CurbScoop
CurbScoopBuildingsMurray Hill415 EAST 37 STREET

415 EAST 37 STREET

Manhattan· Murray Hill· built 1989class R4BBL 1009697501
Open listing source

415 EAST 37 STREET is a 410-unit building in Murray Hill, Manhattan, built in 1989.

4 units are on the market here right now.

City records show 30 DOB permits and 54 open violations on file.

Units (res)
410
Floors
43.0
Lot ft²
14,868 ft²
Bldg ft²
413,297 ft²
Assessed
$71.1M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
415 EAST 37 STREET #27F
Manhattan · built 1989
Murray Hill$2.50M-0 ft²3 bd · 3 ba-89
3 HPD-C6 DOBbedbug
14.2Source
415 EAST 37 STREET #37NN
Manhattan · built 1989
Murray Hill$1.15M$1,328866 ft²1 bd · 1 ba-94
3 HPD-C6 DOBbedbug
14.2Source
415 EAST 37 STREET #21J
Manhattan · built 1989
Murray Hill$1.35M$1,2441,085 ft²2 bd · 2 ba-27
3 HPD-C6 DOBbedbug
14.2Source
415 EAST 37 STREET #7F
Manhattan · built 1989
Murray Hill$1.50M$1,616927 ft²2 bd · 2 ba-146
3 HPD-C6 DOBbedbug
14.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2021 · VIOLATION DISMISSED
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (30 SQ FT) IN THE BATHROOM LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Sep 7, 2019 · #7C · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Sep 7, 2019 · #7C · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Sep 7, 2019 · #7C · VIOLATION DISMISSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE FOYER LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THROUGHOUT CEILING IN THE FOYER LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT NORTH WALL IN THE BATHROOM LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING NORTH SOUTH AND WEST WALLS IN THE BATHROOM LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE HINDGE TO CASEMENT WINDOW AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Aug 26, 2019 · #7C · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 25, 2016 · VIOLATION DISMISSED
DOB permits (last 30)
  • OTMay 3, 2005
    R. GREENBERG CONSTRUCTION CORP
  • OTDec 13, 2000
    TOWER CONT.
  • OTSep 15, 1999
    MCA LEISH MICHAEL
  • FSMar 1, 1995
    VACHERON HORIZON CO.
  • SPMar 14, 1994
    ZERO OUT FIRE SPRINKLER
  • PL-
    PAUL QUINN PLG AND HTG INC
  • PL-
    FRED SMITH PLBG & HTG CO INC
  • OT-
    ABSELET CONTRACTING CORP
  • OT-
    BELLET CONSTRUCTIONM
  • PL-
  • OT-
    HI TOWER CONTRACTING CORP
  • MH-
    GOTHAM AIR CONDIT. SERV. INC.
  • EQ-
    CLARK & WILKINS INDUSTRIESINC
  • PL-
    HYDRO-MECHANICAL INC
  • PL-
    HYDRO-MECHANICAL INC
  • EQ-
    BELLET CONSTRUCTION CO
  • PL-
    BMV MECHANICAL CORP
  • OT-
    TOWER CONTR. CORP
  • MH-
    VACHERON HORIZON CO.
  • FS-
    VACHERON HORIZON CO.
  • OT-
    UNITED CUSTOM MADE FURNITURE INC
  • OT-
    LD GENERAL CONSTRUCTION
  • OT-
    ABSELET CONTRACTING
  • OT-
    ROSE CARPENTRY INC
  • OT-
    MJ DELTA CONSTRUCTION CO
  • SP-
    ZERO OUT FIRE SPRINKLER
  • OT-
    TOWER CONTRACTING
  • PL-
    HYDRO MECH. INC.
  • MH-
    MJ DELTA CONSTRUCTION CO
  • OT-
    TOWER OCNST. CORP
DOB violations
  • Jul 12, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Mar 24, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 24, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 24, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 24, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 24, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 4, 2018P-PLUMBING NONE
  • Jul 12, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Apr 9, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2017E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2017E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2017E-ELEVATOR ELEVATORREQUIRED
  • Oct 19, 2016AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2016E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Feb 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Feb 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Feb 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Feb 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Feb 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Feb 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Feb 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Feb 1, 2013E-ELEVATOR ELEVATORREQUIRED
  • Feb 1, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2009E-ELEVATOR ELEVATORREQUIRED

More buildings in Murray Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1009697501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jun 9, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
127 permits in the current corpus · latest record May 3, 2005

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
14 violations in the current corpus · latest record Apr 23, 2021

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
62 violations in the current corpus · latest record Jul 12, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Murray Hill market page.