CurbScoop
DealsManhattan560 10 AVENUE

560 10 AVENUE

Manhattan· Hell's Kitchen· built 2008class RMBBL 1010517502
Units (res)
814
Floors
59.0
Lot ft²
54,647 ft²
Bldg ft²
1,003,752 ft²
Assessed
$201.4M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
460 WEST 42 STREET #PH1J
Manhattan · built 2008
Hell's Kitchen$2.99M$2,4961,198 ft²2 bd · 2 ba-96
5 HPD-Cbedbug
19.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 17, 2025 · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 39C, 39th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 28, 2024 · #39C · VIOLATION CLOSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 39C, 39th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 26, 2024 · #39C · VIOLATION CLOSED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 31B, 31st STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 16, 2023 · #31B · VIOLATION DISMISSED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 31B, 31st STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 16, 2023 · #31B · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND THE BATHTUB IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 4, 2020 · #22J · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND THE COUNTERTOP AT SINK IN THE KITCHEN LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 4, 2020 · #22J · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 4, 2020 · #22J · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING UNDER THE KITCHEN SINK LIP IN THE KITCHEN LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    May 18, 2020 · #22J · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND THE BATHTUB IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    May 18, 2020 · #22J · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT ALL WALLS AROUND BATHTUB IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 22J, 22nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Mar 23, 2020 · #22J · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 22J, 22nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Mar 23, 2020 · #22J · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT BASE CABINET AT SINK IN THE KITCHENETTE LOCATED AT APT 22J, 22nd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Mar 23, 2020 · #22J · DEFECT LETTER ISSUED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX(1 SQ FT)AT NORTH WALL INSIDE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM SOUTH AT WEST
    Aug 27, 2019 · #22J · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULK/ SILICONE AT BASE OF BATHTUB AT FLOOR IN THE BATHROOM LOCATED AT APT 22J, 21st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Aug 8, 2019 · #22J · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE MECHANICAL VENTILATION COVER IN THE KITCHEN LOCATED AT APT 22J, 21st STORY, 4th APARTMENT FROM EAST AT SOUTH
    Aug 8, 2019 · #22J · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL UNDERNEATH SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 22J, 22nd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Jul 18, 2019 · #22J · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 22J, 22nd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Jul 18, 2019 · #22J · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CABINET AT WASH/BASIN IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Jul 18, 2019 · #22J · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH AND WEST WALLS IN THE KITCHEN LOCATED AT APT 22J, 22nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
    Jul 9, 2019 · #22J · VIOLATION CLOSED
  • B
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF VERMIN SILVERFISH IN THE ENTIRE APARTMENT LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 26, 2019 · #22J · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 26, 2019 · #22J · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE BASE CABINET AT WASH/BASIN IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 26, 2019 · #22J · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 26, 2019 · #22J · VIOLATION CLOSED
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE THE MILDEW ON TILES AT NORTH AND EAST WALLS IN SHOWER IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 26, 2019 · #22J · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTER TOP AT SINK BASE IN THE KITCHEN LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 26, 2019 · #22J · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 13142850 ISSUED 26-JUN-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Jun 26, 2019 · #22J · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE BATHROOM LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 26, 2019 · #22J · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE AT CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 22J, 22nd STORY, 5th APARTMENT FROM EAST AT SOUTH
    Jun 26, 2019 · #22J · VIOLATION CLOSED
  • B
    § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 31B, 31st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
    Jun 12, 2017 · #31B · VIOLATION DISMISSED
DOB permits (last 30)
  • SGAug 3, 2016
    FIVE TOWN NEON SIGN CO IN
  • MHMar 12, 2013
    DALCRO INTERIORS, INC
  • MH-
    POWERGEN DEVELOPMENT GROU
  • PL-
    A. M. PLUMBING COMPANY
  • OT-
    FIVE STAR AWNINGS INC
  • OT-
    LEGACY BUILDERS/DEVELOPER
  • OT-
    LEGACY BUILDERS/DEVELOPER
  • MH-
    ANCOR INC
  • OT-
    BRADY CONSTRUCTION INC
  • PL-
    JAG PLBG & MECH INC
  • EQ-
    BRADY CONSTRUCTION INC
  • OT-
    BRADY CONSTRUCTION INC
  • OT-
    HOME IMPROVEMENT CONSTRUC
  • SP-
    V. BARILE, INC
  • OT-
    ANCOR INC
  • MH-
    LEGACY BUILDERS/DEVELOPER
  • OT-
    WADE RAY & ASSOC CONST IN
  • MH-
    WADE RAY & ASSOC CONST IN
  • SP-
    LANDO & ASSOCIATES, INC
  • OT-
    DALCRO INTERIORS, INC
  • MH-
    DALCRO INTERIORS, INC
  • OT-
    CDC HOUSING INC
  • OT-
    CDC HOUSING INC
  • MH-
    CDC HOUSING INC
  • OT-
    LEGACY BUILDERS/DEVELOPER
  • PL-
    AMC PLBG, HTG & CLNG, INC
  • OT-
    BRADY CONSTRUCTION INC
  • PL-
    ACCURATE PLBG & HTG CORP
  • SP-
    CAPITOL FIRE SPRINKLER CO
  • PL-
    AMC PLBG, HTG & CLNG, INC