CurbScoop
CurbScoopBuildingsMurray Hill132 EAST 35 STREET

132 EAST 35 STREET

Manhattan· Murray Hill· built 1969class D4BBL 1008900020
Open listing source

132 EAST 35 STREET is a 187-unit building in Murray Hill, Manhattan, built in 1969.

1 unit is on the market here right now.

City records show 30 DOB permits and 66 open violations on file.

Units (res)
187
Floors
18.0
Lot ft²
15,089 ft²
Bldg ft²
205,000 ft²
Assessed
$25.8M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
132 EAST 35 STREET #16E
Manhattan · built 1969
Murray Hill$1.20M-0 ft²2 bd · 2 ba-81
2 HPD-C8 DOBbedbug
13.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 25, 2024 · #11J · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE BATHROOM LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 25, 2024 · #11J · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE KITCHEN LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 25, 2024 · #11J · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK WEST WALL IN THE KITCHEN LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 25, 2024 · #11J · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 25, 2024 · #11J · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 25, 2024 · #11J · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 15, 2018 · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). NOT INSTALLED WITHIN 15 FEET OF SLEEPING AREA TWO REQUIRED LOCATED AT APT 17C, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 15, 2018 · #17C · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR NOT INSTALLED WITHIN 15 FEET OF SLEEPING AREA TWO REQUIRED LOCATED AT APT 17C, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 15, 2018 · #17C · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Oct 15, 2018 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Oct 15, 2018 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    Oct 15, 2018 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Oct 15, 2018 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Oct 15, 2018 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Oct 15, 2018 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORY
    Oct 15, 2018 · NOV SENT OUT
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 17C, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 15, 2018 · #17C · NOV SENT OUT
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Feb 2, 2015 · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 17C, 17th STORY, 1st APARTMENT FROM WEST AT NORTH
    Aug 16, 2008 · #17C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 18B, 18th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 19, 2004 · #18B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 18B, 18th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 19, 2004 · #18B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 18B, 18th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 19, 2004 · #18B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 18B, 18th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 19, 2004 · #18B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS IN THE FOYER LOCATED AT APT 18B, 18th STORY, 1st APARTMENT FROM WEST AT NORTH
    Mar 19, 2004 · #18B · NOV SENT OUT
  • B
    D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRIC TIMING LOCKS ON DOORS FROM CELLAR TO GARAGE PREVENTING ONE DOOR FROM OPENING UNTIL THE OTHER IS CLOSED.
    Jan 21, 1998 · NOV SENT OUT
  • B
    D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SOOT ENTERING APT DUE TO BACK TO BACK DRAFT 18 STY NORTHWEST APT 18B FIRE PLACE NORTHWEST ROOM.
    Jun 27, 1989 · NOV SENT OUT
DOB permits (last 30)
  • PLSep 18, 2015
    ROLANDO MECHANICAL CORP
  • SGSep 23, 1999
    NORTH SHORE SIGN CO INC
  • OT-
    MESTA CONTRACTING
  • OT-
    BSM MAINTENANCE CORP
  • OT-
    LOWER EAST SIDE CONST INC
  • OT-
    RITE WAY INTERNAL REMOVAL INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • OT-
    VIPER CONSTRUCTION INC
  • PL-
    QMB PLUMBING & HEATING IN
  • PL-
    CAPE PLUMBING INC
  • PL-
    RETCON MECHANICAL CORP
  • OT-
    INIGO DESIGN AND BUILD LLC
  • PL-
    CORIOLIS EFFECT,INC.TING INC
  • OT-
    S. DIGIACOMO & SONS INC
  • PL-
    BETA PLUMBING & HEATING CORP
  • OT-
    SUPER POWER CONSTRUCTION
  • OT-
    VIPER CONSTRUCTION INC
  • OT-
    YATES REST GROUP LTD
  • EQ-
    PENINSULA CONTRACTING CORP
  • MH-
    PENINSULA CONTRACTING CORP
  • OT-
    PENINSULA CONTRACTING CORP
  • OT-
    BAYSIDE CONTRACTING
  • EQ-
  • MH-
    GOTHAM AIR CONDITIONING
  • OT-
    SAFDESIGN INC
  • OT-
    ARTA RENOVATIONS INC
  • PL-
    GALICJA PLBG AND HTG.CORP
  • PL-
    J.M. VOTTO INC
  • PL-
    WARD PLUMBING CORP
  • PL-
    ADVANTAGE PLBG & MECH.COR
DOB violations
  • Jun 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • May 10, 2021E-ELEVATOR ELEVATORREQUIRED
  • May 10, 2021E-ELEVATOR ELEVATORREQUIRED
  • May 10, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Feb 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 12, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 23, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 10, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 29, 2012C-CONSTRUCTION OTHER OPTIONAL
  • Jul 15, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 15, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 15, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jun 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2009E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2009E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2009E-ELEVATOR ELEVATORREQUIRED
  • Sep 15, 2009E-ELEVATOR ELEVATORREQUIRED
  • Aug 4, 2008E-ELEVATOR ELEVATORREQUIRED

More buildings in Murray Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1008900020

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 15, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 10, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
136 permits in the current corpus · latest record Sep 18, 2015

Pipeline completed Sep 10, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
26 violations in the current corpus · latest record Jun 26, 2024

Pipeline completed Sep 10, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
81 violations in the current corpus · latest record Dec 16, 2022

Pipeline completed Sep 10, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Murray Hill market page.