CurbScoop
CurbScoopBuildingsProspect Heights10 PLAZA ST EAST

10 PLAZA ST EAST

Brooklyn· Prospect Heights· built 1959class D4BBL 3011690001
Open listing source

10 PLAZA ST EAST is a 134-unit building in Prospect Heights, Brooklyn, built in 1959.

2 units are on the market here right now.

City records show 30 DOB permits and 47 open violations on file.

Units (res)
134
Floors
15.0
Lot ft²
14,700 ft²
Bldg ft²
163,000 ft²
Assessed
$10.9M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
10 PLAZA STREET EAST #6G
Brooklyn · built 1959
Prospect Heights$899K$1,058850 ft²1 bd · 1 ba-33
1 HPD-C14 DOBbedbug
14.8Source
10 PLAZA ST EAST #12H
Brooklyn · built 1959
Prospect Heights$1.50M-0 ft²2 bd · 2 ba-27
1 HPD-C14 DOBbedbug
14.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 19, 2023 · #8A · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 3 SQ. FT. AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 11, 2023 · #8A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 11, 2023 · #8A · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 3 SQ. FT. AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 15915817 ISSUED 11-APR-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Apr 11, 2023 · #8A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 3, 2023 · #8A · VIOLATION CLOSED
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 30 SQ. FT. AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 3, 2023 · #8A · VIOLATION CLOSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 12, 2021 · VIOLATION DISMISSED
DOB permits (last 30)
  • OTJul 18, 2007
    ETNA CONTRACTING INC.
  • EQ-
    PATRON CONSTRUCTION CORP
  • EQ-
    ROCKLEDGE SCAFFOLDING CORP
  • OT-
    S & E BUILDING MAINTENANCE
  • OT-
    ETNA CONTRACTING INC.
  • PL-
    AQUEDUCT PLBG & MECH CORP
  • FS-
    STAR INDUSTRIAL SVC CO INC
  • PL-
    JOSEPH FERRIGNO PLBG & HTG
  • OT-
    SOLEX CONSTRUCTION INC
  • PL-
    EMR MECHANICAL CORP
  • OT-
    ETNA CONTRACTING INC
  • OT-
    TOWER BUILDING
  • EQ-
    EMPIRE SCAFFOLDING SYSTEMS INC
  • PL-
    BMC PLUMBING CORP
  • BL-
    BMC PLUMBING CORP
  • OT-
    RAMA GENERAL CONSTRUCTION
  • OT-
    ABILENE INC
  • BL-
    BMC PLUMBING CORP
  • PL-
    BMC PLUMBING CORP
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    RENNOVATIONS UNLIMITED
  • PL-
    ALADDIN PLUMBING CORP
  • OT-
    ADELPHI RESTORATION CORP
  • EQ-
    ROCKLEDGE SCAFFOLDING CORP
  • OT-
    NEW AMSTERDAM BUILDING SO
  • OT-
    BZ CONSTRUCTION OF NY LLC
  • OT-
    ADELPHI RESTORATION CORP
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    ETNA CONTRACTING INC.
  • OT-
    ALPINE WOODWORKS
DOB violations
  • Jan 10, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 10, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 10, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • May 16, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 28, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 28, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 5, 2010E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2010E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 2, 2009E-ELEVATOR ELEVATORREQUIRED
  • Mar 2, 2009E-ELEVATOR ELEVATORREQUIRED
  • Mar 2, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2008E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2008E-ELEVATOR ELEVATORREQUIRED
  • Oct 6, 2008E-ELEVATOR ELEVATORREQUIRED
  • Oct 5, 2007E-ELEVATOR ELEVATORREQUIRED
  • Oct 5, 2007E-ELEVATOR ELEVATORREQUIRED
  • Oct 5, 2007E-ELEVATOR ELEVATORREQUIRED
  • Oct 5, 2007E-ELEVATOR ELEVATORREQUIRED
  • Oct 5, 2007E-ELEVATOR ELEVATORREQUIRED
  • Oct 5, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 7, 2006E-ELEVATOR ELEVATORREQUIRED
  • Nov 7, 2006E-ELEVATOR ELEVATORREQUIRED

More buildings in Prospect Heights

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:3011690001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record May 27, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 13, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
53 permits in the current corpus · latest record Jul 18, 2007

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
7 violations in the current corpus · latest record Nov 13, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
59 violations in the current corpus · latest record Dec 16, 2022

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Prospect Heights market page.