CurbScoop
CurbScoopBuildingsMidtown157 WEST 57 STREET

157 WEST 57 STREET

Manhattan· Midtown· built 2009class RMBBL 1010107506
Open listing source

157 WEST 57 STREET is a 132-unit building in Midtown, Manhattan, built in 2009.

2 units are on the market here right now.

City records show 30 DOB permits and 50 open violations on file.

Units (res)
132
Floors
77.0
Lot ft²
23,808 ft²
Bldg ft²
702,619 ft²
Assessed
$172.5M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
157 West 57th Street #32T
Manhattan · built 2009
Midtown$3.85M$3,7711,021 ft²1 bd · 1 ba-320
1 HPD-C23 DOBbedbug
20.1Source
157 WEST 57 STREET #36F
Manhattan · built 2009
Midtown$8.99M$3,6892,438 ft²3 bd · 3 ba-269
1 HPD-C23 DOBbedbug
20.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 31, 2023 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 10, 2022 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Jul 15, 2019 · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Jul 15, 2019 · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Jul 15, 2019 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Jul 15, 2019 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jul 15, 2019 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT 1ST STORY PUBLIC HALL AND OUTSIDE DOOR OF THE BOILER ROOM
    Jul 15, 2019 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Jul 15, 2019 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Jul 15, 2019 · VIOLATION DISMISSED
DOB permits (last 30)
  • SP-
    A.R.L. PLMBNG & HTG CORP
  • PL-
    GOLDS PLUMBING CORP
  • OT-
    S. DONADIC INC
  • PL-
    DONATO, INC
  • PL-
    A.R.L. PLUMBING & HTG LLC
  • OT-
    DARTOM CONSTRUCTION LLC
  • MH-
    DARTOM CONSTRUCTION LLC
  • SP-
    H M SPRINKLER INC
  • PL-
    A.R.L. PLUMBING & HTG LLC
  • EQ-
    ATLANTIC HOISTING & SCAFF
  • PL-
    A.R.L. PLUMBING & HTG LLC
  • OT-
    SILVER RAIL ASSOC INC
  • MH-
    SILVER RAIL ASSOC INC
  • SP-
    A.R.L. PLMBNG & HTG CORP
  • OT-
    DARTOM CONSTRUCTION LLC
  • OT-
    SILVER RAIL ASSOC INC
  • MH-
    SILVER RAIL ASSOC INC
  • PL-
    N.PAGANO P&H CONTR LTD
  • OT-
    SILVER RAIL ASSOC INC
  • OT-
    SILVER RAIL ASSOC INC
  • MH-
    SILVER RAIL ASSOC INC
  • OT-
    S. DONADIC INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    SILVER RAIL ASSOC INC
  • PL-
    GOLDS PLUMBING CORP
  • OT-
    TOTAL HOME IMPROVEMENT SE
  • OT-
    S. DONADIC INC
  • MH-
    S. DONADIC INC
  • OT-
    INTERIOR MANAGEMENT LLC
  • OT-
    TOTAL HOME IMPROVEMENT SE
DOB violations
  • Nov 22, 2023AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 29, 2023IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
  • Aug 29, 2023C-CONSTRUCTION OTHER OPTIONAL
  • Aug 29, 2023C-CONSTRUCTION OTHER OPTIONAL
  • Dec 17, 2021EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED
  • Dec 17, 2021EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED
  • Oct 13, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Oct 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 2019E-ELEVATOR ELEVATORREQUIRED
  • Nov 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 16, 2018P-PLUMBING NONE
  • May 2, 2017BENCH-FAILURE TO BENCHMARK NONE
  • Sep 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Sep 8, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 8, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 8, 2015E-ELEVATOR ELEVATORREQUIRED

More buildings in Midtown

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1010107506

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Sep 11, 2025

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
223 permits in the current corpus

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
10 violations in the current corpus · latest record Apr 5, 2023

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
45 violations in the current corpus · latest record Aug 30, 2024

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Midtown market page.