CurbScoop
CurbScoopBuildingsMurray Hill210 EAST 36 STREET

210 EAST 36 STREET

Manhattan· Murray Hill· built 1960class D4BBL 1009160055
Open listing source

210 EAST 36 STREET is a 102-unit building in Murray Hill, Manhattan, built in 1960.

1 unit is on the market here right now.

City records show 13 DOB permits and 41 open violations on file.

Units (res)
102
Floors
13.0
Lot ft²
7,406 ft²
Bldg ft²
61,839 ft²
Assessed
$9.08M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
210 EAST 36 STREET #3D
Manhattan · built 1960
Murray Hill$399K$879454 ft²studio · 1 ba-43
9 DOBbedbug
10.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 4, 2025 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 22, 2024 · VIOLATION DISMISSED
  • B
    SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 11, 2009 · #11A · NOV SENT OUT
  • B
    SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 11, 2009 · #11A · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE RADIATOR IN THE KITCHEN LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 11, 2009 · #11A · NOV SENT OUT
  • B
    SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 16, 2009 · #11A · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER WINDOW SASH COUNTER BALANCE IN THE 2nd ROOM FROM EAST LOCATED AT APT 11A, 11th STORY, 1st APARTMENT FROM NORTH AT EAST
    Nov 12, 2008 · #11A · NOV SENT OUT
DOB permits (last 30)
  • EQ-
    COLGATE SCAFFOLDING & EQUIPMENT
  • OT-
    ASPIRO RENOVATIONS LLC
  • OT-
    DNA CONTRACTING LLC
  • OT-
    INSIDER SAM INC
  • OT-
    DNA CONTRACTING LLC
  • PL-
    INFINITI ESC PLUMBING COR
  • PL-
    BARGAIN PLMBING & HTGING
  • OT-
    REG-ED CONSTRUCTION INC
  • AL-
    BRITO BUILDERS
  • PL-
    HELD BROTHERS
  • OT-
    REG-ED CONSTRUCTION INC
  • EQ-
    COLGATE SCAFFOLDING & EQUIPMENT
  • OT-
    DNA CONTRACTING LLC
DOB violations
  • Oct 1, 2019RWNRF-RETAINING WALL NONE
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Mar 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 7, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jan 29, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jan 29, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jan 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2013E-ELEVATOR ELEVATORREQUIRED
  • Aug 22, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 22, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Sep 18, 2009E-ELEVATOR ELEVATORREQUIRED
  • Sep 18, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 29, 2006E-ELEVATOR ELEVATORREQUIRED
  • Sep 29, 2006E-ELEVATOR ELEVATORREQUIRED
  • Dec 29, 2005E-ELEVATOR ELEVATORREQUIRED
  • Dec 29, 2005E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jun 27, 2002E-ELEVATOR ELEVATORREQUIRED
  • Jun 27, 2002E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2001E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2001E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2001E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 1997LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 13, 1997LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Mar 18, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Dec 11, 1989C-CONSTRUCTION OTHER OPTIONAL
  • Dec 11, 1989C-CONSTRUCTION OTHER OPTIONAL

More buildings in Murray Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1009160055

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 22, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
13 permits in the current corpus

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
7 violations in the current corpus · latest record Aug 22, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
34 violations in the current corpus · latest record Oct 1, 2019

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Murray Hill market page.