CurbScoop
CurbScoopBuildings23 EAST 74 STREET

23 EAST 74 STREET

Manhattan· built 1925class RMBBL 1013897501
Open listing source

23 EAST 74 STREET is an 83-unit building in Manhattan, built in 1925.

2 units are on the market here right now.

City records show 30 DOB permits and 47 open violations on file.

Units (res)
83
Floors
16.0
Lot ft²
7,151 ft²
Bldg ft²
91,399 ft²
Assessed
$15.0M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
23 EAST 74 STREET #4AF
Manhattan · built 1925
-$3.00M$1,9191,563 ft²2 bd · 2 ba-24
3 DOBbedbug
7.8Source
23 EAST 74 STREET #4A
Manhattan · built 1925
-$1.45M-0 ft²1 bd · 1 ba-25
3 DOBbedbug
7.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
    Apr 19, 2023 · NOV CERTIFIED LATE
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Apr 19, 2023 · NOV CERTIFIED LATE
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Apr 19, 2023 · NOV CERTIFIED LATE
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Apr 19, 2023 · NOV CERTIFIED LATE
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Apr 19, 2023 · NOV CERTIFIED LATE
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 2, 2022 · VIOLATION DISMISSED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 25, 2016 · VIOLATION DISMISSED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 1, 2015 · VIOLATION DISMISSED
  • B
    SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, APARTMENT AT EAST
    Nov 10, 2008 · #3B · NOV SENT OUT
  • B
    SECTION 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF GARBAGE CANS ON ALL STORIES PUBLIC HALL AT PUBLIC HALL STAIRS, SECTION AT NORTH
    Oct 3, 2005 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 12D, 12th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 12, 2004 · #12D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 12D, 12th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jul 12, 2004 · #12D · VIOLATION CLOSED
DOB permits (last 30)
  • OTSep 13, 2012
    3-RT'S GENERAL CONTRACTOR
  • OTApr 3, 2002
    JOYCE CONTRACTING
  • ALJul 25, 1990
    EYRIS PRODUCTION INC
  • OT-
    FINE CONSTRUCTION SERVICE
  • PL-
    JACK LICHTENBERGER AND CO,INC.
  • PL-
    IMPACT PLUMBING INC
  • MH-
    EDWARD BENNET CONST. INC
  • OT-
    KS RENOVATION GROUP INC
  • MH-
    KS RENOVATION GROUP INC
  • EQ-
    ROCKLEDGE SCAFFOLD
  • PL-
    HK MECHANICAL SERV CORP
  • PL-
    GOLDS PLUMBING CORP
  • FP-
    MASTER FIRE PREVENTION SYSTEMS
  • PL-
    FRED SMITH P&H CO INC
  • OT-
    T&D CABINETRY
  • OT-
    BREND RENOVATION CORP
  • MH-
    T&D CABINETRY
  • AL-
    LOWER EAST REDEVELOPMENT
  • OT-
    LTI CONSTRUCTION
  • OT-
    BREND RENOVATION CORP
  • PL-
    LMP PLBG & HTG CORP
  • OT-
    LOWER EAST REDEVELOPMENT INC
  • MH-
    AMERICAN KITCHEN ASSOCIATES
  • OT-
    HITE CONSTRUCTION INC
  • OT-
    METRO RENOVATIONS INC
  • PL-
    UNIC CO INC
  • OT-
    DARTOM CONSTRUCTION LLC
  • OT-
    DARTOM CONSTRUCTION LLC
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    KS RENOVATION GROUP INC
DOB violations
  • Apr 1, 2026C-CONSTRUCTION OTHER OPTIONAL
  • Sep 23, 2024LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 23, 2024LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 15, 2024C-CONSTRUCTION OTHER OPTIONAL
  • Sep 21, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 21, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Aug 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 5, 2013E-ELEVATOR ELEVATORREQUIRED
  • Dec 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 30, 2009LANDMK-LANDMARK NONE
  • Sep 30, 2009LANDMK-LANDMARK NONE
  • Sep 30, 2009LANDMK-LANDMARK NONE
  • Sep 30, 2009LANDMK-LANDMARK NONE
  • Sep 5, 2008E-ELEVATOR ELEVATORREQUIRED
  • Sep 5, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2008C-CONSTRUCTION OTHER OPTIONAL
  • Aug 3, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 23, 2005E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2002L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Feb 11, 2000LANDMK-LANDMARK NONE
  • Aug 30, 1999LANDMK-LANDMARK NONE
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 26, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:1013897501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Aug 8, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
168 permits in the current corpus · latest record Sep 26, 2012

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
12 violations in the current corpus · latest record Aug 16, 2023

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
35 violations in the current corpus · latest record Apr 1, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.