201 WEST 70 STREET · #2B







Description
Large Sunny Quiet 1 Bed/1 Bath Welcome to 201 West 70th St, an exceptional high-rise co-op offering a blend of modern elegance and convenience in the heart of the UWS. Step inside this renovated coveted B-line to find wide plank modern hardwood floors, closets galore, built-ins and a western exposure, providing warm natural light throughout. The apartment has open views and faces a landscaped beautiful garden where you can enjoy the cherry blossom trees outside your window. The open kitchen features premium granite counters, stainless steel appliances to include a convection oven, a glistening glass backsplash and custom cabinetry with new hardware. The combo living/dining room is perfect for entertaining or everyday living. The large bedroom fits a King bed plus furniture and is fitted with custom dual closets offering ample storage for all your essentials. The ceramic bathroom indulges with its clean design to include a floating vanity, soaking tub, glass shower doors and modern lighting. The building is a full-service co-op with a doorman, concierge, live-in resident manager, onsite managing agent, 24 hour central laundry, well equipped gym, bicycle storage (wait list), parking garage with direct access into the building, a beautifully landscaped drive circle (you can park for 30 minutes), rooftop deck with sweeping views of the city and a furnished garden. Pet friendly, Pied-a-terre buyers and parents buying for adult children are welcome. This is a non-smoking building Located directly across the street from the Express/Local 123 subway lines, close to the B/C subway and the M104,M5,M72 bus lines. A Citibike rack is also conveniently located in front of the building. Favorite neighborhood grocers: Trader Joe's, Fairway, Citarella, Zabar's, Morton Williams, H Mart and soon to open Wegman's. Popular restaurants include Cafe Luxembourg, The Smith, Red Farm, The Ribbon and El Fish. Minutes to Central Park and Riverside Park. Don't miss this opportunity to live in the heart of the UWS! *Capital Contribution to co-op equal to 4 months maintenance paid by buyer at closing.
Price history
Every list / cut / contract / sold event we've recorded.
- listedApr 30, 2026$885K+58.3%Listed by Compass
- soldFeb 3, 2012$559K-0.1%Sold by Becker Reuben & Associates
- closingJan 23, 2012$559K+0.1%Closing record
- in contractNov 16, 2011$559K0.0%In contract
- listedOct 5, 2011$559KListed by Becker Reuben & Associates
In-building transactions
Every recorded deed (incl. private + sponsor) for this BBL - actual prices paid.
Open violations + recent permits
DOB / HPD signals for this BBL.
- B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EASTApr 14, 2025 · apt 5D
- B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HANDLE AT DOOR LEADING TO TERRACE IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EASTApr 14, 2025 · apt 5D
- B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER PANE GLASS AT DOOR LEADING TO TERRACE IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EASTApr 14, 2025 · apt 5D
- B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT APT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 31K, 30th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 25, 2023 · apt 31K
- A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 31K, 30th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 25, 2023 · apt 31K
- B§ 27-2005, 2012 HMC & § 309 MDL: ABATE THE NUISANCE CONSISTING OF EXCESSIVE STORAGE OF MATERIAL CONSISTING OF BOXES AND PAPER CREATING SAFETY HAZARD AT THE FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 31K, 30th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 25, 2023 · apt 31K
- A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 31K, 30th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 25, 2023 · apt 31K
- A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 31K, 30th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 25, 2023 · apt 31K
- A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 31K, 31st STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 28, 2023 · apt 31K
- A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 31K, 31st STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 28, 2023 · apt 31K
- B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 31K, 31st STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 28, 2023 · apt 31K
- A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Apr 1, 2021
- I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.Apr 1, 2021
- A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORYMay 17, 2018
- A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYMay 17, 2018
- PLSep 27, 2004ZW PLUMB HEAT.
- OTNov 10, 2003JOHN PEREZ PAINTING & CONTRACTIN
- EQMay 1, 2002LASORSA INC
- SGMar 30, 1993NORTH SHORE NEON SIGN CO.
- EQSep 10, 1992ROCKLEDGE SCAFFOLDING CORP
- PLJan 15, 1992R.D. MORTMAN & COMP INC.
- SGNov 16, 1990PATIO AWNING-H&M AWNING CORP.
- OTAug 14, 1990INTERIOR GROUP LTD