CurbScoop
CurbScoopBuildingsMidtown58 WEST 58 STREET

58 WEST 58 STREET

Manhattan· Midtown· built 1969class RMBBL 1012737501
Open listing source

58 WEST 58 STREET is a 168-unit building in Midtown, Manhattan, built in 1969.

2 units are on the market here right now.

City records show 30 DOB permits and 75 open violations on file.

Units (res)
168
Floors
33.0
Lot ft²
17,029 ft²
Bldg ft²
198,816 ft²
Assessed
$31.1M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
58 WEST 58 STREET #24B
Manhattan · built 1969
Midtown$1.13M$1,492754 ft²1 bd · 1 ba-430
6 HPD-C14 DOBbedbug
24.1Source
58 WEST 58 STREET #7C
Manhattan · built 1969
Midtown$1.73M$1,1791,463 ft²2 bd · 2 ba-48
6 HPD-C14 DOBbedbug
24.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQUARE FEET AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16294584 ISSUED 08-OCT-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Oct 8, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 8, 2023 · #2C · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQUARE FEET AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 8, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 8, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE FOYER LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 8, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 8, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 8, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 8, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST AND WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 1, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 1, 2023 · #2C · VIOLATION CLOSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Oct 1, 2023 · #2C · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 9F, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 30, 2023 · #9F · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH AND EAST WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 9F, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 30, 2023 · #9F · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 9F, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 30, 2023 · #9F · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 9F, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 30, 2023 · #9F · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION CABINET AT EAST WALL IN THE BATHROOM LOCATED AT APT 9F, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 30, 2023 · #9F · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH AND WEST WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 9F, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 30, 2023 · #9F · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE SINK CABINET IN THE KITCHEN LOCATED AT APT 9F, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 30, 2023 · #9F · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2023 · #2C · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REFIT WEST CASEMENT WINDOW IN THE PRIVATE HALLWAY LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2023 · #2C · VIOLATION DISMISSED
  • B
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE PIPE AT WASH BASIN IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2023 · #2C · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL UNDERNEATH SINK IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2023 · #2C · VIOLATION DISMISSED
  • B
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE PIPE AT BATHTUB IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2023 · #2C · VIOLATION CLOSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 33C, 33rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 27, 2022 · #33C · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 33C, 33rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 27, 2022 · #33C · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM, 1st STORY
    Dec 27, 2022 · VIOLATION CLOSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 21, 2022 · #2C · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCK AT BOILER ROOM
    Dec 21, 2022 · VIOLATION CLOSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 10, 2018 · VIOLATION DISMISSED
  • A
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF A WATER LEAK AT THE EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 33B, 33rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 23, 2010 · #33B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 33B, 33rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 23, 2010 · #33B · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF A WATER LEAK AT THE EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 33B, 33rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 23, 2010 · #33B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 33B, 33rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 23, 2010 · #33B · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 33B, 33rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 23, 2010 · #33B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 33B, 33rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 23, 2010 · #33B · NOV SENT OUT
DOB permits (last 30)
  • OT-
  • EQ-
    INTERSYSTEM CORP
  • OT-
    ZOOM CONTRACTING
  • PL-
    S.O.S PLUMBING & HEATING LTD
  • AL-
    CANIFIELD CONSTRUCTION
  • PL-
    GREGG NY PLUMBING, INC
  • OT-
    KING CONSTRUCTION GP LLC
  • OT-
    MID-STATE CONSTRUCTION C
  • OT-
    WACHTEL MECHANICAL SERVICES INC
  • OT-
    SUPER RIP DEMOLITION
  • EQ-
    CITY SCAFFOLDING
  • OT-
    CANFIELD CONSTRUCTION
  • OT-
    AMSTERDAM RESTORATION COR
  • OT-
    MINCH CONSTRCTION CORP
  • OT-
    EQUITY DEVELOMENT & CONSTRUCTION
  • MH-
    EQUITY DEVELOMENT & CONSTRUCTION
  • PL-
    KYPROS MECHANICAL CORP
  • MH-
    ERS SYSTEMS INC
  • OT-
    MID-STATE CONSTRUCTION C
  • OT-
    KAY WATERPROOFING
  • OT-
    ENVIROCHROME INTERIORS INC
  • OT-
    CANFIELD CONSTRUCTION COR
  • OT-
    INTREPID ELECTRICAL
  • OT-
    DEBONO BROS. BUILDERS & *
  • OT-
    BAKER INTERIORS INC
  • EQ-
    CITY SCAFFOLDING
  • EQ-
    J&C RESTORATION CORP
  • OT-
    PLN CONTRACTING INC
  • EQ-
    ROCKLEDGE SCAFFOLD
  • PL-
    GREGG NY PLUMBING
DOB violations
  • Nov 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Dec 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 2019E-ELEVATOR ELEVATORREQUIRED
  • Dec 27, 2018E-ELEVATOR ELEVATORREQUIRED
  • Dec 27, 2018E-ELEVATOR ELEVATORREQUIRED
  • Dec 27, 2018E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 13, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 13, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 6, 2018FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Apr 3, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Mar 19, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Oct 31, 2017E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2017E-ELEVATOR ELEVATORREQUIRED
  • Oct 17, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 17, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Dec 8, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 8, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 22, 2012AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 22, 2012AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 10, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 10, 2012E-ELEVATOR ELEVATORREQUIRED
  • Apr 4, 2012AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 4, 2012AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 16, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 22, 2010E-ELEVATOR ELEVATORREQUIRED

More buildings in Midtown

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1012737501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Apr 22, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
105 permits in the current corpus

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
35 violations in the current corpus · latest record Mar 31, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
63 violations in the current corpus · latest record Jun 6, 2023

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Midtown market page.