CurbScoop
CurbScoopBuildingsSouth Harlem1400 5 AVENUE

1400 5 AVENUE

Manhattan· South Harlem· built 2003class RMBBL 1015997501
Open listing source

1400 5 AVENUE is a 129-unit building in South Harlem, Manhattan, built in 2003.

1 unit is on the market here right now.

City records show 30 DOB permits and 54 open violations on file.

Units (res)
129
Floors
8.0
Lot ft²
54,918 ft²
Bldg ft²
194,788 ft²
Assessed
$20.7M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1400 5 AVENUE #5L
Manhattan · built 2003
South Harlem$915K$8111,128 ft²2 bd · 2 ba-99
3 HPD-C10 DOBbedbug
17.3Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 19, 2021 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING.
    Nov 29, 2019 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELCTRICAL OUTLET CHILD SAFETY COVER AT NORTH WALL AT PUBLIC HALL, 1st STORY
    Nov 29, 2019 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
    Nov 29, 2019 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Nov 29, 2019 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Nov 16, 2017 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Nov 16, 2017 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX (MISSING) AT LOBBY, 1st STORY
    Feb 13, 2017 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT LOBBY, 1st STORY
    Feb 13, 2017 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT LOBBY, 1st STORY
    Feb 13, 2017 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM (MISSING) AT LOBBY, 1st STORY
    Feb 13, 2017 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT LOBBY, 1st STORY
    Feb 13, 2017 · NOV SENT OUT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILING WITH FIRE RETARDENT MATERIAL AT LOBBY, 1st STORY
    Feb 13, 2017 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT LOBBY, 1st STORY
    Feb 13, 2017 · NOV SENT OUT
  • C
    SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTOMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING ENTRANCE DOOR FORM VESTIBULE DOOR TO 1ST STORY PUBLIC HALL
    Feb 23, 2015 · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT BUILDING ENTRANCE DOOR FROM VESTIBULE TO 1ST STORY PUBLIC HALL
    Feb 23, 2015 · NOV SENT OUT
  • B
    SECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS LOWER LEVE OF DUPLEX APT. IN THE ENTRANCE LOCATED AT APT 7O, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 28, 2008 · #7O · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WATER STAINED AT WEST WALL OF LOWER LEVEL OF DUPLEX APT. IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 7O, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 28, 2008 · #7O · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER STAINED AT FLOOR AT LOWER LEVEL OF DUPLEX APT. IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 7O, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 28, 2008 · #7O · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL AND CEILING IN THE KITCHEN LOCATED AT APT 7R, 7th STORY, 4th APARTMENT FROM WEST AT NORTH
    Nov 12, 2006 · #7R · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 7O, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    May 17, 2006 · #7O · NOV SENT OUT
DOB permits (last 30)
  • OTSep 13, 2016
    NORTH SHORE NEON SIGN C
  • OT-
    D.F. PRAY, INC
  • PL-
    MAXWELL PLUMB MECH. CORP
  • OT-
    DALEY CONSTRUCTION OF AME
  • PL-
    NEW YORK STANDARD MECH CO
  • OT-
    FINIX U.S.A. CONSTRUCTION
  • OT-
    NEW ENGLAND CARPENTRY INC
  • OT-
    DESANTIS CONSTRUCTION COR
  • OT-
    NOEL POMPEY
  • AL-
    1400 FIFTH AVE CONDOMINIUM
  • OT-
    FIRST AVE BUILDERS LLC
  • MH-
    FIRST AVE BUILDERS LLC
  • OT-
    PAUL M. MAINTENANCE INC
  • MH-
    PAUL M. MAINTENANCE INC
  • MH-
    D.F. PRAY, INC
  • BL-
    MAXWELL PLUMB MECH. CORP
  • MH-
    PAUL M MAINTENANCE INC
  • OT-
    PAUL M MAINTENANCE INC
  • OT-
    GOTHAM CONTRACTORS INC
  • OT-
    EVERYDAY MECHANICAL CORP
  • PL-
    EVERYDAY MECHANICAL CORP
  • PL-
    J. BARONE & CO INC
  • PL-
    DYCKMAN PLBG AND HTG INC
  • OT-
    PAUL M MAINTENANCE INC
  • MH-
    PAUL M MAINTENANCE INC
  • OT-
    3584 CONSTRUCTION CORP
  • OT-
    A & Z CONTRACTING
  • OT-
    ACROPOLIS PAINTING & CONSTRUCTIO
  • SD-
    JOHNSON DESIGN CONSULTING
  • PL-
    FRED SMITH P&H CO INC
DOB violations
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 23, 2024LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 3, 2020BENCH-FAILURE TO BENCHMARK NONE
  • May 3, 2020BENCH-FAILURE TO BENCHMARK NONE
  • Oct 20, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • Nov 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 8, 2013AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Aug 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 28, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2008E-ELEVATOR ELEVATORREQUIRED
  • Sep 25, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 25, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2005E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2005E-ELEVATOR ELEVATORREQUIRED

More buildings in South Harlem

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1015997501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Mar 11, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
80 permits in the current corpus · latest record Sep 13, 2016

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
21 violations in the current corpus · latest record Apr 23, 2021

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
33 violations in the current corpus · latest record Nov 14, 2025

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the South Harlem market page.