CurbScoop
CurbScoopBuildingsMurray Hill211 EAST 35 STREET

211 EAST 35 STREET

Manhattan· Murray Hill· built 1929class D4BBL 1009160009
Open listing source

211 EAST 35 STREET is a 76-unit building in Murray Hill, Manhattan, built in 1929.

1 unit is on the market here right now.

City records show 30 DOB permits and 38 open violations on file.

Units (res)
76
Floors
10.0
Lot ft²
7,900 ft²
Bldg ft²
57,834 ft²
Assessed
$6.99M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
211 EAST 35 STREET #10G
Manhattan · built 1929
Murray Hill$620K-0 ft²1 bd · 1 ba-7
2 DOBbedbug
7.3Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 2, 2022 · VIOLATION DISMISSED
  • A
    SECTION 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCY?S HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    May 18, 2015 · VIOLATION CLOSED
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 7G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 25, 2013 · #7G · VIOLATION CLOSED
  • B
    SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFCETIVE IN THE ENTIRE APARTMENT LOCATED AT APT 7G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 25, 2013 · #7G · VIOLATION CLOSED
  • A
    D26-20.08 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING 1ST STY PUBLIC HALL.
    May 27, 1987 · VIOLATION CLOSED
  • A
    SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING 1ST STY PUBLIC HALL.
    May 27, 1987 · VIOLATION CLOSED
DOB permits (last 30)
  • PL-
    NY CITY PLUMBER CORP
  • EQ-
    ROCKLEDGE SCAFFOLD
  • FS-
    CC CONTROLLED COMBUSTION
  • OT-
    CC CONTROLLED COMBUSTION
  • EQ-
    SUNN ENTERPRISE GRP LLC
  • EQ-
    SUNN ENTERPRISE GRP LLC
  • OT-
    PROMENADE CONTRACTING LLC
  • PL-
    G.P. MECHANICAL CORP
  • OT-
    GENESIS DESGIN CONSTR.
  • OT-
    ELIZABETH SCHULTZ
  • PL-
    A REAL GOOD PLBG INC
  • OT-
    JANBAR INC
  • OT-
    BCS CONSTRUCT SERV CORP
  • PL-
    ADRIATIC PLBG & HTG CORP
  • OT-
    DACIA CONTRACTING
  • EQ-
    NEW CENTURY CONSTRUCTION CORP
  • EQ-
    NEW CENTURY CONSTRUCTION
  • PL-
    SUNSET PLG AND FIRE PROTECTION
  • OT-
    APA REST. CORP
  • EQ-
    ROCKLEDGE SCAFFOLD
  • PL-
    WAGNER ZIV PLUMBING & HEATING CO
  • FS-
    STAR INDUSTRIAL SERVICE CO INC
  • OT-
    DELIN CONTRACTING CORP
  • PL-
    TESTERMAN PLBG & HTG INC
  • OT-
    OASIS INTERIORS INC
  • EQ-
    NEW CENTURY CONSTRUCTION
  • PL-
    JOSEPH FERRIGNO P&H CO
  • BL-
    STAR INDUSTRIAL SERV CO
  • FB-
    STAR INDUSTRIAL SERV CO
  • FS-
    STAR INDUSTRIAL SERV CO
DOB violations
  • Oct 1, 2019RWNRF-RETAINING WALL NONE
  • Mar 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 8, 2016E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jan 29, 2015E-ELEVATOR ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jan 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2009E-ELEVATOR ELEVATORREQUIRED
  • Mar 4, 2008E-ELEVATOR ELEVATORREQUIRED
  • Mar 4, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 17, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 17, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jul 4, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jul 4, 2006E-ELEVATOR ELEVATORREQUIRED
  • Sep 26, 2005E-ELEVATOR ELEVATORREQUIRED
  • Sep 26, 2005E-ELEVATOR ELEVATORREQUIRED
  • Mar 19, 2003LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 24, 2002E-ELEVATOR ELEVATORREQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 18, 2001E-ELEVATOR ELEVATORREQUIRED
  • Sep 18, 2001E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2000E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2000E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 1, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Murray Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1009160009

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 28, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
42 permits in the current corpus

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
6 violations in the current corpus · latest record Dec 15, 2022

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
32 violations in the current corpus · latest record Jun 27, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Murray Hill market page.