CurbScoop
CurbScoopBuildingsMurray Hill250 EAST 40 STREET

250 EAST 40 STREET

Manhattan· Murray Hill· built 1988class RMBBL 1009207501
Open listing source

250 EAST 40 STREET is a 232-unit building in Murray Hill, Manhattan, built in 1988.

1 unit is on the market here right now.

City records show 30 DOB permits and 45 open violations on file.

Units (res)
232
Floors
48.0
Lot ft²
11,924 ft²
Bldg ft²
200,417 ft²
Assessed
$32.9M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
250 EAST 40 STREET #3C
Manhattan · built 1988
Murray Hill$630K$1,409447 ft²studio · 1 ba-55
7 DOBbedbug
10.6Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Feb 15, 2022 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT BASEMENT AT NORTHWEST
    Apr 17, 2019 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BASEMENT AT NORTHWEST
    Apr 17, 2019 · NOV SENT OUT
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS IN THE ENTRANCE LOCATED AT APT 22B, 22nd STORY, APARTMENT AT WEST
    Mar 23, 2019 · #22B · VIOLATION CLOSED
DOB permits (last 30)
  • OTMar 10, 2004
    GEO CONTRACTING
  • PL-
    PAL MAR PLUMB HEAT
  • EQ-
    INTERSYSTEM S&S CORP
  • AL-
    TOTONNOS CONSTRUCTION
  • OT-
    M & G WATERPROOKING
  • OT-
    A BOVE CONSTRUCTION CORP
  • OT-
    INTERBORO SIGN & MAINTENANCE
  • OT-
    INNSBRUCK RENOVATIONS,LLC
  • MH-
    INNSBRUCK RENOVATIONS,LLC
  • OT-
    ARCON SOLUTIONS LLC
  • OT-
    INTERBORO SIGN/MAINTENANCE CO.
  • MH-
    KAYAFAS CONTR. CO. INC.
  • OT-
    KAYAFAS CONTR. CO. INC.
  • OT-
    ARCON SOLUTIONS LLC
  • MH-
    EXPERT DUCT/RSK TECH
  • PL-
    DAVID JABLON
  • OT-
    GEO CONTRACTING
  • OT-
    FRANCO REMODELING CORP
  • PL-
    GIL GLICK
  • OT-
    KINGS STAR CONSTRUCTION C
  • OT-
    PRATT CONSTRUCTION & REST
  • OT-
    JAB ASSOC INC.
  • PL-
    BERNARD JABLON PLUMBING CO.
  • OT-
    H INTERIOR DESIGN CONSTRU
  • PL-
    ISIS PLUMBING INC
  • MH-
    GEO CONTRACTOR
  • OT-
    GEO CONTRACTOR
  • OT-
    HRBDX INC
  • PL-
    CEGF &G PLBG CORP
  • EQ-
    NEW CENTURY CONSTRUCTION CORP.
DOB violations
  • Dec 23, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Jun 5, 2025P-PLUMBING NONE
  • Aug 3, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Jun 3, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Mar 6, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 3, 2018E-ELEVATOR ELEVATORREQUIRED
  • Apr 3, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 15, 2017E-ELEVATOR ELEVATORREQUIRED
  • Mar 15, 2017E-ELEVATOR ELEVATORREQUIRED
  • Mar 15, 2017E-ELEVATOR ELEVATORREQUIRED
  • Feb 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2012E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2012E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 16, 2009E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 2009E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 5, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Apr 19, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 19, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 19, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jun 30, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jun 30, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jun 30, 2006E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2005E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2005E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2005E-ELEVATOR ELEVATORREQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Murray Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1009207501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 8, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
76 permits in the current corpus · latest record Mar 10, 2004

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
5 violations in the current corpus · latest record Aug 12, 2022

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
40 violations in the current corpus · latest record Dec 23, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Murray Hill market page.