CurbScoop
CurbScoopBuildingsMidtown162 WEST 56 STREET

162 WEST 56 STREET

Manhattan· Midtown· built 1926class RMBBL 1010087502
Open listing source

162 WEST 56 STREET is a 65-unit building in Midtown, Manhattan, built in 1926.

1 unit is on the market here right now.

City records show 30 DOB permits and 61 open violations on file.

Units (res)
65
Floors
15.0
Lot ft²
7,541 ft²
Bldg ft²
76,364 ft²
Assessed
$17.5M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
162 WEST 56 STREET #705
Manhattan · built 1926
Midtown$770K$1,023753 ft²1 bd · 1 ba-522
6 HPD-C19 DOBbedbug
27.0Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Apr 8, 2024 · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING A KICKSTAND STOPPER INSTALED AT VESTIBULE DOOR, 1ST STY.
    Apr 8, 2024 · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING A STOPPER INSTALLED AT BUILDING ENTRANCE DOOR
    Apr 8, 2024 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Apr 8, 2024 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Apr 8, 2024 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Apr 8, 2024 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Apr 8, 2024 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Apr 8, 2024 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Apr 8, 2024 · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE TREADS 1ST AND 4TH UP FROM BOTTOM AT VESTIBULE OF BUILDING , 1st STORY
    Aug 8, 2017 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROVIDE METAL PANS AT MARBLE TREADS 1ST AND 4TH UP FROM BOTTOM AT VESTIBULE OF BUILDING , 1st STORY
    Aug 8, 2017 · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE LOCATED AT APT 901, 9th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 25, 2015 · #901 · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE LOCATED AT APT 901, 9th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 25, 2015 · #901 · VIOLATION CLOSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 3; NOT IN STILE, AND NEED ONE WAY SCREWS LOCATED AT APT 901, 9th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Mar 25, 2015 · #901 · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET , IN THE BATHROOM LOCATED AT APT 1103, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Oct 18, 2013 · #1103 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 605, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2013 · #605 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 605, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2013 · #605 · VIOLATION CLOSED
  • B
    § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 605, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 9, 2013 · #605 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 605, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 9, 2013 · #605 · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 605, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 9, 2013 · #605 · VIOLATION CLOSED
  • B
    § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES THRU OUT 10 STY SOUTHEAST APT 1002 , SECTION '' ''
    Feb 6, 1998 · #1002 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
DOB permits (last 30)
  • MHDec 22, 2010
    WOOD VISION INC
  • PLOct 10, 2003
    THE PLUMB CO
  • FS-
    C C CONTROLLED COMBUSTION
  • PL-
    CC CONTROLLED PLBG CO INC
  • OT-
    CM AND ASSOCIATES CONSTRU
  • OT-
    FAST TRACK ELECTRIC CORP
  • EQ-
    ROCKLEDGE SCAFFOLD
  • OT-
    TJ FULLER CORP
  • PL-
    Z.W PLBG & HTG CORP
  • OT-
    GOTHAM INTERIOR CONTR INC
  • MH-
    GOTHAM INTERIOR CONTR INC
  • OT-
    LIFETIME GENERAL CONTRACT
  • OT-
    ODYSSIA GLOBAL COMM. CORP
  • PL-
    KCM PLUMBING & HEATING CO
  • MH-
    TJ FULLER CORP
  • OT-
    C C CONTROLLED COMBUSTION
  • PL-
    ORBIT PLUMBING & HEATING INC
  • OT-
    HELLMAN CONSTRUCTION CO I
  • MH-
    HELLMAN CONSTRUCTION CO I
  • OT-
    VANTAGE ASSOCIATES
  • PL-
    Z.W PLBG & HTG CORP
  • OT-
    MANDO DESIGN
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • FP-
    ACTIVE FIRE EXTINGUISHER CO, INC
  • OT-
    A INTERNATIONAL LTD
  • EQ-
    AMERITECH CONSTRUCTION C
  • OT-
    AMERITECH CONSTRUCTION C
  • EQ-
    NEW FORCE CONSTRUCTION CO
  • FB-
    C C CONTROLLED COMBUSTION
DOB violations
  • Jun 23, 2024EARCX-FAILURE TO SUBMIT EER NONE
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Feb 22, 2023FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Aug 21, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 19, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Oct 14, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 14, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 14, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 13, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 13, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 13, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 13, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 27, 2018FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 10, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 11, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2015E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Sep 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jul 19, 2013C-CONSTRUCTION OTHER OPTIONAL
  • Apr 19, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 14, 2010E-ELEVATOR ELEVATORREQUIRED

More buildings in Midtown

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1010087502

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Mar 10, 2025

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
121 permits in the current corpus · latest record Dec 22, 2010

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
21 violations in the current corpus · latest record Nov 27, 2024

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
63 violations in the current corpus · latest record Jun 23, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Midtown market page.