CurbScoop
CurbScoopBuildingsHell's Kitchen357 WEST 55 STREET

357 WEST 55 STREET

Manhattan· Hell's Kitchen· built 1935class D4BBL 1010460001
Open listing source

357 WEST 55 STREET is a 72-unit building in Hell's Kitchen, Manhattan, built in 1935.

4 units are on the market here right now.

City records show 30 DOB permits and 51 open violations on file.

Units (res)
72
Floors
6.0
Lot ft²
16,825 ft²
Bldg ft²
70,507 ft²
Assessed
$9.59M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
357 WEST 55 STREET #6M
Manhattan · built 1935
Hell's Kitchen$830K-0 ft²1 bd · 1 ba-23
2 HPD-C8 DOBbedbug
14.1Source
357 WEST 55 STREET #4B
Manhattan · built 1935
Hell's Kitchen$825K$8141,013 ft²1 bd · 1 ba-44
2 HPD-C8 DOBbedbug
14.1Source
357 WEST 55 STREET #2H
Manhattan · built 1935
Hell's Kitchen$1.25M$1,1351,100 ft²2 bd · 1 ba-36
2 HPD-C8 DOBbedbug
14.1Source
357 WEST 55 STREET #2G
Manhattan · built 1935
Hell's Kitchen$999K$1,033967 ft²2 bd · 1 ba-110
2 HPD-C8 DOBbedbug
14.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR ... IN THE ENTRANCE LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Mar 27, 2024 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Mar 27, 2024 · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Mar 27, 2024 · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX ... AT PUBLIC HALL, 1st STORY
    Mar 27, 2024 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Mar 27, 2024 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR ... AT PUBLIC HALL, 1st STORY
    Mar 27, 2024 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST AND WEST WALLS IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND WEST WALLS IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE OF THE BATHTUB IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Mar 27, 2024 · #3D · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2021 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 10, 2018 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 26, 2016 · VIOLATION DISMISSED
DOB permits (last 30)
  • OTMar 9, 2015
    3-RT'S GENERAL CONTRACTOR
  • EQMar 7, 2002
    NAN XIN CONSTR INC.
  • OTJan 23, 2002
    CONTI COMMUNICATION INC
  • EQAug 9, 1990
    SECOND WAVE LANDER CENTER INC.
  • FB-
    EFFICIENT COMB&COOLING CO
  • PL-
    G.BASSOLINO PLUMBING LTD
  • OT-
    EMG INDUSTRIAL CHIMNEY IN
  • OT-
    CONTI COMMUNICATION INC
  • FS-
    EFFICIENT COMB&COOLING CO
  • OT-
    VIANA MULHOLLAND CONST.CO.
  • OT-
    JENESIS BUILDING CORP
  • MH-
    ODYSSIA GLOBAL COMM. CORP
  • SP-
    LAWRENCE J. LEVINE
  • EQ-
    NAN XIN CONSTR INC.
  • OT-
    ODYSSIA GLOBAL COMM. CORP
  • EQ-
    STAR-CEL WATERPRFIN & RES
  • OT-
    3-RT'S GENERAL CONTRACTOR
  • PL-
    F & T MECHANICAL INC
  • OT-
    DEXTERITY INC
  • OT-
    ALCATEL-LUCENT USA INC
  • PL-
    F & T MECHANICAL INC
  • OT-
    TWS DESIGNS INC
  • PL-
    B'S PLBG
  • PL-
    S.K. PIPING & HEATING COR
  • EQ-
    LAKHI GENE CONSTR. INC.
  • OT-
    SBA COMMUNICATION GROUP
  • PL-
    C&Z MECHANICAL PLBG & HTG
  • OT-
    INIGO DESIGN & BUILD LLC
  • PL-
    SMB PLUMBING & HEATING CO
  • OT-
    NAN XIN_ CONSTR INCL
DOB violations
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 27, 2018EARCX-FAILURE TO SUBMIT EER NONE
  • Feb 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 12, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 12, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2012EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 15, 2012ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Apr 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2011E-ELEVATOR ELEVATORREQUIRED
  • Apr 17, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 17, 2008E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2005E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Dec 15, 2000E-ELEVATOR ELEVATORREQUIRED
  • Dec 15, 2000E-ELEVATOR ELEVATORREQUIRED
  • Mar 18, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 28, 1993LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 28, 1990E-ELEVATOR ELEVATORREQUIRED
  • Aug 28, 1990E-ELEVATOR ELEVATORREQUIRED
  • Jun 29, 1990LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Nov 26, 1988E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Hell's Kitchen

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1010460001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jun 3, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
68 permits in the current corpus · latest record Mar 9, 2015

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
19 violations in the current corpus · latest record Sep 9, 2024

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
32 violations in the current corpus · latest record May 24, 2025

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Hell's Kitchen market page.