CurbScoop
CurbScoopBuildingsUpper East Side1438 3 AVENUE

1438 3 AVENUE

Manhattan· Upper East Side· built 1985class RMBBL 1015107501
Open listing source

1438 3 AVENUE is a 92-unit building in Upper East Side, Manhattan, built in 1985.

1 unit is on the market here right now.

City records show 30 DOB permits and 37 open violations on file.

Units (res)
92
Floors
31.0
Lot ft²
7,607 ft²
Bldg ft²
137,006 ft²
Assessed
$23.4M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1438 THIRD AVENUE #22A
Manhattan · built 1985
Upper East Side$1.35M$1,751771 ft²1 bd · 1 ba-49
3 HPD-C6 DOBbedbug
13.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 7E, 7th STORY
    Jun 7, 2019 · #7E · VIOLATION CLOSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 7, 2019 · #7E · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 28D, 28th STORY, 2nd APARTMENT FROM NORTH AT EAST
    May 3, 2007 · #28D · NOV CERTIFIED LATE
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED MORTARJOINT AT LINTIL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 30C, 30th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 29, 2001 · #30C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF A CONCEALED WATER LEAK AT CEILING. IN THE 2nd ROOM FROM EAST LOCATED AT APT 30C, 30th STORY
    Nov 17, 2000 · #30C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTER JOINT AND RECAULK OVER 30th STY WINDOW AT LINTEL EXTERIOR WALL. , 30th STORY
    Nov 17, 2000 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 30C, 30th STORY, APARTMENT AT EAST
    Nov 17, 2000 · #30C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING AND WALL. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 30C, 30th STORY, APARTMENT AT EAST
    Nov 17, 2000 · #30C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR UNDER KITCHEN SINK CABINET 2 STY NORTHWEST APT 2B. , SECTION '' ''
    Jun 8, 1999 · #2B · NOV SENT OUT
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS 2 STY NORTHWEST APT 2B ENTRANCE. , SECTION '' ''
    Jun 8, 1999 · #2B · NOV SENT OUT
  • B
    § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE & ROACHES 2 STY NORTHWEST APT 2B. , SECTION '' ''
    Jun 8, 1999 · #2B · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTHWEST CORNER OF WEST WALL 2 STY NORTHWEST APT 2B WEST ROOM. , SECTION '' ''
    Jun 8, 1999 · #2B · NOV SENT OUT
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM CELLAR DOOR LOCKED.
    May 5, 1999 · NOV CERTIFIED LATE
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS EXIT NORTH FIRE DOOR 22 STY PUBLIC HALL.
    May 5, 1999 · NOV CERTIFIED LATE
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS BULKHEAD DOOR TO ROOF.
    May 5, 1999 · NOV CERTIFIED LATE
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WATER DAMAGE CEILING FRONT NORTHEAST ROOM FRONT NORTH APT 8D. , SECTION '' ''
    Feb 9, 1990 · #8D · NOV SENT OUT
  • B
    D26-19.07 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING NIGHT INSPECTION LIGHTS NOT ON.
    Apr 23, 1987 · NOV SENT OUT
DOB permits (last 30)
  • OT-
    MILLENIUM RESTORATION COR
  • PL-
    NAT'L MECH. SVCS PLBG LLC
  • AL-
    ASA BUILDING MAINT INC
  • OT-
    FOUNDATIONS INTERIOR DESI
  • EQ-
    EMPIRE SCAFFOLDING SYSTEM
  • OT-
    FOUNDATIONS INTERIOR DESI
  • FB-
    C C CONTROLLED COMBUSTION
  • BL-
    C C CONTROLLED COMBUSTION
  • MH-
    G.A.M.C.N.Y. LLC
  • PL-
    REAL PLUMBING CORP
  • PL-
    NAT'L MECH. SVCS PLBG LLC
  • OT-
    PICO RENOVATIONS INC
  • EQ-
    S&E BRIDGE & SCAFFOLD LLC
  • PL-
    D.H. EAGLE PLUMBING, LLC
  • OT-
    AM&G WATERPROOFING LLC
  • PL-
    WF PLUMBING AND HEATING L
  • PL-
    REAL PLUMBING CORP
  • EQ-
    S&E BRIDGE & SCAFFOLD LLC
  • OT-
    PCCM MANAGEMENT CORP
  • PL-
    D.H. EAGLE PLUMBING, LLC
  • PL-
    REAL PLUMBING CORP
  • OT-
    SLG CONTRACTING CORP
  • PL-
    PETER PLUMBING ASSOC. INC
  • PL-
    HERTLER NADILE P & H, INC
  • OT-
    MILLENIUM RESTORATION COR
  • MH-
    FOUNDATIONS INTERIOR DESI
  • OT-
    MAJOR RENOVATION MGMT INC
  • OT-
    MAJOR RENOVATION MGMT INC
  • OT-
    PCCM MANAGEMENT CORP
  • OT-
    AM&G WATERPROOFING LLC
DOB violations
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 2, 2018E-ELEVATOR ELEVATORREQUIRED
  • Sep 18, 2017E-ELEVATOR ELEVATORREQUIRED
  • Sep 18, 2017E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Aug 17, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 17, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 2008E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Upper East Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 10, 2026

Stable property ID: nyc:bbl:1015107501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 23, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 10, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
54 permits in the current corpus

Pipeline completed Sep 10, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
17 violations in the current corpus · latest record Jan 24, 2025

Pipeline completed Sep 10, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
20 violations in the current corpus · latest record Mar 22, 2023

Pipeline completed Sep 10, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper East Side market page.