CurbScoop
CurbScoopBuildingsBattery Park City21 SOUTH END AVENUE

21 SOUTH END AVENUE

Manhattan· Battery Park City· built 1988class RMBBL 1000167509
Open listing source

21 SOUTH END AVENUE is a 181-unit building in Battery Park City, Manhattan, built in 1988.

2 units are on the market here right now.

City records show 30 DOB permits and 48 open violations on file.

Units (res)
181
Floors
9.0
Lot ft²
45,203 ft²
Bldg ft²
194,762 ft²
Assessed
$37.6M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
21 SOUTH END AVENUE #PH1A
Manhattan · built 1988
Battery Park City$2.23M$1,5991,395 ft²2 bd · 2 ba-30
1 HPD-C14 DOBbedbug
13.1Source
21 SOUTH END AVENUE #402
Manhattan · built 1988
Battery Park City$2.83M$1,3412,107 ft²4 bd · 3 ba-114
1 HPD-C14 DOBbedbug
13.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 29, 2026 · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 17, 2025 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 15, 2023 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 3, 2022 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Apr 9, 2016 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Apr 9, 2016 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Apr 9, 2016 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISING AT PUBLIC HALL, 1st STORY
    Apr 9, 2016 · VIOLATION CLOSED
DOB permits (last 30)
  • OTApr 16, 2018
    ASG CONSTRUCTION GROUP IN
  • PLFeb 23, 2015
    TOP PLUMBING GROUP INC
  • OTNov 19, 2003
    ACC CONTRACTING
  • PLNov 10, 1997
    MAGOR PLUMBING & HEATING
  • PLFeb 2, 1996
    GEORGE BRESLAW & SONS INC
  • EQ-
    MING CONST.
  • OT-
    TECTON CONTRCUTION INC
  • PL-
    RRP PLUMBING CORP
  • BL-
    WASOFF PLBG & UTILITY CO
  • OT-
    RESPONSIVE CONTR. INC.
  • PL-
    GEORGE BRESLAW & SONS INC
  • OT-
    HITE CONSTRUCTION
  • OT-
    FINIX U.S.A. CONSTRUCTION
  • OT-
    ATC CONSTRUCTION GROUP
  • EQ-
    XINOS CONSTRUCTION CORP
  • PL-
    C.S_PLUMBING INC
  • FB-
    C C CONTROLLED COMBUSTION
  • AL-
    ABACUS CONST
  • PL-
    RETCON MECHANICAL CORP
  • OT-
    ICON CONSTRUCTION & PROPE
  • MH-
    ICON CONSTRUCTION & PROPE
  • PL-
    VSP MECHANICAL INC
  • OT-
    FINIX U.S.A. CONSTRUCTION
  • PL-
    TOP PLUMBING GROUP INC
  • OT-
    NRG MAGIC CONSTRUCTION IN
  • OT-
    NRG MAGIC CONSTRUCTION IN
  • OT-
    NRG MAGIC CONSTRUCTION IN
  • OT-
    NRG MAGIC CONSTRUCTION IN
  • OT-
    GIRON CONTRACTING INC
  • FS-
    C C CONTROLLED COMBUSTION
DOB violations
  • Jun 20, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 1, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Jan 15, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 16, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 2, 2012E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 11, 2009E-ELEVATOR ELEVATORREQUIRED
  • Feb 11, 2009E-ELEVATOR ELEVATORREQUIRED
  • Feb 11, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 18, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 18, 2008E-ELEVATOR ELEVATORREQUIRED

More buildings in Battery Park City

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1000167509

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record May 4, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
226 permits in the current corpus · latest record Apr 16, 2018

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
8 violations in the current corpus · latest record Apr 29, 2026

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
59 violations in the current corpus · latest record Jun 20, 2023

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Battery Park City market page.