CurbScoop
CurbScoopBuildingsUpper East Side179 EAST 79 STREET

179 EAST 79 STREET

Manhattan· Upper East Side· built 1928class D4BBL 1015080031
Open listing source

179 EAST 79 STREET is a 59-unit building in Upper East Side, Manhattan, built in 1928.

3 units are on the market here right now.

City records show 30 DOB permits and 50 open violations on file.

Units (res)
59
Floors
15.0
Lot ft²
6,345 ft²
Bldg ft²
61,300 ft²
Assessed
$7.68M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
179 EAST 79 STREET #11B
Manhattan · built 1928
Upper East Side$899K-0 ft²1 bd · 1 ba-189
3 HPD-C5 DOBbedbug
13.2Source
179 EAST 79 STREET #4C
Manhattan · built 1928
Upper East Side$1.25M-0 ft²2 bd · 2 ba-55
3 HPD-C5 DOBbedbug
13.2Source
179 EAST 79 STREET #11C
Manhattan · built 1928
Upper East Side$850K-0 ft²1 bd · 1 ba-34
3 HPD-C5 DOBbedbug
13.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING
    Aug 6, 2018 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Aug 6, 2018 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING.
    Aug 6, 2018 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Aug 6, 2018 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER.
    Aug 6, 2018 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Aug 6, 2018 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING
    Aug 6, 2018 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
    Aug 6, 2018 · NOV SENT OUT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 1, 2018 · #5C · VIOLATION CLOSED
  • C
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF NO ELECTRICITY SUPPLY THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 16A, 16th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 25, 2011 · #16A · NOV SENT OUT
  • C
    SECTION 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER
    Aug 23, 2011 · #14AB · NOV SENT OUT
  • B
    SECTION 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 2ND STY SOUTHWEST CLASS A APT 2A USED AS A PSYCHIATRISTS OFFICE. , SECTION '' ''
    May 19, 1983 · #2A · NOV SENT OUT
DOB permits (last 30)
  • OTJan 14, 2020
    ZOOM CONTRACTING INC
  • EQAug 2, 1991
    COLGATE SCAFFOLDING
  • OT-
    HAMILTON AIR COMPANY, INC
  • OT-
    TITAN RESTORATION INC
  • MH-
    TITAN RESTORATION INC
  • PL-
    ROLANDO MECHANICAL CORP
  • MH-
    PRIME HOME RENOVATIONS C
  • OT-
    ZOOM CONTRACTING INC
  • OT-
    HAMILTON AIR COMPANY, INC
  • MH-
    HAMILTON AIR COMPANY, INC
  • OT-
    STANDARD WATERPROOFING C
  • PL-
    NICE PLUMBING CORP
  • PL-
    GOLDS PLBNG & HTG CO.INC
  • OT-
    ZOOM CONTRACTING INC
  • OT-
    GARRETSON CUSTOM BUILDERS
  • OT-
    PRIME HOME RENOVATIONS C
  • OT-
    STANDARD WATERPROOFING CORP
  • OT-
    ZOOM CONTRACTING INC
  • MH-
    ZOOM CONTRACTING INC
  • OT-
    LIEBHABER CONSTRUCTION
  • OT-
    KITCHENFACTORY.COM INC
  • EQ-
    PERIMETER BRIDGE & SCAFFOLD
  • OT-
    TITAN RESTORATION INC
  • MH-
    TITAN RESTORATION INC
  • OT-
    ROBERT ELEVATOR CO.
  • OT-
    PROFILE CONTRACTING INC
  • MH-
    PROFILE CONTRACTING INC
  • PL-
    GO PRO PLBNG AND HTG CO I
  • OT-
    KITCHENFACTORY.COM INC
  • MH-
    HAMILTON AIR COMPANY, INC
DOB violations
  • Jun 23, 2024EARCX-FAILURE TO SUBMIT EER NONE
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Aug 21, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Aug 20, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 29, 2020EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 29, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 29, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 20, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2013BENCH-FAILURE TO BENCHMARK NONE
  • Oct 3, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Jan 1, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Aug 18, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 18, 2011E-ELEVATOR ELEVATORREQUIRED
  • Mar 17, 2010E-ELEVATOR ELEVATORREQUIRED
  • Nov 11, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 11, 2009E-ELEVATOR ELEVATORREQUIRED
  • Dec 30, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 30, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 28, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 28, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 2, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jan 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2003E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2003E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2002E-ELEVATOR ELEVATORREQUIRED
  • Mar 26, 2001E-ELEVATOR ELEVATORREQUIRED
  • Apr 14, 2000E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 30, 1991C-CONSTRUCTION OTHER OPTIONAL
  • Mar 7, 1990E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper East Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:1015080031

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jul 28, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
80 permits in the current corpus · latest record Jan 14, 2020

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
12 violations in the current corpus · latest record Aug 8, 2018

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
38 violations in the current corpus · latest record Jun 23, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper East Side market page.