CurbScoop
CurbScoop›Buildings›South Harlem›1787 MADISON AVENUE

1787 MADISON AVENUE

Manhattan· South Harlem· built 2003class RMBBL 1016237501
Open listing source

1787 MADISON AVENUE is a 96-unit building in South Harlem, Manhattan, built in 2003.

2 units are on the market here right now.

City records show 30 DOB permits and 25 open violations on file.

Units (res)
96
Floors
8.0
Lot ft²
20,142 ft²
Bldg ft²
121,654 ft²
Assessed
$8.97M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1787 MADISON AVENUE #402
Manhattan · built 2003
South Harlem$600K-0 ft²2 bd · 2 ba-224
bedbugrodent
8.4Source
1787 MADISON AVENUE #202
Manhattan · built 2003
South Harlem$575K-0 ft²2 bd · 2 ba-87
bedbugrodent
8.4Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 16, 2021 · VIOLATION DISMISSED
  • A
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER PENETRATION TO AIR CONDITIONER UNIT SLEEVE IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 202, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 28, 2006 · #202 · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER PENETRATION TO AIR CONDITIONER UNIT SLEEVE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 202, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 28, 2006 · #202 · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS .. IN THE 1st BATHROOM FROM NORTH AT EAST LOCATED AT APT 202, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 23, 2004 · #202 · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 202, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 23, 2004 · #202 · NOV SENT OUT
  • A
    SECTION 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT LOBBY, 1st STORY
    Jul 23, 2004 · NOV SENT OUT
DOB permits (last 30)
  • Sidewalk ShedMay 9, 2025
    ANDAMIO SCAFFOLDING LLC
  • Suspended ScaffoldMay 5, 2025
    C.C.C. RENOVATION INC
  • General ConstructionApr 8, 2025
    POFI CONSTRUCTION CORP
  • General ConstructionApr 18, 2023
    JADE CONTRACTING CORP
  • SignOct 18, 2022
    SERVICE SIGN ERECTORS CO
  • Mechanical SystemsNov 30, 2021
    DHI CONSTRUCTION SVCS INC
  • General ConstructionOct 14, 2021
    DHI CONSTRUCTION SVCS
  • General ConstructionJun 4, 2021
    DHI CONSTRUCTION SVCS
  • Mechanical SystemsJun 1, 2021
    DHI CONSTRUCTION SVCS
  • SprinklersJun 1, 2021
    ARIANA CONTRACTING INC
  • PlumbingJun 1, 2021
    COPPER PLUMBING INC
  • SprinklersJun 1, 2021
    ARIANA CONTRACTING INC
  • SP-
    KYPROS MECHANICAL CORP
  • PL-
    MAXWELL PLUMB MECH. CORP
  • BL-
    MAXWELL PLUMB MECH. CORP
  • OT-
    AMERICAN RESIDENTIAL CON*
  • PL-
    MAXWELL PLUMB MECH. CORP
  • OT-
    L&M BUILDERS GROUP LLC
  • OT-
    HSU BROTHERS CONSTTRUCTIO
  • PL-
    ORION PLUMBING & HTG CORP
  • SP-
    ORION PLUMBING & HTG CORP
  • OT-
    BSD CORP. KINGS
  • OT-
    M-USA CONSTRUCTION CORP
  • OT-
    JMMC LLC
  • SP-
    KORDUN CONSTRUCTION CORP
  • MH-
    L&M BUILDERS GROUP LLC
  • EQ-
    SPRING SCAFFOLDING LLC
  • AL-
    KORDUN CONSTRUCTION CORP
  • PL-
    KORDUN CONSTRUCTION CORP
  • OT-
    CANIDO BASONAS CONSTRUCTI
DOB violations
  • Sep 16, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2012E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2009E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 14, 2006E-ELEVATOR ELEVATORREQUIRED
  • Sep 14, 2006E-ELEVATOR ELEVATORREQUIRED

More buildings in South Harlem

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 4, 2026

Stable property ID: nyc:bbl:1016237501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Apr 24, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 4, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
37 permits in the current corpus · latest record May 20, 2025

Pipeline completed Oct 4, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
6 violations in the current corpus · latest record Apr 23, 2021

Pipeline completed Oct 4, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
19 violations in the current corpus · latest record Dec 4, 2020

Pipeline completed Oct 4, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the South Harlem market page.