CurbScoop
CurbScoopBuildingsProspect Heights41 EASTERN PARKWAY

41 EASTERN PARKWAY

Brooklyn· Prospect Heights· built 1926class D4BBL 3011790096

41 EASTERN PARKWAY is a 60-unit building in Prospect Heights, Brooklyn, built in 1926.

2 units are on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
60
Floors
12.0
Lot ft²
11,846 ft²
Bldg ft²
125,300 ft²
Assessed
$9.10M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
41 EASTERN PARKWAY #5C
Brooklyn · built 1926
Prospect Heights$1.36M-0 ft²2 bd · 1 ba-28
18 HPD-C18 DOBbedbug
44.0Source
41 EASTERN PARKWAY #10C
Brooklyn · built 1926
Prospect Heights$950K-0 ft²1 bd · 1 ba-0
18 HPD-C18 DOBbedbug
44.0Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Feb 12, 2025 · #5C · NOV SENT OUT
  • C
    § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
    Nov 21, 2024 · #PHA · NOV SENT OUT
  • C
    § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
    Nov 21, 2024 · #PHA · NOV SENT OUT
  • B
    § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 9, 2018 · #2D · VIOLATION DISMISSED
  • B
    § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 13A, 13th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 9, 2018 · #13A · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 9, 2018 · #2D · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 13A, 13th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jan 9, 2018 · #13A · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 6, 2015 · #2D · VIOLATION CLOSED
  • C
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 6, 2015 · #2D · VIOLATION CLOSED
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING(APPROX. 4 SQ. FT.) IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 6, 2015 · #2D · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
    Jun 6, 2015 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 6, 2015 · #2D · VIOLATION CLOSED
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROX. 15 SQ. FT. AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 29, 2015 · #2D · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL
    Apr 29, 2015 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 29, 2015 · #2D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 29, 2015 · #2D · VIOLATION CLOSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING , 1st STORY
    Apr 4, 2015 · NOT COMPLIED WITH
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 4, 2015 · #2D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 4, 2015 · #2D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 4, 2015 · #2D · VIOLATION CLOSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER., 1st STORY
    Apr 4, 2015 · NOT COMPLIED WITH
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 4, 2015 · #2D · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. , 1st STORY
    Apr 4, 2015 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Apr 4, 2015 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
    Mar 25, 2015 · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER ALL CEILINGS & ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT PENTHOUSE 13A
    Oct 1, 2013 · #13A · VIOLATION CLOSED
  • B
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING (APPROXIMATELY 5 SQUARE FEET) IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, APARTMENT AT NORTH
    Apr 10, 2013 · #2D · VIOLATION CLOSED
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, APARTMENT AT NORTH
    Apr 10, 2013 · #2D · VIOLATION CLOSED
  • B
    SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, APARTMENT AT NORTH
    Apr 10, 2013 · #2D · VIOLATION CLOSED
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WINDOW SILL AT WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE NORTH & EAST WALLS IN THE BATHROOM LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & NORTH WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH & WEST WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST & SOUTH WALLS IN THE FOYER LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CABINET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 11D, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 19, 2013 · #11D · VIOLATION CLOSED
DOB permits (last 30)
  • PLMay 1, 1992
    VERGA & CO CONTRACTING INC
  • OTApr 27, 1992
    PRIME CONTRACTING AND DESIGN COR
  • OT-
    WALKER RIDGE CONSTR INC
  • PL-
    C & T PLUMBING & HTG INC
  • OT-
    HOWARD M. HAIMES INC
  • OT-
    TATRAS CONSTRUCTION CORP
  • PL-
    ARK-POL PLUMBING CORP
  • OT-
    HOWARD M. HAIMES INC
  • OT-
    WALKER RIDGE CONSTR INC
  • PL-
    GIACHETTI PLBG & HTG CORP
  • EQ-
    SPRING SCAFFOLDING
  • OT-
    HOCKMANN HILL GROUP INC
  • OT-
    HOCKMANN HILL GROUP INC
  • OT-
    GRAHAM RESTORATION CO., INC.
  • EQ-
    POWER BRIDGING & SCAFFOLDING, IN
  • PL-
    J HARRIS PLBG AND HTG COR
  • OT-
    INTREVCO INC
  • EQ-
    PERIMETER BRIDGE & SCAFFOLD
  • MH-
    INTREVCO INC
  • EQ-
    POWER BRIDGING & SCAFFOLDING, IN
  • OT-
    PRIME CONTRACTING AND DESIGN COR
  • OT-
    WORLD WIDE CONST & RESTORATION
  • PL-
    VERGA & CO CONTRACTING INC
  • OT-
    DESIGN TECH CONSTRUCT COR
  • PL-
    DONATO, INC
  • EQ-
    PERIMETER BRIDGE & SCAFFOLD
  • PL-
    LEGACY PLUMBING & HEATING
  • EQ-
    PERIMETER BRIDGE & SCAFFOLD
  • OT-
    FAMURAT BUILDERS, LLC
  • OT-
    STARTER DEMOLITION CO INC
DOB violations
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 10, 2022FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Mar 10, 2022FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Jan 24, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Feb 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jun 18, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 18, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 18, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Dec 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2011E-ELEVATOR ELEVATORREQUIRED

More buildings in Prospect Heights

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:3011790096

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 4, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
82 permits in the current corpus · latest record May 1, 1992

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
114 violations in the current corpus · latest record Feb 18, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
83 violations in the current corpus · latest record Nov 14, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Prospect Heights market page.