CurbScoop
CurbScoopBuildingsLenox Hill930 5 AVENUE

930 5 AVENUE

Manhattan· Lenox Hill· built 1940class D4BBL 1013890001
Open listing source

930 5 AVENUE is a 140-unit building in Lenox Hill, Manhattan, built in 1940.

4 units are on the market here right now.

City records show 30 DOB permits and 44 open violations on file.

Units (res)
140
Floors
20.0
Lot ft²
15,325 ft²
Bldg ft²
220,003 ft²
Assessed
$34.9M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
930 5 AVENUE #18A
Manhattan · built 1940
Lenox Hill$7.90M-0 ft²2 bd · 2 ba-112
21 DOBbedbug
16.7Source
930 5 AVENUE #7G
Manhattan · built 1940
Lenox Hill$999K$1,110900 ft²1 bd · 1 ba-498
21 DOBbedbug
16.7Source
930 5 AVENUE #8F
Manhattan · built 1940
Lenox Hill$2.50M-0 ft²2 bd · 2 ba-129
21 DOBbedbug
16.7Source
930 5 AVENUE #11A
Manhattan · built 1940
Lenox Hill$6.25M-0 ft²2 bd · 2 ba-126
21 DOBbedbug
16.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 15, 2023 · VIOLATION DISMISSED
  • B
    § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 7, 2008 · #3D · VIOLATION CLOSED
  • B
    § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 7, 2008 · #3D · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE RADIATOR AT WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Feb 13, 2008 · #3C · VIOLATION CLOSED
DOB permits (last 30)
  • MHAug 5, 2015
    C.N. RENOVATION CO., INC
  • OTSep 27, 2006
    ARDUINI CONTRACTING CORP
  • PLJan 28, 2002
    ZEFI PLUMB HEAT INC.
  • OTDec 21, 2001
    ASA BUILDING MAINTENANCE
  • OTAug 23, 2000
    LINDEN MARSHALL CONT. INC.
  • OTJun 6, 2000
    TECTONIX INC
  • OTMay 30, 2000
    ACM ENGINEERING
  • PLDec 16, 1996
    ARIANA CONTRACTING INC.
  • OTNov 4, 1996
    TD CABINETRY,INC.
  • PLApr 2, 1996
    ARIANA CONTRACTING INC
  • MHMar 13, 1996
    DORIC CONSTRUCTION GROUP INC
  • OTOct 26, 1992
    HERBERT CONSTRUCTION CO. INC.
  • PLJun 23, 1992
    ALRIGHT PLUMBING & HEATING
  • PLJan 10, 1991
    PREMIER PLUMBING 7 HEATING INC
  • OT-
    MASTEY CONSTRUCTION INC
  • OT-
    J & A INTERIORS INC
  • PL-
    PREMIER PLUMBING 7 HEATING INC
  • PL-
    S.O.S. PLBG & HTG LTD
  • MH-
    KILLOWEN CONSTRUCTION IN
  • PL-
    DONATO INC
  • MH-
    ZALE CONTRACTING
  • MH-
    GEORGE & JERZY CONTRACTING CORP
  • PL-
    SANITARY P&H CORP
  • OT-
    INTERIOR ALTERATIONS INC
  • OT-
    LARSON CONST. CORP
  • PL-
    ZEFI PLUMB HEAT INC.
  • PL-
    M & A PLBG
  • PL-
    ARIANA CONTRACTING INC
  • MH-
    TEAMWORK CONT RESOURCES CORP
  • OT-
    GEORGE & JERZY CONTRACTING CORP
DOB violations
  • Jul 27, 2022IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
  • Jul 26, 2022C-CONSTRUCTION OTHER OPTIONAL
  • Jul 26, 2022C-CONSTRUCTION OTHER OPTIONAL
  • Jul 26, 2022C-CONSTRUCTION OTHER OPTIONAL
  • Jul 25, 2022C-CONSTRUCTION OTHER OPTIONAL
  • Sep 29, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 29, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 29, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 29, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 2, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2018E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2017E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 2, 2008E-ELEVATOR ELEVATORREQUIRED
  • Sep 2, 2008E-ELEVATOR ELEVATORREQUIRED
  • Sep 2, 2008E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1013890001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record May 11, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
415 permits in the current corpus · latest record Aug 5, 2015

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
4 violations in the current corpus · latest record Mar 20, 2023

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
71 violations in the current corpus · latest record Apr 17, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.