CurbScoop
CurbScoopBuildingsManhattan Beach110 SHORE BOULEVARD

110 SHORE BOULEVARD

Brooklyn· Manhattan Beach· built 1940class D4BBL 3087260001

110 SHORE BOULEVARD is a 69-unit building in Manhattan Beach, Brooklyn, built in 1940.

3 units are on the market here right now.

City records show 28 DOB permits and 80 open violations on file.

Units (res)
69
Floors
6.0
Lot ft²
15,600 ft²
Bldg ft²
81,000 ft²
Assessed
$3.57M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
110 SHORE BOULEVARD #1L
Brooklyn · built 1940
Manhattan Beach$529K$5291,000 ft²2 bd · 1 ba-82
29 HPD-C33 DOB
60.5Source
110 SHORE BOULEVARD #5A
Brooklyn · built 1940
Manhattan Beach$285K$407700 ft²studio · 1 ba-133
29 HPD-C33 DOB
60.5Source
110 SHORE BOULEVARD #5K
Brooklyn · built 1940
Manhattan Beach$425K$4251,000 ft²2 bd · 1 ba-53
29 HPD-C33 DOB
60.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    May 5, 2026 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING NORTH AND SOUTH SECTION AT PUBLIC HALL, 6th STORY
    Jan 5, 2026 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT NORTH AND SOUTH SECTION AT PUBLIC HALL, 6th STORY
    Jan 5, 2026 · NOV SENT OUT
  • B
    § 27-2038 ADM CODE PROVIDE ADEQUATE LIGHTING FOR LIGHT FIXTURE AT CEILING AT NORTH SECTION AT PUBLIC HALL, 5th STORY
    Jan 5, 2026 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING AT PUBLIC HALL, 6th STORY
    Dec 5, 2025 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY
    Dec 5, 2025 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER DOOR IN THE COMPACTOR CLOSET AT PUBLIC HALL, 1st STORY
    Dec 5, 2025 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AT PUBLIC HALL, 6th STORY
    Dec 5, 2025 · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT THE COMPACTOR CLOSET DOOR AT PUBLIC HALL, 1st STORY
    Dec 5, 2025 · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 20, 2025 · INFO NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 10, 2025 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON FIRE DOOR AT PUBLIC HALL, 4th STORY
    May 14, 2025 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY COVER FOR ELECTRICAL OUTLET 1ST AND 2ND FROM NORTH AT EAST WALL AT PUBLIC HALL, 1st STORY
    May 14, 2025 · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON FIRE DOOR AT PUBLIC HALL, 3rd STORY
    May 14, 2025 · NOV SENT OUT
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 1st STORY
    May 14, 2025 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY COVER FOR ELECTRICAL OUTLET 1ST AND 2ND FROM NORTH AT WEST WALL AT PUBLIC HALL, 1st STORY
    May 14, 2025 · NOV SENT OUT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 6th STORY
    Dec 17, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 6th STORY
    Dec 17, 2024 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY
    Dec 17, 2024 · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 29, 2024 · INFO NOV SENT OUT
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF BUSHES OBSTRUCTING DROP LADDER AT FIRE ESCAPE, 1ST FROM NORTH AT BUILDING WEST YARD
    Sep 11, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF BUSHES OBSTRUCTING DROP LADDER AT FIRE ESCAPE, 2ND FROM NORTH AT BUILDING WEST YARD
    Sep 11, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 6th STORY
    May 20, 2024 · NOV SENT OUT
  • B
    § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF PLASTIC CANS AT PUBLIC HALL, 6th STORY
    May 20, 2024 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY
    May 20, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY
    May 20, 2024 · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF PERMANENTLY INSTALLED KICKDOWN DOOR STOPPER AT VESTIBULE DOOR
    May 20, 2024 · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF PERMANENTLY INSTALLED KICKDOWN DOOR STOPPER AT BUILDING ENTRANCE DOOR
    May 20, 2024 · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICKSTAND DOOR STOPPER AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
    Apr 12, 2024 · VIOLATION CLOSED
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICKSTAND DOOR STOPPER AT BUILDING ENTRANCE AT PUBLIC HALL, 1st STORY
    Apr 12, 2024 · VIOLATION CLOSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 11, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 26, 2023 · #6A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WITH FIRE RETARDANT MATERIALS AT CEILING AT PUBLIC HALL, 6th STORY
    Dec 26, 2023 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 6th STORY
    Dec 26, 2023 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY
    Dec 26, 2023 · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 22, 2023 · INFO NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16082571 ISSUED 07-JUL-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Jul 7, 2023 · #4D · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 7, 2023 · #4D · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 7, 2023 · #4D · VIOLATION CLOSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 7, 2023 · #4D · NOV SENT OUT
DOB permits (last 30)
  • ALApr 17, 1998
    R & R CONST OF TRI STATES INC
  • ALJul 8, 1996
    ORBIT CONSTRUCTION ENTERPRISE
  • PL-
    ORBIT PLUMBING AND HEATING
  • PL-
    COMMUNITY PLBG&HTG OF NY
  • OT-
    B & Z CEILING CONSTRUCTION INC.
  • AL-
    R & R CONST OF TRI STATES INC
  • PL-
    ALJER PLBG AND HTG CORP
  • OT-
    BHW CONTRACTING INC
  • OT-
    SNOW LEOPARD CONST INC
  • BL-
    EAST COAST PETROLEUM INC
  • FB-
    EAST COAST PETROLEUM INC
  • PL-
    COMMUNITY PLBG&HTG OF NY
  • EQ-
    ORBIT CONSTRUCTION ENTERPRISE
  • AL-
    ORBIT CONSTRUCTION ENTERPRISE
  • EQ-
    PHOENIX BUILDING RESTORER INC
  • EQ-
    NEW YORK LADDER CORPORATION
  • PL-
    GREGG NY PLBG
  • OT-
    ELAN CONSTRUCTION INC
  • OT-
    SAVION CONSTRUCTION INC
  • OT-
    EAST COAST PETROLEUM CORP
  • FB-
    EAST COAST PETROLEUM INC
  • BL-
    EAST COAST PETROLEUM INC
  • FS-
    EAST COAST PETROLEUM INC
  • PL-
    EAST COAST MECHANICAL LLC
  • EQ-
    PHOENIX BUILDING RESTORER INC
  • AL-
    ORBIT CONSTRUCTION ENTERPRISE
  • EQ-
    NEW YORK LADDER CORPORATION
  • AL-
    ORBIT CONSTRUCTION ENTERPRISE
DOB violations
  • Jun 23, 2024EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Dec 1, 2022EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Aug 21, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Feb 22, 2022FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Dec 4, 2021E-ELEVATOR ELEVATORREQUIRED
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Aug 30, 2021C-CONSTRUCTION OTHER OPTIONAL
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 29, 2020EARCX-FAILURE TO SUBMIT EER NONE
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Mar 27, 2018EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Oct 25, 2017E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 28, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 10, 2015EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 1, 2014BENCH-FAILURE TO BENCHMARK NONE
  • Nov 4, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jan 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 20, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 21, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 25, 2007L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 8, 2007E-ELEVATOR ELEVATORREQUIRED

More buildings in Manhattan Beach

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:3087260001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jul 9, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
28 permits in the current corpus · latest record Apr 17, 1998

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
110 violations in the current corpus · latest record May 5, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
53 violations in the current corpus · latest record Jun 23, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Manhattan Beach market page.