CurbScoop
CurbScoopBuildingsGreenwich Village21 EAST 12 STREET

21 EAST 12 STREET

Manhattan· Greenwich Village· built 2016class RMBBL 1005707503
Open listing source

21 EAST 12 STREET is a 51-unit building in Greenwich Village, Manhattan, built in 2016.

1 unit is on the market here right now.

City records show 25 DOB permits and 13 open violations on file.

Units (res)
51
Floors
23.0
Lot ft²
19,067 ft²
Bldg ft²
143,044 ft²
Assessed
$24.2M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
21 EAST 12 STREET #8A
Manhattan · built 2016
Greenwich Village$4.10M$2,7741,478 ft²2 bd · 2 ba-90
1 DOBbedbug
8.6Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
None.
DOB permits (last 30)
  • EQ-
    CNY CONSTRUCTION LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    CNY CONSTRUCTION LLC
  • SD-
    CURRENT FIRE PROTECTION I
  • EQ-
    CNY CONSTRUCTION LLC
  • SD-
    CURRENT FIRE PROTECTION I
  • SD-
    CURRENT FIRE PROTECTION I
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • OT-
    LORICH CONSTRUCTION MANAG
  • MH-
    LORICH CONSTRUCTION MANAG
  • PL-
    7 C'S PLBG & HTG CORP
  • OT-
    MO CONTRACTING INC
  • EQ-
    HIGHBURY CONCRETE, INC
  • SP-
    J. CAIAZZO PLBG & HTG COR
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • EQ-
    SAFWAY ATLANTIC, LLC
  • BL-
    G.N.T. MECHANICAL, LLC
  • MH-
    CNY CONSTRUCTION LLC
DOB violations
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 27, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 27, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 27, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 27, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 1, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Aug 1, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Jun 13, 2017C-CONSTRUCTION OTHER OPTIONAL
  • Aug 10, 2016AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 2, 2016BENCH-FAILURE TO BENCHMARK NONE
  • Jun 2, 2016BENCH-FAILURE TO BENCHMARK NONE

More buildings in Greenwich Village

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1005707503

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Mar 25, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
25 permits in the current corpus

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
13 violations in the current corpus · latest record Jul 1, 2021

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Greenwich Village market page.