CurbScoop
CurbScoopBuildingsSouth Harlem301 WEST 118 STREET

301 WEST 118 STREET

Manhattan· South Harlem· built 2006class RMBBL 1019457504
Open listing source

301 WEST 118 STREET is a 91-unit building in South Harlem, Manhattan, built in 2006.

1 unit is on the market here right now.

City records show 30 DOB permits and 41 open violations on file.

Units (res)
91
Floors
12.0
Lot ft²
20,183 ft²
Bldg ft²
153,681 ft²
Assessed
$14.3M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
301 WEST 118 STREET #PH1F
Manhattan · built 2006
South Harlem$1.20M$9881,214 ft²2 bd · 2 ba-98
9 DOBbedbug
13.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR AT WOODEN WALL CABINET IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jan 2, 2010 · #6D · NOV SENT OUT
DOB permits (last 30)
  • SG-
    NEW YORK SIGN CONTRACTOR
  • OT-
    AND RENOVATION LLC
  • MH-
    P & R INFINITY AIR CORP
  • FP-
    ACTIVE FIRE CONTROL, INC
  • PL-
    TESTERMAN PLBG & HTG INC
  • SP-
    BIG APPLE FIRE SPRKL CO I
  • OT-
    ARTIMUS CONSTRUCTION INC
  • EQ-
    COLGATE ENTERPRISE CORP
  • EQ-
    COLGATE ENTERPRISE CORP
  • EQ-
    COLGATE ENTERPRISE CORP
  • OT-
    LOCUS CONSTRUCTION INC
  • MH-
    LOCUS CONSTRUCTION INC
  • MH-
    DONNELLY MECHANICAL CORP
  • PL-
    JULIAN PLBG & HTG CORP
  • PL-
    RENTOM GROUP CORP
  • PL-
    CROSSFIELD PLBG & HTG COR
  • OT-
    KONSTANT KONSTRUCTION COR
  • OT-
    STRUCTURAL PRESERV SYSTEM
  • OT-
    STRUCTURAL PRESERV SYSTEM
  • OT-
    RACANELLI DEVELOPMENT GRP
  • EQ-
    STRUCTURAL PRESERV SYSTEM
  • PL-
    SENID PL & HTG CORP
  • EQ-
    COLGATE ENTERPRISE CORP
  • OT-
    LOCUS CONSTRUCTION INC
  • MH-
    LOCUS CONSTRUCTION INC
  • OT-
    KONSTANT KONSTRUCTION COR
  • PL-
    WILLIAM C. GERAKARIS P&H
  • SP-
    NYCO PLBG & HTG CORP
  • BL-
    SENID PL & HTG CORP
  • PL-
    SENID PL & HTG CORP
DOB violations
  • Aug 12, 2026C-CONSTRUCTION OTHER OPTIONAL
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 23, 2024LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 3, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 2, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 1, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 1, 2017E-ELEVATOR ELEVATORREQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACJ1-(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Dec 1, 2016EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Dec 1, 2016EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Dec 17, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2015C-CONSTRUCTION OTHER OPTIONAL
  • Jul 21, 2015C-CONSTRUCTION OTHER OPTIONAL
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Oct 26, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 25, 2013E-ELEVATOR ELEVATORREQUIRED

More buildings in South Harlem

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1019457504

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Mar 12, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
30 permits in the current corpus

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
1 violation in the current corpus · latest record Jan 5, 2010

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
61 violations in the current corpus · latest record Aug 12, 2026

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the South Harlem market page.