CurbScoop
CurbScoopBuildings340 WEST 86 STREET

340 WEST 86 STREET

Manhattan· built 1909class R4BBL 1012477501
Open listing source

340 WEST 86 STREET is a 70-unit building in Manhattan, built in 1909.

1 unit is on the market here right now.

City records show 30 DOB permits and 66 open violations on file.

Units (res)
70
Floors
12.0
Lot ft²
10,217 ft²
Bldg ft²
70,781 ft²
Assessed
$10.9M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
340 WEST 86 STREET #5A
Manhattan · built 1909
-$1.40M$8911,571 ft²3 bd · 1 ba-25
14 HPD-C5 DOBbedbug
29.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AND WOOD WORK IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION DOOR IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 5th ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 25, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT SHUT OFF VALVE, NORTH WALL IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 14, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 14, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH IN THE PRIVATE HALLWAY LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 14, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT WINDOW IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 14, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 14, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 14, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 14, 2021 · #6A · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 14, 2021 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Jun 20, 2019 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 7; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, NORTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW FIRST FROM NORTH AT EAST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER SASH WINDOW 2 ND FROM SOUTH AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 14, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE BATHROOM LOCATED AT APT 12E, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 3, 2019 · #12E · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 12E, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 3, 2019 · #12E · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORY
    Apr 3, 2019 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCHUTCHEON PLATES AT HEAT RISER AT CEILING IN THE BATHROOM LOCATED AT APT 12E, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 3, 2019 · #12E · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ALL WALL AND CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 12E, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 3, 2019 · #12E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVERS/CAPS AT ELECTRICAL OUTLET AT EAST AND WEST WALL AT PUBLIC HALL, 1st STORY
    Apr 3, 2019 · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Apr 3, 2019 · VIOLATION DISMISSED
DOB permits (last 30)
  • PLMar 22, 2004
    SYSTNES 2000 PLUMB SERV
  • OTMar 16, 2004
    KNG CONSTR. CO INC.
  • ALSep 6, 1995
    ZMK GROUP,INC.
  • PL-
    ARANDA PLBG & HTG CORP
  • OT-
    A & M WARSHAW PLUMBING &
  • OT-
    CONELLE CONSTRUCTION CORP
  • OT-
    K RAY ROMANO GENERAL CONTRACTOR
  • PL-
    STANLEY LEWIS CONTRACTING CORP
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    CONELLE CONSTRUCTION CORP
  • MH-
    ROMANOV INC
  • PL-
    A & M WARSHAW PLBG & HTG
  • PL-
    VALLEY CONSTRUCTION SVCS
  • PL-
    NY PLUMBING & HEATING COR
  • OT-
    ARTISAN PRESERVATION LLC
  • MH-
    LU/SHEBA CONTRACTING
  • OT-
    CONELLE CONSTRUCTION CORP
  • OT-
    C C CONTROLLED COMBUSTION
  • FB-
    C C CONTROLLED COMBUSTION
  • FS-
    C C CONTROLLED COMBUSTION
  • PL-
    CC CONTROLLED PLBG CO INC
  • OT-
    STANDARD WATERPROOFING CORP
  • MH-
    STANDARD WATERPROOFING CORP
  • MH-
    STANDARD WATERPROOFING RP
  • OT-
    KNG CONSTR. CO INC.
  • EQ-
    TOWER BUILDING RESTORATION
  • OT-
    LARSON'S CONSTRUCTION CORP.
  • PL-
    SYSTNES 2000 PLUMB SERV
  • OT-
    STANDARD WATERPROOFING RP
  • OT-
    DURGUN HOME IMPROVEMENTS
DOB violations
  • Aug 14, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Jan 26, 2024FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Nov 22, 2023AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 18, 2023C-CONSTRUCTION OTHER OPTIONAL
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Jun 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 27, 2018EARCX-FAILURE TO SUBMIT EER NONE
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jul 1, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 26, 2007E-ELEVATOR ELEVATORREQUIRED
  • Dec 26, 2007E-ELEVATOR ELEVATORREQUIRED
  • May 24, 2006E-ELEVATOR ELEVATORREQUIRED
  • Oct 7, 2004E-ELEVATOR ELEVATORREQUIRED
  • Oct 7, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2003E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2003E-ELEVATOR ELEVATORREQUIRED

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1012477501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Aug 6, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
84 permits in the current corpus · latest record Apr 5, 2004

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
91 violations in the current corpus · latest record Jan 4, 2023

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
26 violations in the current corpus · latest record Aug 14, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.