10 PLAZA ST EAST
Units (res)
134
Floors
15.0
Lot ft²
14,700 ft²
Bldg ft²
163,000 ft²
Assessed
$10.9M
DOF total
Comps L5y
0
Active sale listings (2)
| Address | Neighborhood | Price | $/ft² | Sqft | Beds/Baths | vs comp | DOM | Risk | Score | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 10 PLAZA STREET EAST #6G Brooklyn · built 1959 | Prospect Heights | $899K | $1,058 | 850 ft² | 1 bd · 1 ba | - | 33 | 1 HPD-Cbedbug | 7.9 | Source | |
| 10 PLAZA ST EAST #12H Brooklyn · built 1959 | Prospect Heights | $1.50M | - | 0 ft² | 2 bd · 2 ba | - | 27 | 1 HPD-Cbedbug | 7.9 | Source |
Transaction history (0)
Every recorded deed for this tax lot.
No recorded transactions for this BBL yet.
Building risk + activity
HPD violations (last 40)
- B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM EAST AT SOUTHApr 19, 2023 · #8A · VIOLATION CLOSED
- A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 3 SQ. FT. AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WESTApr 11, 2023 · #8A · VIOLATION CLOSED
- B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WESTApr 11, 2023 · #8A · VIOLATION CLOSED
- B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 3 SQ. FT. AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 15915817 ISSUED 11-APR-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).Apr 11, 2023 · #8A · VIOLATION CLOSED
- B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WESTApr 3, 2023 · #8A · VIOLATION CLOSED
- C§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 30 SQ. FT. AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WESTApr 3, 2023 · #8A · VIOLATION CLOSED
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Apr 12, 2021 · VIOLATION DISMISSED
DOB permits (last 30)
- OTJul 18, 2007ETNA CONTRACTING INC.
- EQ-PATRON CONSTRUCTION CORP
- EQ-ROCKLEDGE SCAFFOLDING CORP
- OT-S & E BUILDING MAINTENANCE
- OT-ETNA CONTRACTING INC.
- PL-AQUEDUCT PLBG & MECH CORP
- FS-STAR INDUSTRIAL SVC CO INC
- PL-JOSEPH FERRIGNO PLBG & HTG
- OT-SOLEX CONSTRUCTION INC
- PL-EMR MECHANICAL CORP
- OT-ETNA CONTRACTING INC
- OT-TOWER BUILDING
- EQ-EMPIRE SCAFFOLDING SYSTEMS INC
- PL-BMC PLUMBING CORP
- BL-BMC PLUMBING CORP
- OT-RAMA GENERAL CONSTRUCTION
- OT-ABILENE INC
- BL-BMC PLUMBING CORP
- PL-BMC PLUMBING CORP
- EQ-EVEREST SCAFFOLDING INC
- OT-RENNOVATIONS UNLIMITED
- PL-ALADDIN PLUMBING CORP
- OT-ADELPHI RESTORATION CORP
- EQ-ROCKLEDGE SCAFFOLDING CORP
- OT-NEW AMSTERDAM BUILDING SO
- OT-BZ CONSTRUCTION OF NY LLC
- OT-ADELPHI RESTORATION CORP
- EQ-EVEREST SCAFFOLDING INC
- OT-ETNA CONTRACTING INC.
- OT-ALPINE WOODWORKS