CurbScoop
CurbScoopBuildingsSouth Harlem3 WEST 122 STREET

3 WEST 122 STREET

Manhattan· South Harlem· built 1901class R4BBL 1017217501
Open listing source

3 WEST 122 STREET is a 24-unit building in South Harlem, Manhattan, built in 1901.

2 units are on the market here right now.

City records show 16 DOB permits and 76 open violations on file.

Units (res)
24
Floors
6.0
Lot ft²
5,046 ft²
Bldg ft²
17,906 ft²
Assessed
$1.38M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
3 WEST 122 STREET #4D
Manhattan · built 1901
South Harlem$675K-0 ft²2 bd · 1 ba-93
33 HPD-C14 DOBbedbug
64.0Source
3 WEST 122 STREET #5C
Manhattan · built 1901
South Harlem$990K$1,100900 ft²2 bd · 1 ba-42
33 HPD-C14 DOBbedbug
64.0Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER SASH WINDOW AT WEST WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 28, 2026 · #4A · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 28, 2026 · #4A · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 28, 2026 · #4A · VIOLATION OPEN
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW UPPER COUNTER BALANCE AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 7, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW UPPER COUNTER BALANCE AT WEST WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 7, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 7, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 7, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE UP SASH GLASS WINDOW IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT LOWER SASH WINDOW AND WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    May 6, 2026 · #4A · NOV SENT OUT
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQUARE FEET AT ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2026 · #4A · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR - THE UNKEYD PLASTER AND PAINT AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW GLASS AT UPPER SASH AT WEST WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT THE WINDOW FRAME AT WEST WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 29, 2026 · #4A · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OF MOLD AT NORTH AND SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 16, 2026 · #4A · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 16, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT SOUTH, EAST AND WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #4A · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WINDOW SASH AT WEST WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #4A · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 7, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 4, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR GLASS PANE AT UPPER WINDOW SASH AT NORTH WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 4, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AND ALL THE WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT WINDOW FRAME AT WEST WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL THE WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2005 HMC: REFIT WINDOW FRAME AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER WINDOW SASH OF WINDOW AT WEST WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 3O SQUARE FEET AT THE CEILING, NORTH WALL, SOUTH WALL, EAST WALL, AND WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 13, 2026 · #4A · NOV SENT OUT
DOB permits (last 30)
  • OT-
    BHA CONSULTANTS LLC
  • FB-
    JACK PICCINI INC
  • BL-
    JACK PICCINI INC
  • OT-
    OVERALL RENOVATION INC
  • OT-
    OVERALL RENOVATION INC
  • OT-
    DAFRO INC
  • OT-
    BHA CONSULTANTS LLC
  • OT-
    OVERALL RENOVATION INC
  • PL-
    NEW YORK MECH PLB SVC COR
  • PL-
    METRO PLMB & HTNG
  • BL-
    DONATO SERINI
  • FB-
    DONATO SERINI
  • OT-
    WALTER GUERRERO
  • PL-
    ROLANDO MECHANICAL CORP
  • MH-
    DAFRO INC
  • OT-
    OHANA RENOVATIONS, INC
DOB violations
  • Mar 21, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Oct 2, 2024C-CONSTRUCTION OTHER OPTIONAL
  • Oct 2, 2024C-CONSTRUCTION OTHER OPTIONAL
  • May 10, 2024C-CONSTRUCTION OTHER OPTIONAL
  • Feb 22, 2024FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Nov 24, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 24, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 11, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 2, 2020BENCH-FAILURE TO BENCHMARK NONE
  • Nov 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Aug 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Nov 2, 2018E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 12, 2016E-ELEVATOR ELEVATORREQUIRED
  • Nov 24, 2015E-ELEVATOR ELEVATORREQUIRED
  • Feb 11, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 31, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 8, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Oct 17, 2013E-ELEVATOR ELEVATORREQUIRED
  • Dec 3, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 7, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 9, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Apr 11, 2005E-ELEVATOR ELEVATORREQUIRED
  • Dec 16, 2002E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2002L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 15, 1990E-ELEVATOR ELEVATORREQUIRED

More buildings in South Harlem

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1017217501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jul 20, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
16 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
187 violations in the current corpus · latest record May 28, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
36 violations in the current corpus · latest record Mar 21, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the South Harlem market page.