CurbScoop
CurbScoopBuildingsCarroll Gardens327 COURT STREET

327 COURT STREET

Brooklyn· Carroll Gardens· built 1900class S9BBL 3004280009

327 COURT STREET is a 6-unit building in Carroll Gardens, Brooklyn, built in 1900.

1 unit is on the market here right now.

City records show 9 DOB permits and 21 open violations on file.

Units (res)
6
Floors
3.0
Lot ft²
1,888 ft²
Bldg ft²
6,600 ft²
Assessed
$1.66M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
325 COURT STREET
Brooklyn · built 1900
Carroll Gardens$5.10M$7566,745 ft²6 bd · 6 ba-453
3 HPD-C2 DOBbedbug
11.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 22, 2023 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 8, 2021 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Sep 11, 2018 · VIOLATION CLOSED
  • B
    § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF AIR CONDITIONERS AT 2ND AND 3RD STORIES, NORTHCENTER FIRE ESCAPE
    Sep 7, 2018 · VIOLATION CLOSED
  • B
    § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF FLOWER POTS AT 2ND STORY, NORTHEAST FIRE ESCAPE
    Sep 7, 2018 · VIOLATION CLOSED
  • B
    § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF FLOWER POTS AT 2ND STORY BALCONY AT NORTH STACK BUILDING FRONT
    Aug 31, 2018 · VIOLATION CLOSED
  • B
    § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF AIR CONDITIONER PROTRUDING MORE THAN 4 INCHES FROM WINDOW SILL ON 3RD STORY BALCONY, CENTER STACK AT EAST EXTERIOR WALL
    Aug 31, 2018 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING GUARD RAIL 3 STORY BALCONY AT SOUTH-2 FFIRE ESCAPE AT BUILDING FRONT
    Aug 30, 2018 · VIOLATION CLOSED
  • B
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES .. IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, APARTMENT AT WEST
    Aug 30, 2018 · #2F · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING GUARD RAIL 3 STORY BALCONY AT SOUTH-3 FFIRE ESCAPE AT BUILDING FRONT
    Aug 30, 2018 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, APARTMENT AT WEST
    Aug 30, 2018 · #2F · NOT COMPLIED WITH
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, APARTMENT AT WEST
    Aug 30, 2018 · #2F · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, APARTMENT AT WEST
    Aug 30, 2018 · #2F · VIOLATION CLOSED
  • B
    § 27-2044 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 2F, 2nd STORY, APARTMENT AT WEST
    Aug 30, 2018 · #2F · VIOLATION CLOSED
  • A
    § 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO CHAIN DOOR GUARD IN THE ENTRANCE LOCATED AT APT 2F, 2nd STORY, APARTMENT AT WEST
    Aug 30, 2018 · #2F · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING GUARD RAIL 3 STORY BALCONY AT SOUTH-1 FFIRE ESCAPE AT BUILDING FRONT
    Aug 30, 2018 · VIOLATION CLOSED
DOB permits (last 30)
  • OT-
    GOJANI HOME IMPROVEMENTS
  • PL-
    GREGG NY PLUMBING, INC
  • MH-
    CORPORATE CLIMATE CONTROL
  • OT-
    WAI KEE CONSTRUCTION INC
  • OT-
    W C L CONSTRUCTION INC
  • MH-
    W C L CONSTRUCTION INC
  • FP-
    MASTER FIRE PREVENTION SYSTEMS
  • PL-
    CHINATOWN PLUMBING & HTG.INC.
  • PL-
    CHINATOWN PLUMBING & HTG.INC.
DOB violations
  • Jan 20, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 20, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Carroll Gardens

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3004280009

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 4, 2025

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
9 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
16 violations in the current corpus · latest record Dec 21, 2023

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
5 violations in the current corpus · latest record Jan 20, 2021

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Carroll Gardens market page.