CurbScoop
CurbScoopBuildingsGreenwich Village63 EAST 9 STREET

63 EAST 9 STREET

Manhattan· Greenwich Village· built 1955class RMBBL 1005617501
Open listing source

63 EAST 9 STREET is a 229-unit building in Greenwich Village, Manhattan, built in 1955.

2 units are on the market here right now.

City records show 30 DOB permits and 67 open violations on file.

Units (res)
229
Floors
14.0
Lot ft²
28,500 ft²
Bldg ft²
247,908 ft²
Assessed
$31.5M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
63 EAST 9 STREET #3M
Manhattan · built 1955
Greenwich Village$1.02M$1,206850 ft²1 bd · 1 ba-47
1 HPD-C11 DOBbedbug
14.1Source
63 EAST 9 STREET #10L
Manhattan · built 1955
Greenwich Village$1.20M-0 ft²1 bd · 1 ba-65
1 HPD-C11 DOBbedbug
14.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 4, 2025 · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Apr 20, 2023 · #7H · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Apr 20, 2023 · #7H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Apr 20, 2023 · #7H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCHUTCHEON PLATE AT RISER AT FLOOR IN THE BATHROOM LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Apr 20, 2023 · #7H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 26, 2022 · #7H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 26, 2022 · #7H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER PIPE IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jan 10, 2020 · #7H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jan 10, 2020 · #7H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jan 10, 2020 · #7H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Oct 31, 2019 · #7H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER AT EAST WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Oct 31, 2019 · #7H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE FOYER LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Oct 31, 2019 · #7H · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Oct 31, 2019 · #7H · VIOLATION CLOSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 6, 2017 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... OR MILDEW ON THE NORTHWALL TILES IN THE BATHROOM LOCATED AT APT 7H, 7th STORY, APARTMENT AT NORTH
    Mar 9, 2016 · #7H · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & NORTH WALL ON TOP OF THE WINDOW IN THE BATHROOM LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Sep 16, 2015 · #7H · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 8, 2015 · #7H · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & NORTH WALL IN THE BATHROOM LOCATED AT APT 7H, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
    Jun 23, 2015 · #7H · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING & WALLS AT NORTH STAIR '' B '' , ALL STORIES THROUGHOUT AT PUBLIC HALL STAIRS
    Jun 23, 2015 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT 1ST FROM WEST AT SOUTH (C STAIRS) THROUGHOUT
    Jun 12, 2014 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT 1ST STAIRCASE FROM WEST AT NORTH (B STAIRS)THROUGHOUT
    Jun 12, 2014 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT 1ST NORTH (A STAIRS) THROUGHOUT
    Jun 12, 2014 · VIOLATION CLOSED
  • B
    § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT 1ST STORY REAR SECTION PUBLIC HALL
    Jun 12, 2014 · VIOLATION CLOSED
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF ELECTRICAL BX CABLE AT EAST SOUTH WALL AT 2ND STORY NORTH 1ST PUBLIC STAIRS (STAIR A)
    Jun 12, 2014 · VIOLATION CLOSED
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF ELECTRICAL BX CABLE AT CEILING AND EAST WALL AT REAR SECTION 1ST STORY PUBLIC HALL
    Jun 12, 2014 · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATE LOCK AT GLASS DOOR AT BUILDING FRONT ENTRANCE
    Sep 23, 2013 · VIOLATION CLOSED
DOB permits (last 30)
  • PLDec 13, 2016
    C & T PLUMBING & HTG INC
  • PLDec 5, 2014
    C & T PLUMBING & HTG INC
  • FPNov 25, 1997
    IDEAL FIRE CONTROL
  • OTAug 29, 1996
    RICHARDSON & LUCAS INC
  • OT-
    GAUDIOSO CONTRACTING INC
  • OT-
    FLORIAN GLASS SERVICE INC
  • EQ-
    ROCKLEDGE SCAFFOLD
  • OT-
    JZB CONSTRUCTION CO LLC
  • OT-
    APPLE RENOVATORS INC
  • PL-
    BMC PLUMBING CORP
  • BL-
    ABILENE INC
  • FB-
    ABILENE INC
  • MH-
    ABILENE INC
  • PL-
    MAGNUM PLBG & HTG
  • PL-
    EDGECOMBE.PLUMBING & HEAT
  • OT-
    ADRIATIC PLUMBING & HEATI
  • PL-
    THE RIGHT CONNECTION P AND H INC
  • EQ-
    PRODUCTION CONTRACT. LLC
  • OT-
    PRODUCTION CONTRACT. LLC
  • MH-
    PRODUCTION CONTRACT. LLC
  • OT-
    TRIWORKS INC
  • PL-
    LANDO&ASSOCIATES, INC.
  • OT-
    ABILENE INC
  • FB-
    ABILENE, INC
  • FS-
    ABILENE, INC
  • PL-
    BMC PLUMBING CORP
  • PL-
    RRP PLUMBING CORP
  • PL-
    GO PRO PLBNG AND HTG CO I
  • OT-
    KLONDIKE CONSTRUCTION COR
  • OT-
    VEMA CONTRACTING
DOB violations
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 23, 2024EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 14, 2024C-CONSTRUCTION OTHER OPTIONAL
  • Mar 6, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Aug 21, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Feb 15, 2022C-CONSTRUCTION OTHER OPTIONAL
  • Apr 15, 2020E-ELEVATOR ELEVATORREQUIRED
  • Apr 15, 2020E-ELEVATOR ELEVATORREQUIRED
  • Apr 15, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 22, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 22, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 12, 2009E-ELEVATOR ELEVATORREQUIRED
  • May 12, 2009E-ELEVATOR ELEVATORREQUIRED
  • May 12, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 15, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 15, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 15, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 14, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 2, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2005E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2005E-ELEVATOR ELEVATORREQUIRED

More buildings in Greenwich Village

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1005617501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Apr 30, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
188 permits in the current corpus · latest record Dec 13, 2016

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
27 violations in the current corpus · latest record Jun 9, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
50 violations in the current corpus · latest record Nov 14, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Greenwich Village market page.