20 93 STREET · #2B
Fort Hamilton· built 1935openSales listingBBL 3061040017






Price
$379K
$/ft²
$606
Days on market
1
Monthly taxes
-
Common charges
-
Maintenance
$775
Description
No Board Approval Needed! Prime Bay Ridge one bedroom Co-op apartment. Just off Shore Road this unit features a new bathroom and new kitchen appliances, including a dishwasher. Express bus to Manhattans up the block and the R train is 3 blocks away. 3rd Avenue shopping and restaurants are walking distance. Quick access to the Belt Parkway and BQE. The unit is in an elevator building with laundry and full time super on site.
Price history
Every list / cut / contract / sold event we've recorded.
- listedJun 25, 2026$379KListed by Velsor Realty
In-building transactions
Every recorded deed (incl. private + sponsor) for this BBL - actual prices paid.
No transactions recorded for this BBL yet.
Open violations + recent permits
DOB / HPD signals for this BBL.
Open HPD violations (15)
- B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 20 SQ FT AT EAST WALL AT PUBLIC HALL, 5th STORY ORIGINAL VIOLATION 15726416 ISSUED 17-FEB-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).Feb 17, 2023
- A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYFeb 17, 2023
- A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX [ MISSING NOTICE ] AT PUBLIC HALL, 1st STORYFeb 17, 2023
- A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYFeb 17, 2023
- B§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 17, 2023 · apt 5B
- B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 17, 2023 · apt 5B
- A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORYFeb 17, 2023
- B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 20 SQ FT AT EAST WALL AT PUBLIC HALL, 6th STORY ORIGINAL VIOLATION 15726415 ISSUED 17-FEB-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).Feb 17, 2023
- A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX [ MISSING NOTICE ] AT PUBLIC HALL, 1st STORYJan 10, 2023
- B§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 10, 2023 · apt 5B
- B§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 10, 2023 · apt 5B
- B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 10, 2023 · apt 5B
- B§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE SADDLE IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 10, 2023 · apt 5B
- B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 10, 2023 · apt 5B
- A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORYJan 10, 2023
Recent DOB permits (6)
- OT-JPO CONTRACTORS CORP
- PL-ALJER PLBG & HTG CORP
- PL-G & J PLMBNG AND HTG INC
- OT-JPO CONTRACTORS CORP
- OT-JPO CONTRACTORS CORP
- OT-PILKU CONSTRUCTION SERVIC