UNITED CONT INC
  • OT-
    FAMURAT BUILDERS, LLC
  • EQ-
    BS GROUP.INC
  • OT-
    EASTERN EMPIRE CONTRACT I
  • OT-
    VERTEX RESTORATION CORP
  • OT-
    L & Z RESTORATION CORP
  • OT-
    VERTEX RESTORATION CORP
  • EQ-
    ADVANCED CONSTRUCTION EQU
  • EQ-
    ADVANCED CONSTRUCTION EQU
  • FB-
    STEPHEN BRAUN
DOB violations
  • Feb 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Feb 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Feb 25, 2016E-ELEVATOR ELEVATORREQUIRED
  • Feb 25, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 10, 2012E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2009E-ELEVATOR ELEVATORREQUIRED
  • Feb 23, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 11, 2008E-ELEVATOR ELEVATORREQUIRED
  • Nov 30, 2007LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Apr 30, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 30, 2007E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2006E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2004E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2003E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2003E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2003LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 8, 2001LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Mar 6, 2001E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2001E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2000E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2000E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 1999LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 1, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 16, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 1, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Dec 21, 1989E-ELEVATOR ELEVATORREQUIRED
  • Dec 21, 1989E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 1988E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 1988E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Crown Heights

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3012490007

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Aug 19, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
27 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
195 violations in the current corpus · latest record Sep 21, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
39 violations in the current corpus · latest record Dec 16, 2022

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Crown Heights market page.